|
NOTES:
<br />HAND LOOSEN ROOTS OF CONTAINERIZED MATERIAL.
<br />SCARIFY BOTTOM &SIDES OF HOLE PRIOR TO PLANTING.
<br />LANDSCAPE
<br />FABRIC
<br />TOP SOIL
<br />SUBGRADE
<br />SHRUBS TO SIT
<br />ON SUBGRADE
<br />MULCH; 4" DEEP
<br />SHREDDED BARK
<br />SOD
<br />P.V.C. EDGING
<br />PLANTING SOIL
<br />CENTERING OF SHRUB
<br />IN BED TO TAKE PRECEDENCE
<br />OVER DIMENSION FROM EDGE
<br />°DECIDUOUS SHRUB DETAIL
<br />1/2 "- I'S'
<br />STRAP; 16"X 1 I/2" WIDE
<br />POLYPROPYLENE OR
<br />POLYETHYLENE
<br />�- FLAGGING;
<br />014E PER WIRE
<br />SOD
<br />TOP SOIL
<br />SUBGRADE
<br />]I LI °ILi I III
<br />ROOTBALL TO SIT
<br />NOTES: ON SUBGRADE
<br />SCARIFY BOTTOM & SIDES OF HOLE PRIOR TO PLANTING.
<br />2" X 2"X 24"
<br />WOOD STAKE SETA ANGLE
<br />TWO ALTERNATE METHODS OF TREE STAKING ARE ILLUSTRATED.
<br />IT IS THE CONTRACTOR'S OPTION TO STAKE TREES; HOWEVER,
<br />THE CONTRACTOR IS RESPONSIBLE FOR MAINTAINING TREES IN A
<br />PLUMB POSITION THROUGHOUT THE GUARANTEE PERIOD.
<br />°DECIDUOUS TREE DETAIL
<br />1/2 "- I,-0•
<br />DOUBLE STRAND
<br />14 GA WIRE
<br />36" W 120 °
<br />INTERVALS
<br />STRAP; 16'X 1 1/2" WIDE
<br />POLYPROPYLENE OR
<br />POLYETHYLENE
<br />FLAGGING;
<br />ONE PER WIRE
<br />MULCH; 4' DEEP
<br />SHREDDED BARK
<br />SOD
<br />TOP SOIL
<br />SUBGRADE
<br />2 "X 2 "X 24'
<br />WOOD STAKE
<br />SETA ANGLE
<br />ROOTBALL TO SIT PLANTING
<br />ON SUBGRADE SOIL
<br />NOTES:
<br />CONIFER TO HAVE HARDWOOD MULCH UNLESS OTHERWISE NOTED.
<br />140 MULCH TO BE IN CONTACT WITH TRUNK.
<br />SCARIFY BOTTOM & SIDES OF HOLE PRIOR TO PLANTING.
<br />TWO ALTERNATE METHODS OF TREE STAKING ARE ILLUSTRATED.
<br />IT IS THE CONTRACTOR'S OPTION TO STAKE TREES; HOWEVER,
<br />THE CONTRACTOR IS RESPONSIBLE FOR MAINTAINING TREES IN A
<br />PLUMB POSITION THROUGHOUT THE GUARANTEE PERIOD.
<br />°CONIFEROUS TREE DETAIL
<br />I/2 • 1'-0"
<br />NOTES:
<br />CONIFER TO HAVE HARDWOOD MULCH UNLESS OTHERWISE NOTED.
<br />NO MULCH TO BE IN CONTACT WITH TRUNK
<br />SCARIFY BOTTOM & SIDES OF HOLE PRIOR TO PLANTING.
<br />LANDSCAPE
<br />FABRIC
<br />TOP SOIL
<br />SUBGRADE
<br />ROOTBALL TO
<br />SET ON
<br />SUBGRADE
<br />CONIFEROUS SHRUB
<br />MULCH; 4" DEEP
<br />SHREDDED BARK
<br />SOD
<br />P.V.C. EDGING
<br />PLANTING SOIL
<br />CENTERING OF SHRUB
<br />IN BED TO TAKE PRECEDENCE
<br />OVER DIMENSION FROM EDGE
<br />DETAIL
<br />1/2 "- 1' -0"
<br />QUANITY
<br />COMMON NAME
<br />BOTANICAL NAME
<br />SIZE
<br />TED
<br />LITTLE BLUESIEM
<br />SCHIAZCHYRIUM SCOPARIUM
<br />6 "POT 18" O.C. STAGGER
<br />PILAUS NIGRA
<br />46'B&8
<br />PURPLE CONEFLOWER
<br />ECHINACEA PURPUREA
<br />6" POT 18" O.C. STAGGER
<br />PICEA GLAUCA "DENSATA"
<br />4,6' Et & B
<br />STELLA DE ORO
<br />HEMMEROCALUS "STELA A DE ORO"
<br />6" POT 12" O.C. STAGGER
<br />FRAXINUS PENNSYLVANICA 'MARSHALL"
<br />2 "B & B
<br />GOLDSTURM, BLACK-EYED SUSAN
<br />RUDBECKIA "COLDSTURM."
<br />6 "POT 12' O.C. STAGGER
<br />OPERENNIAL BED PLANTING LEGEND
<br />05
<br />°PLANTING LEGEND
<br />BIRCH STREET
<br />■*.p `Mal/
<br />PIA
<br />pinuiiuiiai■ii mmam ���ummu mCmummuiiiiiiii
<br />?fir ��muni �1 ea
<br />OFFICE/RETAIL/RESTAURANT
<br />12,480 SF
<br />0 LANDSCAPE PLAN
<br />PLANTING SPECIFICATIONS
<br />I. PLANTING BED PREPARATION: ALL MASS PLANTING BEDS SHALL BE TILTED TO A MINIMUM DEPTH OF
<br />10 ". AMENDMENTS SHALL BE APPLIED AFTER CULTIVATION.
<br />2 BACK FILL SOIL: USE SOIL EXCAVATED FROM PLANTING HOLES AND PROVIDE AMENDMENTS. REMOVE
<br />ALL DEBRIS INCLUDING ROCKS LARGER THAN 3" DIAMETER.
<br />3. FERTILIZATION: ALL PLANT MATERIALS SHALL BE FERTILIZED UPON INSTALLATION WITH DRIED BONE
<br />MEAL OR OTHER SPECIFIED FERTILIZER MIXED IN WITH THE PLANTING SOB PER THE MANUFACTURERS
<br />INSTRUCTIONS.
<br />4. MULCH MATERIAL: AS SPECIFIED ON THE LANDSCAPE PLANS. MASS MULCH ALL PLANDNG BEDS TO 3"
<br />DEPTH OVER FIBER MAT WEED BARRIER. ALL PERENNIAL PLANTING BEDS TO RECEIVER 3" DEEP
<br />SHREDDED HARDWOOD MULCH WITH NO FIBER MAT WEED BARRIER ALL EVERGREEN AND DECIDUOUS
<br />TREES TO RECEIVE 6' DEEP SHREDDED HARDWOOD MULCH WITH NO MULCH IN DIRECT CONTACT WITH
<br />THE TREE TRUNK.
<br />5. TREE STAKING IT SHALL BE THE CONTRACTORS RESPONSIBILITY TO STAKE AND/OR GUY THE TREES
<br />ACCORDING TO THE DETAILS. IT IS THE CONTRACTORS RESPONSIBILITY TO TAKE EVERY STEP
<br />NECESSARY TO MAINTAIN THE TREES AND SHRUBS IN AN UPRIGHT AND PLUMB CONDITION AT ALL
<br />TIMES UNTIL THE END OF THE PLANT GUARANTEE PERIOD ESPECIALLY WHERE VANDALISM, SOIL DR
<br />WIND CONDITIONS AREA PROBLEM.
<br />6. TREE WRAPPING WRAPPING MATERIAL SHALL BE QUALITY, HEAVY WATERPROOF CREPE PAPER
<br />MANUFACTURED FOR THIS PURPOSE. WRAP ALL DECIDUOUS TREES PLANTED IN THE FALL PRIOR TO 12 -I
<br />AND REMOVE ALL WRAPPING AFTER 5 -1.
<br />7. RODENT PROTECTION: PROVIDE ON ALL TREES, EXCEPT SPRUCE UNLESS OTHERWISE SPECIFIED.
<br />8. PLANTING PLAN: ALL PROPOSED PLANTS SHALL BE LOCATED CAREFULLY AS SHOWN ON THE PLANS
<br />PLAN TAKES PRECEDENCE OVER PLANT SCHEDULE IF DISCREPANCIES IN QUANTITIES EXIST.
<br />SPECIFICATIONS TAKE PRECEDENCE OVER NOTES. RESPECT STATED DIMENSIONS. DO NOT SCALE
<br />DRAWINGS.
<br />9. EDGING EDGING SHALL BE 4" P.V.C. COMMERCIAL GRADE EDGING WITH SIX (6) METAL ANCHOR STAKES
<br />PER 20 FOOT SECTION. ALL MASS PL ANTING BEDS SHALL HAVE EDGING PLACED BETWEEN MULCH AREA
<br />AND ANY ADJACENT TURF AREA.
<br />GENERAL NOTES
<br />1. LANDSCAPE CONTRACTOR TO VERIFY ALL UTILITY LOCATIONS ON PROPERTY WITH THE GENERAL
<br />CONTRACTOR AND BYCAWNG GOPHER STATE ONE CALL (454.0002) PRIOR TO STAKING PLANT
<br />LOCATIONS.
<br />2. COORDINATE THE PHASES OF CONSTRUCTION AND PLANTING INSTALLATIONS WITH OTHER
<br />CONTRACTORS WORKING ON SITE.
<br />3. WHERE EXISTING TREES AND/OR SIGNIFICANT SHRUBS MASSING ARE FOUND ON SITE, WHETHER SHOWN
<br />ON THE DRAWING OR NOT, THEY SHALL BE PROTECTED AND SAVED UNLESS NOTED TO BE REMOVED
<br />AND /OR ARE IN AN AREA TO BE GRADED, ANY QUESTION REGARDING WHETHER PLANT MATERIAL
<br />SHOULD REMAIN OR NOT SHALL BE BROUGHT TO THE ATTENTION OF THE LANDSCAPE ARCHITECT
<br />PRIOR TO REMOVAL
<br />4. ALL EXISTING TREES TO REMAIN TO BE FERTILIZED AND PRUNED TO REMOVE DEAN WOOD AND
<br />DAMAGED OR RUBBING BRANCHES.
<br />5. BB TREES AND SHRUBS ARE BALLED AND BURI APED.
<br />6. NO PLANT MATERIAL SUBSTITUTIONS WILL BE ACCEPTED UNLESS APPROVAL IS REQUESTED OF THE
<br />LANDSCAPE ARCHITECT RY THE LANDSCAPE CONTRACTOR PRIOR TO THE SUBMISSION OF A 810 AND /OR
<br />QUOTATION.
<br />7. ALL PLANT MATERIAL SHALL COMPLY WITH THE LATEST EDITION OF THE AMERICAN STANDARD FOR
<br />NURSERY STOCK, AMERICAN ASSOCIATION OF NURSERYMEN.
<br />8. CONTRACTOR IS RESPONSIBLE FOR ONGOING MAINTENANCE OF ALL NEWLY INSTALLED MATERIALS
<br />UNTIL TIME OF OWNER ACCEPTANCE ANY ACTS OF VANDALISM OR DAMAGE WHICH MAY OCCUR PRIOR
<br />TO OWNER ACCEPTANCE SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR.
<br />9. CONTRACTOR SHALL PROVIDE A WRITTEN REQUEST FOR THE OWNER ACCEPTANCE INSPECTION.
<br />10. WARRANTY FOR LANDSCAPE MATERIALS SHALL BEGIN ON THE DATE OF ACCEPTANCE BY THE
<br />LANDSCAPE ARCHITECTAFTER THE COMPLETION OF PLANTING OF ALL LANDSCAPE MATERIALS NO
<br />PARTIAL ACCEPTANCE WILL RE CONSIDERED.
<br />I I. CONTRACTOR SHALL GUARANTEE NEW RANT MATERIAL THROUGH ON CALENDAR YEAR FROM THE
<br />DATE OF OWNER ACCEPTANCE WITH ALL REPLACEMENTS TO BE PROVIDED AT NO ADDITIONAL COST TO
<br />THE OWNER.
<br />PLANTING NOTES
<br />1. NO PLANTING TO BE INSTALLED UNTIL GRADING AND CONSTRUCTION HAS BEEN COMPLETED IN THE
<br />IMMEDIATE AREA.
<br />2. ALL PLANT MATERIAL LOCATIONS MUST BE REVIEWED AND APPROVED BY THE LANDSCAPE ARCHITECT
<br />PRIOR TO ANY AND ALL DIGGING.
<br />3. IF THE LANDSCAPE CONTRACTOR PERCEIVES ANY DEFICIENOES IN THE PLANT SELECTIONS, SOIL
<br />CONDITIONS, OR ANY OTHER SITE CONDITION WHICH MIGHT NEGATIVELY AFFECT PLOT MATERIAL
<br />ESTABLISHMENT SURVIVAL, OR GUARANTEE, THEY SHALL BRING THESE DEFICIENCIES TO THE
<br />ATTENTION OF THE LANDSCAPE ARCHITECT PRIOR TO INSTALLATION.
<br />4. ADJUSTMENTS IN LOCATION OF PROPOSED PLANTMATDUALS MAY BE NEEDED IN FIELD. SHOULD AN
<br />ADJUSTMENT BE ADVISED, THE LANDSCAPEARGIITECT MUST BE NOTIFIED.
<br />5. ALL PLANTS TO RE INSTALLED AS PER PLANTING DETAILS
<br />6. ONE SHRUB PER TYPE AND SIZE IN EACH PLANTING BED AND EVERY TREE SHALL BE CLEARLY IDENTIFIED
<br />(COMMON OR LATIN NOMENCLATURE) WITH A PLASTIC TAG WHICH SHALL NOT BE REMOVED PRIOR TO
<br />OWNER ACCEPTANCE.
<br />7. WHERE 5OD/SEED ABUTS PAVED SURFACES, FINISHED GRADE OF SOD /SEED SHALL BE HELD I "BELOW
<br />SURFACE ELEVATION OF TRIAL, SLAB, CURB, ETC
<br />8. SOD SHALL BE LAID PARALLEL TO THE CONTOURS AND SHALL HAVE STAGGERED JOINTS ON SLOPES
<br />STEEPER THAN 3:1 OR IN DRAINAGESWALES, TNESOD SHALL BE STAKED TO THE GROUND.
<br />9. SEED ALL AREAS DISTURBED DUE TO GRADING OTHER THAN THOSE AREAS NOTED TO RECEIVE SOD.
<br />10. REPAIR ALL DAMAGE TO PROPERTY FROM PLANTING OPERATIONS AT NO COST TO THE OWNER.
<br />IRRIGATION NOTES
<br />1. LANDSCAPE CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDINGA SHOP DRAWING ILLUSTRATING AN
<br />IRRIGATION PLAN AND SPECIFICATION AS PART OF THE SCOPE OF WORK WHEN BIDDING. THESE SHALL
<br />BE APPROVED BY THE LANDSCAPEAROIITECT PRIOR TO ORDER.
<br />2. VERIFY DOSTINCJPROPOSED IRRIGATION SYSTEM LOCATION.
<br />3. UNLESS OTHERWISE NOTED ALL SOD /SEED AND PLANTING AREAS INDICATED ON PLAN SHALL BE 100 k'
<br />IRRIGATED. THE IRRIGATION SHALL INCLUDE THE PUBLIC RIGHT OF WAY BETWEEN PROPERTY UNEAND
<br />BACK OF CURB OR SOUND WALL WHERE NEW LANDSCAPE IMPROVEMENTS ARE PROPOSED.
<br />4. IT SHALL BE THE LANDSCAPE CONTRACTOR'S RESPONSIBILITY TO INSURE THAT ALL SODDED/SEEDED
<br />AND PLANTED AREAS ARE IRRIGATED PROPERLY, INCLUDING THOSE AREAS DIRECTLY AROUND AND
<br />ABUTTING BUILDING FOUNDATION.
<br />S. THE LANDSCAPE CONTRACTOR SHALL PROVIDE THE OWNER WITH A WATERING/LAWN IRRIGATION
<br />SCHEDULE APPROPRIATE TO THE PROJECT SITE CONDITIONS AND TO PLANT MATERIAL GROWTH
<br />REQUIREMENTS.
<br />FEB 2006
<br />0
<br />30
<br />60
<br />100
<br />1
<br />A. Peter Hiiger #151
<br />I hereby certify that this plan and specific/
<br />was prepared by ma or under my supervi
<br />and that I am a duly registered architect u
<br />the laws of to State of Minnesota as sigr
<br />by my hand and seal.
<br />Issue R
<br />CITY SUBMITTAL 12
<br />Supervising
<br />Roseville
<br />2340 Lexington Ave. North
<br />Roseville, MN 55113
<br />P. 651.631.1300 N 651.631:15
<br />Proiest Archtest
<br />APH
<br />PmiecIR prawn By OheeN
<br />RA05 -010 SEB AF
<br />Issl
<br />CITY SUBMI
<br />Sheet t
<br />•
<br />QUAMT'
<br />COMMON NAME
<br />BOTANICAL NAME
<br />SIZE
<br />O6
<br />AUSTRIAN PINE
<br />PILAUS NIGRA
<br />46'B&8
<br />©
<br />4
<br />BLACKMLLS SPRUCE
<br />PICEA GLAUCA "DENSATA"
<br />4,6' Et & B
<br />®
<br />15
<br />MARSHALLS ASH
<br />FRAXINUS PENNSYLVANICA 'MARSHALL"
<br />2 "B & B
<br />O2
<br />REDMOND LINDEN
<br />TILIA XEUCHLORA 'REDMOND"
<br />2 "8 & B
<br />©
<br />4
<br />NORTHWOOD MAPLE
<br />AfER RUBRUM "NORTHWOOD'
<br />2"8 & 8
<br />O7
<br />RADIANT CRABAPPLE
<br />HALOS "RADIANT
<br />I "B & B
<br />4
<br />5
<br />JAPANESE TREE LILAC
<br />SYRING4 AMURENSIS JAPAOMCA MULTISTEM
<br />6' B & B
<br />4
<br />28
<br />MISS KIM LILAC
<br />SYRINGA VEWTINA 'MISS KIM"
<br />I8 " -24" H, POT
<br />O35
<br />COLOFLAME SPIRA
<br />SPIREA BUMALDA "GOLDFLAME"
<br />I8"-24" H, POT
<br />4
<br />27
<br />RED TWIG DOGWOOD
<br />CORNUSSTOLONIFERA
<br />18'24' H, POT
<br />10
<br />RUGOSA ROSE "CAREFREE BEAUTY"
<br />RUGOSA ROSE 'GAREFREE BEAUTY"
<br />18 "-24' H, POT
<br />Itto
<br />5
<br />TECHNY COLUMNAR ARBORVITAE
<br />THUJA OCCIDENTALIS 7ECHNY"
<br />3'H, POT, SPACE S 0
<br />®
<br />23
<br />DWARF BUSH HONEY SUCKLE
<br />DIERVILLA IONICERA
<br />12 "-18" H, POT
<br />40
<br />7
<br />POTENTILL4
<br />POTENTILLA SPP.
<br />12'-18'H, POT
<br />®
<br />3
<br />S4BIA JUNIPER
<br />JUNIPERUS CHINENSIS 'SAGA'
<br />12'-18' H, POT
<br />16
<br />GROLO SUMAC
<br />RHOS AROMATICA "GROLO"
<br />12", POT
<br />°PLANTING LEGEND
<br />BIRCH STREET
<br />■*.p `Mal/
<br />PIA
<br />pinuiiuiiai■ii mmam ���ummu mCmummuiiiiiiii
<br />?fir ��muni �1 ea
<br />OFFICE/RETAIL/RESTAURANT
<br />12,480 SF
<br />0 LANDSCAPE PLAN
<br />PLANTING SPECIFICATIONS
<br />I. PLANTING BED PREPARATION: ALL MASS PLANTING BEDS SHALL BE TILTED TO A MINIMUM DEPTH OF
<br />10 ". AMENDMENTS SHALL BE APPLIED AFTER CULTIVATION.
<br />2 BACK FILL SOIL: USE SOIL EXCAVATED FROM PLANTING HOLES AND PROVIDE AMENDMENTS. REMOVE
<br />ALL DEBRIS INCLUDING ROCKS LARGER THAN 3" DIAMETER.
<br />3. FERTILIZATION: ALL PLANT MATERIALS SHALL BE FERTILIZED UPON INSTALLATION WITH DRIED BONE
<br />MEAL OR OTHER SPECIFIED FERTILIZER MIXED IN WITH THE PLANTING SOB PER THE MANUFACTURERS
<br />INSTRUCTIONS.
<br />4. MULCH MATERIAL: AS SPECIFIED ON THE LANDSCAPE PLANS. MASS MULCH ALL PLANDNG BEDS TO 3"
<br />DEPTH OVER FIBER MAT WEED BARRIER. ALL PERENNIAL PLANTING BEDS TO RECEIVER 3" DEEP
<br />SHREDDED HARDWOOD MULCH WITH NO FIBER MAT WEED BARRIER ALL EVERGREEN AND DECIDUOUS
<br />TREES TO RECEIVE 6' DEEP SHREDDED HARDWOOD MULCH WITH NO MULCH IN DIRECT CONTACT WITH
<br />THE TREE TRUNK.
<br />5. TREE STAKING IT SHALL BE THE CONTRACTORS RESPONSIBILITY TO STAKE AND/OR GUY THE TREES
<br />ACCORDING TO THE DETAILS. IT IS THE CONTRACTORS RESPONSIBILITY TO TAKE EVERY STEP
<br />NECESSARY TO MAINTAIN THE TREES AND SHRUBS IN AN UPRIGHT AND PLUMB CONDITION AT ALL
<br />TIMES UNTIL THE END OF THE PLANT GUARANTEE PERIOD ESPECIALLY WHERE VANDALISM, SOIL DR
<br />WIND CONDITIONS AREA PROBLEM.
<br />6. TREE WRAPPING WRAPPING MATERIAL SHALL BE QUALITY, HEAVY WATERPROOF CREPE PAPER
<br />MANUFACTURED FOR THIS PURPOSE. WRAP ALL DECIDUOUS TREES PLANTED IN THE FALL PRIOR TO 12 -I
<br />AND REMOVE ALL WRAPPING AFTER 5 -1.
<br />7. RODENT PROTECTION: PROVIDE ON ALL TREES, EXCEPT SPRUCE UNLESS OTHERWISE SPECIFIED.
<br />8. PLANTING PLAN: ALL PROPOSED PLANTS SHALL BE LOCATED CAREFULLY AS SHOWN ON THE PLANS
<br />PLAN TAKES PRECEDENCE OVER PLANT SCHEDULE IF DISCREPANCIES IN QUANTITIES EXIST.
<br />SPECIFICATIONS TAKE PRECEDENCE OVER NOTES. RESPECT STATED DIMENSIONS. DO NOT SCALE
<br />DRAWINGS.
<br />9. EDGING EDGING SHALL BE 4" P.V.C. COMMERCIAL GRADE EDGING WITH SIX (6) METAL ANCHOR STAKES
<br />PER 20 FOOT SECTION. ALL MASS PL ANTING BEDS SHALL HAVE EDGING PLACED BETWEEN MULCH AREA
<br />AND ANY ADJACENT TURF AREA.
<br />GENERAL NOTES
<br />1. LANDSCAPE CONTRACTOR TO VERIFY ALL UTILITY LOCATIONS ON PROPERTY WITH THE GENERAL
<br />CONTRACTOR AND BYCAWNG GOPHER STATE ONE CALL (454.0002) PRIOR TO STAKING PLANT
<br />LOCATIONS.
<br />2. COORDINATE THE PHASES OF CONSTRUCTION AND PLANTING INSTALLATIONS WITH OTHER
<br />CONTRACTORS WORKING ON SITE.
<br />3. WHERE EXISTING TREES AND/OR SIGNIFICANT SHRUBS MASSING ARE FOUND ON SITE, WHETHER SHOWN
<br />ON THE DRAWING OR NOT, THEY SHALL BE PROTECTED AND SAVED UNLESS NOTED TO BE REMOVED
<br />AND /OR ARE IN AN AREA TO BE GRADED, ANY QUESTION REGARDING WHETHER PLANT MATERIAL
<br />SHOULD REMAIN OR NOT SHALL BE BROUGHT TO THE ATTENTION OF THE LANDSCAPE ARCHITECT
<br />PRIOR TO REMOVAL
<br />4. ALL EXISTING TREES TO REMAIN TO BE FERTILIZED AND PRUNED TO REMOVE DEAN WOOD AND
<br />DAMAGED OR RUBBING BRANCHES.
<br />5. BB TREES AND SHRUBS ARE BALLED AND BURI APED.
<br />6. NO PLANT MATERIAL SUBSTITUTIONS WILL BE ACCEPTED UNLESS APPROVAL IS REQUESTED OF THE
<br />LANDSCAPE ARCHITECT RY THE LANDSCAPE CONTRACTOR PRIOR TO THE SUBMISSION OF A 810 AND /OR
<br />QUOTATION.
<br />7. ALL PLANT MATERIAL SHALL COMPLY WITH THE LATEST EDITION OF THE AMERICAN STANDARD FOR
<br />NURSERY STOCK, AMERICAN ASSOCIATION OF NURSERYMEN.
<br />8. CONTRACTOR IS RESPONSIBLE FOR ONGOING MAINTENANCE OF ALL NEWLY INSTALLED MATERIALS
<br />UNTIL TIME OF OWNER ACCEPTANCE ANY ACTS OF VANDALISM OR DAMAGE WHICH MAY OCCUR PRIOR
<br />TO OWNER ACCEPTANCE SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR.
<br />9. CONTRACTOR SHALL PROVIDE A WRITTEN REQUEST FOR THE OWNER ACCEPTANCE INSPECTION.
<br />10. WARRANTY FOR LANDSCAPE MATERIALS SHALL BEGIN ON THE DATE OF ACCEPTANCE BY THE
<br />LANDSCAPE ARCHITECTAFTER THE COMPLETION OF PLANTING OF ALL LANDSCAPE MATERIALS NO
<br />PARTIAL ACCEPTANCE WILL RE CONSIDERED.
<br />I I. CONTRACTOR SHALL GUARANTEE NEW RANT MATERIAL THROUGH ON CALENDAR YEAR FROM THE
<br />DATE OF OWNER ACCEPTANCE WITH ALL REPLACEMENTS TO BE PROVIDED AT NO ADDITIONAL COST TO
<br />THE OWNER.
<br />PLANTING NOTES
<br />1. NO PLANTING TO BE INSTALLED UNTIL GRADING AND CONSTRUCTION HAS BEEN COMPLETED IN THE
<br />IMMEDIATE AREA.
<br />2. ALL PLANT MATERIAL LOCATIONS MUST BE REVIEWED AND APPROVED BY THE LANDSCAPE ARCHITECT
<br />PRIOR TO ANY AND ALL DIGGING.
<br />3. IF THE LANDSCAPE CONTRACTOR PERCEIVES ANY DEFICIENOES IN THE PLANT SELECTIONS, SOIL
<br />CONDITIONS, OR ANY OTHER SITE CONDITION WHICH MIGHT NEGATIVELY AFFECT PLOT MATERIAL
<br />ESTABLISHMENT SURVIVAL, OR GUARANTEE, THEY SHALL BRING THESE DEFICIENCIES TO THE
<br />ATTENTION OF THE LANDSCAPE ARCHITECT PRIOR TO INSTALLATION.
<br />4. ADJUSTMENTS IN LOCATION OF PROPOSED PLANTMATDUALS MAY BE NEEDED IN FIELD. SHOULD AN
<br />ADJUSTMENT BE ADVISED, THE LANDSCAPEARGIITECT MUST BE NOTIFIED.
<br />5. ALL PLANTS TO RE INSTALLED AS PER PLANTING DETAILS
<br />6. ONE SHRUB PER TYPE AND SIZE IN EACH PLANTING BED AND EVERY TREE SHALL BE CLEARLY IDENTIFIED
<br />(COMMON OR LATIN NOMENCLATURE) WITH A PLASTIC TAG WHICH SHALL NOT BE REMOVED PRIOR TO
<br />OWNER ACCEPTANCE.
<br />7. WHERE 5OD/SEED ABUTS PAVED SURFACES, FINISHED GRADE OF SOD /SEED SHALL BE HELD I "BELOW
<br />SURFACE ELEVATION OF TRIAL, SLAB, CURB, ETC
<br />8. SOD SHALL BE LAID PARALLEL TO THE CONTOURS AND SHALL HAVE STAGGERED JOINTS ON SLOPES
<br />STEEPER THAN 3:1 OR IN DRAINAGESWALES, TNESOD SHALL BE STAKED TO THE GROUND.
<br />9. SEED ALL AREAS DISTURBED DUE TO GRADING OTHER THAN THOSE AREAS NOTED TO RECEIVE SOD.
<br />10. REPAIR ALL DAMAGE TO PROPERTY FROM PLANTING OPERATIONS AT NO COST TO THE OWNER.
<br />IRRIGATION NOTES
<br />1. LANDSCAPE CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDINGA SHOP DRAWING ILLUSTRATING AN
<br />IRRIGATION PLAN AND SPECIFICATION AS PART OF THE SCOPE OF WORK WHEN BIDDING. THESE SHALL
<br />BE APPROVED BY THE LANDSCAPEAROIITECT PRIOR TO ORDER.
<br />2. VERIFY DOSTINCJPROPOSED IRRIGATION SYSTEM LOCATION.
<br />3. UNLESS OTHERWISE NOTED ALL SOD /SEED AND PLANTING AREAS INDICATED ON PLAN SHALL BE 100 k'
<br />IRRIGATED. THE IRRIGATION SHALL INCLUDE THE PUBLIC RIGHT OF WAY BETWEEN PROPERTY UNEAND
<br />BACK OF CURB OR SOUND WALL WHERE NEW LANDSCAPE IMPROVEMENTS ARE PROPOSED.
<br />4. IT SHALL BE THE LANDSCAPE CONTRACTOR'S RESPONSIBILITY TO INSURE THAT ALL SODDED/SEEDED
<br />AND PLANTED AREAS ARE IRRIGATED PROPERLY, INCLUDING THOSE AREAS DIRECTLY AROUND AND
<br />ABUTTING BUILDING FOUNDATION.
<br />S. THE LANDSCAPE CONTRACTOR SHALL PROVIDE THE OWNER WITH A WATERING/LAWN IRRIGATION
<br />SCHEDULE APPROPRIATE TO THE PROJECT SITE CONDITIONS AND TO PLANT MATERIAL GROWTH
<br />REQUIREMENTS.
<br />FEB 2006
<br />0
<br />30
<br />60
<br />100
<br />1
<br />A. Peter Hiiger #151
<br />I hereby certify that this plan and specific/
<br />was prepared by ma or under my supervi
<br />and that I am a duly registered architect u
<br />the laws of to State of Minnesota as sigr
<br />by my hand and seal.
<br />Issue R
<br />CITY SUBMITTAL 12
<br />Supervising
<br />Roseville
<br />2340 Lexington Ave. North
<br />Roseville, MN 55113
<br />P. 651.631.1300 N 651.631:15
<br />Proiest Archtest
<br />APH
<br />PmiecIR prawn By OheeN
<br />RA05 -010 SEB AF
<br />Issl
<br />CITY SUBMI
<br />Sheet t
<br />•
<br />
|