My WebLink
|
Help
|
About
|
Sign Out
Home
Search
11/09/2005 P&Z Packet
LinoLakes
>
Advisory Boards & Commissions
>
Planning & Zoning Board
>
Packets
>
2005
>
11/09/2005 P&Z Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/24/2014 12:57:24 PM
Creation date
6/20/2014 11:36:55 AM
Metadata
Fields
Template:
P&Z
P&Z Document Type
P&Z Packet
Meeting Date
11/09/2005
P&Z Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
33
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br />AGENDA ITEM V.A. <br />STAFF ORIGINATOR: Paul Bengtson <br />P & Z MEETING DATE: November 9, 2005 <br />TOPIC: WITHRAWAL OF PRELIMINARY PLAT APPLICATION <br />JADT SECOND ADDITION <br />SHEET METAL WORKERS FEDERAL CREDIT UNION <br />BACKGROUND <br />The original application for the Sheet Metal Workers Federal Credit Union included a preliminary plat to <br />combine lots 2 and 3 of block 1, JADT Addition. This accompanied a Site Plan Review for the proposed <br />financial institution. The applicant has revised their plans and is withdrawing the Preliminary Plat application <br />and intends to build exclusively on one of the existing lots. As the Site Plan Review is no longer accompanied <br />by an additional land use entitlement request, it will be completed administratively. <br />The public hearing for this item was properly noticed and therefore should be acknowledged at the meeting and <br />the public should be informed that the application was withdrawn. <br />• <br />• <br />
The URL can be used to link to this page
Your browser does not support the video tag.