My WebLink
|
Help
|
About
|
Sign Out
Home
Search
09/27/2005 P&Z Packet
LinoLakes
>
Advisory Boards & Commissions
>
Planning & Zoning Board
>
Packets
>
2005
>
09/27/2005 P&Z Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/24/2014 1:27:00 PM
Creation date
6/20/2014 10:29:23 AM
Metadata
Fields
Template:
P&Z
P&Z Document Type
P&Z Packet
Meeting Date
09/27/2005
P&Z Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Comprehensive Plan Amendment <br />Village of Hardwood Creek <br />page 12 <br />Total <br />363 acres <br />Commercial <br />500,000 to <br />600,000 sf <br />55 to 70 acres <br />Residential <br />Single family <br />400 to 420 units <br />Multi - family <br />800 to 830 units <br />1200 to 1250 units <br />150 to 170 acres <br />Open Space <br />80 to 95 acres <br />Public Right of Way <br />55 acres <br />5) A Staging and Time Schedule of Development. <br />The submittal includes a phasing plan. The site would develop from south to <br />north, with over half the commercial development and some residential in phase one. <br />Phase two would include the rest of the commercial area and a large amount of <br />residential. Phases three and four would continue the residential development. The <br />developer envisions full build out of the site over six years. <br />6) Other Special Criteria for Development. <br />The AUAR has not yet been completed. Much of the project design will depend <br />on the AUAR, particularly the mitigation plan. <br />In addition, several roadway issues must be resolved. These include the design of <br />the I -35E interchange and the final design for the intersection at 21St Ave. and Main <br />St. <br />Timing will be another important aspect of this development. Transportation <br />infrastructure is needed to support a development of this size. In addition, <br />improvements to the water and sanitary sewer infrastructure will be needed to support <br />full build out of the project. The extent and timing of site development will rely <br />heavily upon these issues. The City Engineer's memo is attached. <br />What can be seen in the concept plan is an extensive open space /greenway <br />network. This will provide for trail connections, stormwater treatment, buffering <br />from the freeway, and the potential for wildlife habitat. <br />Though we don't have design details, the developer is including many <br />conservation development elements in the site design. We'll see more with the PUD <br />application. We are encouraged and support the efforts so far. <br />ENVIRONMENTAL BOARD <br />The Environmental Board discussed the application on August 31. Because this is not an <br />actual plat application with specifics, the Board's recommendation is general: "The <br />
The URL can be used to link to this page
Your browser does not support the video tag.