My WebLink
|
Help
|
About
|
Sign Out
Home
Search
04/13/2005 P&Z Packet
LinoLakes
>
Advisory Boards & Commissions
>
Planning & Zoning Board
>
Packets
>
2005
>
04/13/2005 P&Z Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/19/2014 3:06:25 PM
Creation date
6/19/2014 9:38:53 AM
Metadata
Fields
Template:
P&Z
P&Z Document Type
P&Z Packet
Meeting Date
04/13/2005
P&Z Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
135
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
/ <br />/ <br />/ <br />/ <br />/ <br />/ <br />/ <br />/ <br />/ <br />/ <br />/ <br />/ <br />/ O . <br />• <br />4 f <br />J <br />* I / ,`t>; / I I ( / <br />4D <br />• 1 ti. / r 4 } I ) <br />/ <br />f * 'iC `I �i , A�.� I <br />I l /* • ,. <br />1 <br />1 <br />(412- 1 <br />C1 <br />/ <br />/ / <br />// <br />/ / <br />/ <br />) <br />/I <br />/ )/O / (' <br />/ <br />3 <br />/ <br />/ <br />/ <br />+80000 <br />+800.00 <br />1000 <br />LEGEND <br />BGIEL <br />PLACE BOTTOM EDGE OF FENCE <br />INTO 6" DEEP TRENCH <br />AND BACKFILL IMMEDIATELY. <br />FILE COPY <br />PROPOSED SPOT ELEVATION <br />EXISTING SPOT ELEVATION <br />EXISTING CONTOURS <br />PROPOSED CONTOURS <br />TREE LINE <br />EXISTING SANITARY SEWER <br />EXISTING STORM SEWER <br />EXISTING WATER MAIN <br />PROPOSED STORM SEWER <br />HAY BALE CHECK DAM <br />PROPOSED SILT FENCE <br />EXISTING ASPHALT SURFACE <br />TEMPORARY ROCK <br />CONSTRUCTION ENTRANCE <br />POSTS or ON CENTER <br />POSTS SHALL BE 2"X2" <br />HARDWOOD. PINE OR STANDARD <br />STEEL FENCE POSTS. POSTS <br />SHALL BE DRIVEN 24" <br />INTO THE GROUND. <br />_• <br />irra <br />GENERAL O 80180 NOTES: <br />1. SPECIFICATIONS WHICH APPLY ARE THE MOST RECENT EDITIONS OF THE <br />MUNICIPALITY IN VAACH THE WORK I5 LOCATED AND THE MINNESOTA <br />DEPARTMENT OF TRANSPORTATION SPECIFICAT0N5 FOR HIGHWAY <br />CONSTRUCTION UNLESS MODIFIED HEREIN ON THESE CONTRACT DOCUMENTS. <br />2. IT 15 THE RESPONSBIUTY OF 114E CONTRACTOR TO UTUZE THE <br />"GOPHER STATE ORE CALL" EXCAVATION NOTICE SYSTEM AS REQUIRED UNDER <br />MINNESOTA STATUTE CHAPTER 2160, 48 HOURS PRIOR TO PERFORMING ANY <br />EXCAVATION (PHONE 651 -454 -0002 IN THE TWIN CITIES METRO AREA CR <br />TOLL FREE 1- B00- 252 - 1166). <br />3. GRADING CONTRACTOR SHALL VERIFY LOCATIONS AND ELEVATIONS OF <br />ALL UNDERGROUND UTILITIES WITH THE RESPECTIVE UTILITY COMPANIES <br />PRIOR TO CONSTRUCTION. <br />4. ALL CONSTRUCTION AS CALLED FOR ON THESE CONTRACT DOCUMENTS <br />SHALL BE PERFORMED IN ACCORDANCE 'WITH ALL OSHA REQUIREMENTS <br />5. ALL LOT AND EASEMENT DIMENSIONS ARE SUBJECT TO FINAL PLAT. <br />6. ALL EROSION CONTROL MEASURES CALLED FOR ON THESE PLANS AND <br />SPECIFICATIONS, WI41CH MAY INCLUDE SILT FENCE. SEDIMENTATION <br />BASINS OR TEMPORARY SEDIMENT TRAPS. SHALL 8E CONSTRUCTED AND <br />SERVICEABLE IN THE FOLLOWING ORDER, AS REQUIRED, AND IN COMPLIANCE <br />WITH PART 10 OF THE MPG* GENERAL STORM WATER PERMIT (SEE "NPDES <br />REQUIREMENTS"). <br />a ROCK CONSTRUCTOR ENTRANCES. <br />9.. SILT FENCE. <br />TEMPORARY CULVERTS. <br />d. TEMPORARY SEDIMENTATION BASINS AND OU1FALL FAOUTES. <br />e. STORM WATER POND CONSTRUCTION. <br />T. COMMON EXCAVATION ANO EMBANKMENT (GRADING CONSTRUCTION). <br />9. SEED AND MULCH (SEE NOTE 14). <br />h. STRAW BALE BARRIERS IN FINISHED GRADED MEAS. <br />1. INLET AND OUTLET FACILITIES SUBSEQUENT TO STORM SEWER <br />CONSTRUCTION. <br />7. GRADING CONTRACTOR SHALL PROVIDE AND MAINTAIN ALL EROSION <br />CONTROL MEASURES AS SHOWN ON TIHESE PLANS AND SPECIFICATIONS <br />AND IMPLEMENT ANY ADDITIONAL EROSION CONTROL MEASURES <br />NECESSARY IN ORDER TO PROTECT ADJACENT PROPERTY. <br />6. ALL EROSION CONTROL FACILITIES SHALL BE MAINTAINED BY THE <br />GRADING CONTRACTOR DURING GRADING OPERATIONS. ANY TEMPORARY <br />FACIUTIES WHICH ARE TO BE REMOVED AS CALLED FCR ON THESE PLANS <br />AND SPECIFICATIONS SHALL BE REMOVED BY 116E GRADING CONTRACTOR <br />WHEN DIRECTED BY THE ENGINEER. THE GRADING CONTRACTOR SHALL <br />THEN RESTORE THE SUBSEQUENTLY DISTURBED AREA IN ACCORDANCE <br />WITH THESE PLANS AND SPECIFICATIONS. <br />9. IT I5 THE RESPONSIBIUTY OF THE GRADING CONTRACTOR TO DISPOSE <br />OFF -STE ALL TREES, STUMPS, BRUSH, OR OTHER DEBRIS 114AT EMSTS <br />WITHIN THE CONSTRUCTION AREAS; DISPOSAL SHALL BE IN COMPLIANCE <br />WITH .MPCA REQUIREMENTS TREES TO REMAIN SHALL BE DESIGNATED BY <br />THE ENGINEER. <br />10. THE GRADING CONTRACTOR SHALL SCHEDULE THE S0.5 ENGINEER SO <br />THAT CERTIFICATION OF ALL CONTROLLED' FILLS CAN BE FURNISHED TO <br />THE OWNER DURING AND UPON COMPLETION OF THE PROJECT. <br />11. DENSITY TESTS SHALL BE TAKEN TO EVALUATE THE COMPACTION WITHIN <br />THE STREETS TRAVEL WAYS OR PARKING LOTS WITHIN THE UPPER 3 FEET <br />OF STREET SUB GRADE THE CONTRACTOR SHALL INSURE THAT ALL SOILS <br />BE NOT MORE THAN ONE PERCENTAGE POINT OVER THE SOIL'S STANDARD <br />PROCTOR OPTIMUM MOISTURE CONTENT, AND THAT COMPACTOR TO A <br />MINIMUM OF 10061 OF STANDARD PROCTOR DENSITY BE PROVIDED. IN <br />AREAS BELOW THE UPPER THREE FEET OF SUBGRADE OF TIE STREETS, <br />TRAVEL WATS OR PARKING LOTS THE CONTRACTOR SHALL INSURE THAT <br />ALL SOILS BE NOT MORE THAN THREE PERCENTAGE POINTS OVER TIE <br />SOILS STANDARD PROCTOR OPTIMUM MOISTURE CONTENT. AND THAT <br />COMPACTOR TO A MINIMUM OF 95X OF STANDARD PROCTOR DENSITY BE <br />PROVIDED. THE GRADING TOLERANCE FOR THESE AREAS SHALL BE <br />WITHIN 0.1'3. <br />12. LOT GRADING AND /OR THE PREPARATION OF BUILDING PADS SHALL BE <br />CONSTRUCTED IN ACCORDANCE 'WITH THESE PLANS AND SPEOFICATONS <br />THE GRADING TOLERANCE SHALL BE 0.25'3. ALL EARTHWORK OPERATIONS <br />SHALL BE PERFORMED IN ACCORDANCE WITH 144E HUD -FHA DATA SHEET <br />79G "LAND DEVELOPMENT WITH CONTROLLED EARTHWORK ", PROVIDING <br />FOR A MINIMUM OF 95% STANDARD DENSITY, OR AS OTHERWISE SPECIFIED <br />BY THE GEO- TECHNICAL ENGINEER. <br />13. BUILDING PADS SHOWN ON EACH LOT ARE TYPICAL ONLY. THE DEPTH OF THE <br />PAO FROM FRONT TO BACK SHALL BE GRADED THROUGHOUT THE FULL WIDTH <br />OF THE LOT OR AS NECESSARY TO ALLOW FOR CONSTRUCTION OF A BUILDING <br />AT THE MINIMUM SIDE YARD SETBACKS (REFER TO THE PLANS FOR SPECIFIC <br />SETBACK DISTANCES.) IF UNSUITABLE SOIL CONDITIONS ARE ENCOUNTERED <br />WITHIN A PROPOSED BUILDING PAO THAT CANNOT BE CORRECTED OR <br />REMOVED, IT 15 THE RESPSONSIBIUTY OF THE CONTRACTOR TO NOTIFY <br />THE ENGINEER OF THE CONDITIONS AND TO LOCATE THE UNITS OF THE <br />UNSUITABLE AREAS. <br />14. UNLESS OTMERVA5E SPECIFICALLY NOTED, 114E 0001011ING SITE <br />RE- VEGETATION TECHNIQUES SHALL BE IMPLEMENTED. ALL DISTURBED <br />AREAS, EXCEPT STREETS SHALL BE COVERED WITH A MINIMUM OF <br />6" TOPSOIL AND SHALL BE SEEDED WITH Mn00T j250 (GENERAL SEED) MIX <br />AT 70 LBS. /ACRE SEEDED AREAS SHALL BE MULCHED 68114 MnOOT TYPE 1 <br />AT 2 TONS/ACRE AND DISC ANCHORED. SEEDING AND MULCHING SHALL <br />BE COMPLETED WITHIN 2 WEEKS AFTER EARTH MOWING OPERATIONS <br />ARE COMPLETED. ALL SLOPES THAT EXCEED 3(14):1(8) SHALL BE SEEDED <br />WITH A WOOD FIBER BLANKET. FERTUZER SHALL BE 22 -5-10 BOX W.I.N. <br />0% CI OR EQUIVALENT AND APPLIED AT 350 POUNDS PER ACRE FERTUZER <br />15 TO BE INCORPORATED INTO THE TOP 3 TO 4 INCHES BY DI5UTNG OR <br />SOME 01ER SUITABLE MEANS. WHEN SEEDING AFTER NOVEMBER 1, <br />OR WHEN TEMPERATURES DO NOT EXCEED 40 DEGREES FAHRENHEIT. <br />THE CONTRACTOR SHALL DORMANT SEED ALONG ALL DISTURBED AREAS <br />DORMANT SEED BED PREPARATION, SEEDING RATES, AND MULCH <br />REQUIREMENTS SHALL BE THE SAME AS THOSE DESCRIBED IN THIS <br />50CT0N EXCEPT THAT NO SEED SHALL BE PLACED ON SNOW OR ICE <br />WHICH 15 GREATER THAN 2 INCHES IN DEPTH. ANY SEEDED AREAS WHICH <br />DO NOT BECOME ESTABUSHEO SHALL BE RE- SEEDED AT 114E <br />CONTRACTOR'S EXPENSE. <br />15. IT I5 THE RESPONSIBILITY OF THE CONTRACTOR TO KEEP PUBLIC <br />STREETS. TRAVEL WAYS. PARKING LOTS AND TRAILS FREE OF DIRT AND <br />OTHER DEBRIS WHICH RESULTS FROM SAID GRADING CONSTRUCTION. <br />SPFOFIC CRATING 80505; <br />1. THE EXISTING TOPOGRAPHY AND CONTOUR ELEVATIONS ON THE PLANS <br />WERE PROVIDED BY JAMES R. HILL, INC. ON OR ABOUT 03/07/05. THE <br />DEGREE OF ACCURACY OF THE EXISTING CONTOURS SHOWN ON THE PLAN <br />I5 EQUAL TO 3 ONE HALF TIE CONTOUR INTERVAL <br />i1A R 1 2005 <br />EROSION CONTRO F N <br />TIVE19U.M0 <br />rµ <br />0 <br />SCALE IN FEET <br />30 60 <br />1 inch = 30 feet <br />90 <br />VI <br />= n <br />N Z <br />N 3 <br />� m� <br />CC W m < <br />W os A <br />Cr) 2 <br />n <br />z ° <br />Z W <br />J n <br />o <br />Y W <br />_, <br />U <br />z <br />U <br />DRAWN BY <br />TDL <br />DATE <br />03/10/05 <br />REVISIONS <br />CAD FILE <br />21804G <br />PROJECT NO. <br />21804 <br />SHEET 1 OF 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.