My WebLink
|
Help
|
About
|
Sign Out
Home
Search
08/10/2005 P&Z Packet
LinoLakes
>
Advisory Boards & Commissions
>
Planning & Zoning Board
>
Packets
>
2005
>
08/10/2005 P&Z Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/19/2014 2:20:33 PM
Creation date
6/19/2014 11:47:36 AM
Metadata
Fields
Template:
P&Z
P&Z Document Type
P&Z Packet
Meeting Date
08/10/2005
P&Z Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
86
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br />In the Neighborhood Business District all signs must comply with the requirements <br />in table in Section IV, paragraphs EE and FF. <br />No sign may be closer than five (5) feet to any property line. <br />1. Business Signs: <br />a. Sign or signs attached to building equaling twenty percent (20 %) of <br />the building face area or fifty (50) square feet, whichever is greater; <br />b. One ground sign or pylon sign up to fifty (50) square feet; not higher <br />than thirty (30) feet; not closer than fifty (50) feet to another such <br />integrated retail complex. <br />2. Multi Occupancy Business Signa <te: When a single principle building is <br />devoted to three (3) or more businesses, signage must comply with Section <br />IV. Z. of this ordinance-and-shall-bene ground sign of one <br />.. <br />(73-0-)-f <br />3. Advertising. Signs: Advertising signs, as defined by Section II, Subd. .F of <br />this Ordinance, are prohibited in the NB Zoning District. <br />e. "SC" Sh : - ! ' • Shopping Center district deleted from <br />zoning ordinance, per Ordinance 04 -05, second reading scheduled July 11, 2005 <br />Purpose. This zoning classification is reserved for modern retail shopping <br />facilities of integrated design in appropriate locations. Potential shopping center <br />ual need shown -and construction of the center <br />can be expected within two years following such zoning. This will allow potential <br />over zoning for commercial development. <br />ial activity and public <br />2. To provide a flexible means to zone land for WITH <br />later date when there is justification. <br />DRAFT 8/4/05 <br />Ordinance 05 -05, Sign Ordinance page 8 of 30 <br />
The URL can be used to link to this page
Your browser does not support the video tag.