Laserfiche WebLink
NOTES: <br />HAND LOOSEN ROOTS OF CONTAINERIZED MATERIAL. <br />SCARIFY BOTTOM &SIDES OF HOLE PRIOR TO PLANTING. <br />LANDSCAPE <br />FABRIC <br />TOP SOIL <br />SUBGRADE <br />SHRUBS TO SIT <br />ON SUBGRADE <br />MULCH; 4" DEEP <br />SHREDDED BARK <br />SOD <br />P.V.C. EDGING <br />PLANTING SOIL <br />CENTERING OF SHRUB <br />IN BED TO TAKE PRECEDENCE <br />OVER DIMENSION FROM EDGE <br />°DECIDUOUS SHRUB DETAIL <br />1/2 "- I'S' <br />STRAP; 16"X 1 I/2" WIDE <br />POLYPROPYLENE OR <br />POLYETHYLENE <br />�- FLAGGING; <br />014E PER WIRE <br />SOD <br />TOP SOIL <br />SUBGRADE <br />]I LI °ILi I III <br />ROOTBALL TO SIT <br />NOTES: ON SUBGRADE <br />SCARIFY BOTTOM & SIDES OF HOLE PRIOR TO PLANTING. <br />2" X 2"X 24" <br />WOOD STAKE SETA ANGLE <br />TWO ALTERNATE METHODS OF TREE STAKING ARE ILLUSTRATED. <br />IT IS THE CONTRACTOR'S OPTION TO STAKE TREES; HOWEVER, <br />THE CONTRACTOR IS RESPONSIBLE FOR MAINTAINING TREES IN A <br />PLUMB POSITION THROUGHOUT THE GUARANTEE PERIOD. <br />°DECIDUOUS TREE DETAIL <br />1/2 "- I,-0• <br />DOUBLE STRAND <br />14 GA WIRE <br />36" W 120 ° <br />INTERVALS <br />STRAP; 16'X 1 1/2" WIDE <br />POLYPROPYLENE OR <br />POLYETHYLENE <br />FLAGGING; <br />ONE PER WIRE <br />MULCH; 4' DEEP <br />SHREDDED BARK <br />SOD <br />TOP SOIL <br />SUBGRADE <br />2 "X 2 "X 24' <br />WOOD STAKE <br />SETA ANGLE <br />ROOTBALL TO SIT PLANTING <br />ON SUBGRADE SOIL <br />NOTES: <br />CONIFER TO HAVE HARDWOOD MULCH UNLESS OTHERWISE NOTED. <br />140 MULCH TO BE IN CONTACT WITH TRUNK. <br />SCARIFY BOTTOM & SIDES OF HOLE PRIOR TO PLANTING. <br />TWO ALTERNATE METHODS OF TREE STAKING ARE ILLUSTRATED. <br />IT IS THE CONTRACTOR'S OPTION TO STAKE TREES; HOWEVER, <br />THE CONTRACTOR IS RESPONSIBLE FOR MAINTAINING TREES IN A <br />PLUMB POSITION THROUGHOUT THE GUARANTEE PERIOD. <br />°CONIFEROUS TREE DETAIL <br />I/2 • 1'-0" <br />NOTES: <br />CONIFER TO HAVE HARDWOOD MULCH UNLESS OTHERWISE NOTED. <br />NO MULCH TO BE IN CONTACT WITH TRUNK <br />SCARIFY BOTTOM & SIDES OF HOLE PRIOR TO PLANTING. <br />LANDSCAPE <br />FABRIC <br />TOP SOIL <br />SUBGRADE <br />ROOTBALL TO <br />SET ON <br />SUBGRADE <br />CONIFEROUS SHRUB <br />MULCH; 4" DEEP <br />SHREDDED BARK <br />SOD <br />P.V.C. EDGING <br />PLANTING SOIL <br />CENTERING OF SHRUB <br />IN BED TO TAKE PRECEDENCE <br />OVER DIMENSION FROM EDGE <br />DETAIL <br />1/2 "- 1' -0" <br />QUANITY <br />COMMON NAME <br />BOTANICAL NAME <br />SIZE <br />TED <br />LITTLE BLUESIEM <br />SCHIAZCHYRIUM SCOPARIUM <br />6 "POT 18" O.C. STAGGER <br />PILAUS NIGRA <br />46'B&8 <br />PURPLE CONEFLOWER <br />ECHINACEA PURPUREA <br />6" POT 18" O.C. STAGGER <br />PICEA GLAUCA "DENSATA" <br />4,6' Et & B <br />STELLA DE ORO <br />HEMMEROCALUS "STELA A DE ORO" <br />6" POT 12" O.C. STAGGER <br />FRAXINUS PENNSYLVANICA 'MARSHALL" <br />2 "B & B <br />GOLDSTURM, BLACK-EYED SUSAN <br />RUDBECKIA "COLDSTURM." <br />6 "POT 12' O.C. STAGGER <br />OPERENNIAL BED PLANTING LEGEND <br />05 <br />°PLANTING LEGEND <br />BIRCH STREET <br />■*.p `Mal/ <br />PIA <br />pinuiiuiiai■ii mmam ���ummu mCmummuiiiiiiii <br />?fir ��muni �1 ea <br />OFFICE/RETAIL/RESTAURANT <br />12,480 SF <br />0 LANDSCAPE PLAN <br />PLANTING SPECIFICATIONS <br />I. PLANTING BED PREPARATION: ALL MASS PLANTING BEDS SHALL BE TILTED TO A MINIMUM DEPTH OF <br />10 ". AMENDMENTS SHALL BE APPLIED AFTER CULTIVATION. <br />2 BACK FILL SOIL: USE SOIL EXCAVATED FROM PLANTING HOLES AND PROVIDE AMENDMENTS. REMOVE <br />ALL DEBRIS INCLUDING ROCKS LARGER THAN 3" DIAMETER. <br />3. FERTILIZATION: ALL PLANT MATERIALS SHALL BE FERTILIZED UPON INSTALLATION WITH DRIED BONE <br />MEAL OR OTHER SPECIFIED FERTILIZER MIXED IN WITH THE PLANTING SOB PER THE MANUFACTURERS <br />INSTRUCTIONS. <br />4. MULCH MATERIAL: AS SPECIFIED ON THE LANDSCAPE PLANS. MASS MULCH ALL PLANDNG BEDS TO 3" <br />DEPTH OVER FIBER MAT WEED BARRIER. ALL PERENNIAL PLANTING BEDS TO RECEIVER 3" DEEP <br />SHREDDED HARDWOOD MULCH WITH NO FIBER MAT WEED BARRIER ALL EVERGREEN AND DECIDUOUS <br />TREES TO RECEIVE 6' DEEP SHREDDED HARDWOOD MULCH WITH NO MULCH IN DIRECT CONTACT WITH <br />THE TREE TRUNK. <br />5. TREE STAKING IT SHALL BE THE CONTRACTORS RESPONSIBILITY TO STAKE AND/OR GUY THE TREES <br />ACCORDING TO THE DETAILS. IT IS THE CONTRACTORS RESPONSIBILITY TO TAKE EVERY STEP <br />NECESSARY TO MAINTAIN THE TREES AND SHRUBS IN AN UPRIGHT AND PLUMB CONDITION AT ALL <br />TIMES UNTIL THE END OF THE PLANT GUARANTEE PERIOD ESPECIALLY WHERE VANDALISM, SOIL DR <br />WIND CONDITIONS AREA PROBLEM. <br />6. TREE WRAPPING WRAPPING MATERIAL SHALL BE QUALITY, HEAVY WATERPROOF CREPE PAPER <br />MANUFACTURED FOR THIS PURPOSE. WRAP ALL DECIDUOUS TREES PLANTED IN THE FALL PRIOR TO 12 -I <br />AND REMOVE ALL WRAPPING AFTER 5 -1. <br />7. RODENT PROTECTION: PROVIDE ON ALL TREES, EXCEPT SPRUCE UNLESS OTHERWISE SPECIFIED. <br />8. PLANTING PLAN: ALL PROPOSED PLANTS SHALL BE LOCATED CAREFULLY AS SHOWN ON THE PLANS <br />PLAN TAKES PRECEDENCE OVER PLANT SCHEDULE IF DISCREPANCIES IN QUANTITIES EXIST. <br />SPECIFICATIONS TAKE PRECEDENCE OVER NOTES. RESPECT STATED DIMENSIONS. DO NOT SCALE <br />DRAWINGS. <br />9. EDGING EDGING SHALL BE 4" P.V.C. COMMERCIAL GRADE EDGING WITH SIX (6) METAL ANCHOR STAKES <br />PER 20 FOOT SECTION. ALL MASS PL ANTING BEDS SHALL HAVE EDGING PLACED BETWEEN MULCH AREA <br />AND ANY ADJACENT TURF AREA. <br />GENERAL NOTES <br />1. LANDSCAPE CONTRACTOR TO VERIFY ALL UTILITY LOCATIONS ON PROPERTY WITH THE GENERAL <br />CONTRACTOR AND BYCAWNG GOPHER STATE ONE CALL (454.0002) PRIOR TO STAKING PLANT <br />LOCATIONS. <br />2. COORDINATE THE PHASES OF CONSTRUCTION AND PLANTING INSTALLATIONS WITH OTHER <br />CONTRACTORS WORKING ON SITE. <br />3. WHERE EXISTING TREES AND/OR SIGNIFICANT SHRUBS MASSING ARE FOUND ON SITE, WHETHER SHOWN <br />ON THE DRAWING OR NOT, THEY SHALL BE PROTECTED AND SAVED UNLESS NOTED TO BE REMOVED <br />AND /OR ARE IN AN AREA TO BE GRADED, ANY QUESTION REGARDING WHETHER PLANT MATERIAL <br />SHOULD REMAIN OR NOT SHALL BE BROUGHT TO THE ATTENTION OF THE LANDSCAPE ARCHITECT <br />PRIOR TO REMOVAL <br />4. ALL EXISTING TREES TO REMAIN TO BE FERTILIZED AND PRUNED TO REMOVE DEAN WOOD AND <br />DAMAGED OR RUBBING BRANCHES. <br />5. BB TREES AND SHRUBS ARE BALLED AND BURI APED. <br />6. NO PLANT MATERIAL SUBSTITUTIONS WILL BE ACCEPTED UNLESS APPROVAL IS REQUESTED OF THE <br />LANDSCAPE ARCHITECT RY THE LANDSCAPE CONTRACTOR PRIOR TO THE SUBMISSION OF A 810 AND /OR <br />QUOTATION. <br />7. ALL PLANT MATERIAL SHALL COMPLY WITH THE LATEST EDITION OF THE AMERICAN STANDARD FOR <br />NURSERY STOCK, AMERICAN ASSOCIATION OF NURSERYMEN. <br />8. CONTRACTOR IS RESPONSIBLE FOR ONGOING MAINTENANCE OF ALL NEWLY INSTALLED MATERIALS <br />UNTIL TIME OF OWNER ACCEPTANCE ANY ACTS OF VANDALISM OR DAMAGE WHICH MAY OCCUR PRIOR <br />TO OWNER ACCEPTANCE SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR. <br />9. CONTRACTOR SHALL PROVIDE A WRITTEN REQUEST FOR THE OWNER ACCEPTANCE INSPECTION. <br />10. WARRANTY FOR LANDSCAPE MATERIALS SHALL BEGIN ON THE DATE OF ACCEPTANCE BY THE <br />LANDSCAPE ARCHITECTAFTER THE COMPLETION OF PLANTING OF ALL LANDSCAPE MATERIALS NO <br />PARTIAL ACCEPTANCE WILL RE CONSIDERED. <br />I I. CONTRACTOR SHALL GUARANTEE NEW RANT MATERIAL THROUGH ON CALENDAR YEAR FROM THE <br />DATE OF OWNER ACCEPTANCE WITH ALL REPLACEMENTS TO BE PROVIDED AT NO ADDITIONAL COST TO <br />THE OWNER. <br />PLANTING NOTES <br />1. NO PLANTING TO BE INSTALLED UNTIL GRADING AND CONSTRUCTION HAS BEEN COMPLETED IN THE <br />IMMEDIATE AREA. <br />2. ALL PLANT MATERIAL LOCATIONS MUST BE REVIEWED AND APPROVED BY THE LANDSCAPE ARCHITECT <br />PRIOR TO ANY AND ALL DIGGING. <br />3. IF THE LANDSCAPE CONTRACTOR PERCEIVES ANY DEFICIENOES IN THE PLANT SELECTIONS, SOIL <br />CONDITIONS, OR ANY OTHER SITE CONDITION WHICH MIGHT NEGATIVELY AFFECT PLOT MATERIAL <br />ESTABLISHMENT SURVIVAL, OR GUARANTEE, THEY SHALL BRING THESE DEFICIENCIES TO THE <br />ATTENTION OF THE LANDSCAPE ARCHITECT PRIOR TO INSTALLATION. <br />4. ADJUSTMENTS IN LOCATION OF PROPOSED PLANTMATDUALS MAY BE NEEDED IN FIELD. SHOULD AN <br />ADJUSTMENT BE ADVISED, THE LANDSCAPEARGIITECT MUST BE NOTIFIED. <br />5. ALL PLANTS TO RE INSTALLED AS PER PLANTING DETAILS <br />6. ONE SHRUB PER TYPE AND SIZE IN EACH PLANTING BED AND EVERY TREE SHALL BE CLEARLY IDENTIFIED <br />(COMMON OR LATIN NOMENCLATURE) WITH A PLASTIC TAG WHICH SHALL NOT BE REMOVED PRIOR TO <br />OWNER ACCEPTANCE. <br />7. WHERE 5OD/SEED ABUTS PAVED SURFACES, FINISHED GRADE OF SOD /SEED SHALL BE HELD I "BELOW <br />SURFACE ELEVATION OF TRIAL, SLAB, CURB, ETC <br />8. SOD SHALL BE LAID PARALLEL TO THE CONTOURS AND SHALL HAVE STAGGERED JOINTS ON SLOPES <br />STEEPER THAN 3:1 OR IN DRAINAGESWALES, TNESOD SHALL BE STAKED TO THE GROUND. <br />9. SEED ALL AREAS DISTURBED DUE TO GRADING OTHER THAN THOSE AREAS NOTED TO RECEIVE SOD. <br />10. REPAIR ALL DAMAGE TO PROPERTY FROM PLANTING OPERATIONS AT NO COST TO THE OWNER. <br />IRRIGATION NOTES <br />1. LANDSCAPE CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDINGA SHOP DRAWING ILLUSTRATING AN <br />IRRIGATION PLAN AND SPECIFICATION AS PART OF THE SCOPE OF WORK WHEN BIDDING. THESE SHALL <br />BE APPROVED BY THE LANDSCAPEAROIITECT PRIOR TO ORDER. <br />2. VERIFY DOSTINCJPROPOSED IRRIGATION SYSTEM LOCATION. <br />3. UNLESS OTHERWISE NOTED ALL SOD /SEED AND PLANTING AREAS INDICATED ON PLAN SHALL BE 100 k' <br />IRRIGATED. THE IRRIGATION SHALL INCLUDE THE PUBLIC RIGHT OF WAY BETWEEN PROPERTY UNEAND <br />BACK OF CURB OR SOUND WALL WHERE NEW LANDSCAPE IMPROVEMENTS ARE PROPOSED. <br />4. IT SHALL BE THE LANDSCAPE CONTRACTOR'S RESPONSIBILITY TO INSURE THAT ALL SODDED/SEEDED <br />AND PLANTED AREAS ARE IRRIGATED PROPERLY, INCLUDING THOSE AREAS DIRECTLY AROUND AND <br />ABUTTING BUILDING FOUNDATION. <br />S. THE LANDSCAPE CONTRACTOR SHALL PROVIDE THE OWNER WITH A WATERING/LAWN IRRIGATION <br />SCHEDULE APPROPRIATE TO THE PROJECT SITE CONDITIONS AND TO PLANT MATERIAL GROWTH <br />REQUIREMENTS. <br />FEB 2006 <br />0 <br />30 <br />60 <br />100 <br />1 <br />A. Peter Hiiger #151 <br />I hereby certify that this plan and specific/ <br />was prepared by ma or under my supervi <br />and that I am a duly registered architect u <br />the laws of to State of Minnesota as sigr <br />by my hand and seal. <br />Issue R <br />CITY SUBMITTAL 12 <br />Supervising <br />Roseville <br />2340 Lexington Ave. North <br />Roseville, MN 55113 <br />P. 651.631.1300 N 651.631:15 <br />Proiest Archtest <br />APH <br />PmiecIR prawn By OheeN <br />RA05 -010 SEB AF <br />Issl <br />CITY SUBMI <br />Sheet t <br />• <br />QUAMT' <br />COMMON NAME <br />BOTANICAL NAME <br />SIZE <br />O6 <br />AUSTRIAN PINE <br />PILAUS NIGRA <br />46'B&8 <br />© <br />4 <br />BLACKMLLS SPRUCE <br />PICEA GLAUCA "DENSATA" <br />4,6' Et & B <br />® <br />15 <br />MARSHALLS ASH <br />FRAXINUS PENNSYLVANICA 'MARSHALL" <br />2 "B & B <br />O2 <br />REDMOND LINDEN <br />TILIA XEUCHLORA 'REDMOND" <br />2 "8 & B <br />© <br />4 <br />NORTHWOOD MAPLE <br />AfER RUBRUM "NORTHWOOD' <br />2"8 & 8 <br />O7 <br />RADIANT CRABAPPLE <br />HALOS "RADIANT <br />I "B & B <br />4 <br />5 <br />JAPANESE TREE LILAC <br />SYRING4 AMURENSIS JAPAOMCA MULTISTEM <br />6' B & B <br />4 <br />28 <br />MISS KIM LILAC <br />SYRINGA VEWTINA 'MISS KIM" <br />I8 " -24" H, POT <br />O35 <br />COLOFLAME SPIRA <br />SPIREA BUMALDA "GOLDFLAME" <br />I8"-24" H, POT <br />4 <br />27 <br />RED TWIG DOGWOOD <br />CORNUSSTOLONIFERA <br />18'24' H, POT <br />10 <br />RUGOSA ROSE "CAREFREE BEAUTY" <br />RUGOSA ROSE 'GAREFREE BEAUTY" <br />18 "-24' H, POT <br />Itto <br />5 <br />TECHNY COLUMNAR ARBORVITAE <br />THUJA OCCIDENTALIS 7ECHNY" <br />3'H, POT, SPACE S 0 <br />® <br />23 <br />DWARF BUSH HONEY SUCKLE <br />DIERVILLA IONICERA <br />12 "-18" H, POT <br />40 <br />7 <br />POTENTILL4 <br />POTENTILLA SPP. <br />12'-18'H, POT <br />® <br />3 <br />S4BIA JUNIPER <br />JUNIPERUS CHINENSIS 'SAGA' <br />12'-18' H, POT <br />16 <br />GROLO SUMAC <br />RHOS AROMATICA "GROLO" <br />12", POT <br />°PLANTING LEGEND <br />BIRCH STREET <br />■*.p `Mal/ <br />PIA <br />pinuiiuiiai■ii mmam ���ummu mCmummuiiiiiiii <br />?fir ��muni �1 ea <br />OFFICE/RETAIL/RESTAURANT <br />12,480 SF <br />0 LANDSCAPE PLAN <br />PLANTING SPECIFICATIONS <br />I. PLANTING BED PREPARATION: ALL MASS PLANTING BEDS SHALL BE TILTED TO A MINIMUM DEPTH OF <br />10 ". AMENDMENTS SHALL BE APPLIED AFTER CULTIVATION. <br />2 BACK FILL SOIL: USE SOIL EXCAVATED FROM PLANTING HOLES AND PROVIDE AMENDMENTS. REMOVE <br />ALL DEBRIS INCLUDING ROCKS LARGER THAN 3" DIAMETER. <br />3. FERTILIZATION: ALL PLANT MATERIALS SHALL BE FERTILIZED UPON INSTALLATION WITH DRIED BONE <br />MEAL OR OTHER SPECIFIED FERTILIZER MIXED IN WITH THE PLANTING SOB PER THE MANUFACTURERS <br />INSTRUCTIONS. <br />4. MULCH MATERIAL: AS SPECIFIED ON THE LANDSCAPE PLANS. MASS MULCH ALL PLANDNG BEDS TO 3" <br />DEPTH OVER FIBER MAT WEED BARRIER. ALL PERENNIAL PLANTING BEDS TO RECEIVER 3" DEEP <br />SHREDDED HARDWOOD MULCH WITH NO FIBER MAT WEED BARRIER ALL EVERGREEN AND DECIDUOUS <br />TREES TO RECEIVE 6' DEEP SHREDDED HARDWOOD MULCH WITH NO MULCH IN DIRECT CONTACT WITH <br />THE TREE TRUNK. <br />5. TREE STAKING IT SHALL BE THE CONTRACTORS RESPONSIBILITY TO STAKE AND/OR GUY THE TREES <br />ACCORDING TO THE DETAILS. IT IS THE CONTRACTORS RESPONSIBILITY TO TAKE EVERY STEP <br />NECESSARY TO MAINTAIN THE TREES AND SHRUBS IN AN UPRIGHT AND PLUMB CONDITION AT ALL <br />TIMES UNTIL THE END OF THE PLANT GUARANTEE PERIOD ESPECIALLY WHERE VANDALISM, SOIL DR <br />WIND CONDITIONS AREA PROBLEM. <br />6. TREE WRAPPING WRAPPING MATERIAL SHALL BE QUALITY, HEAVY WATERPROOF CREPE PAPER <br />MANUFACTURED FOR THIS PURPOSE. WRAP ALL DECIDUOUS TREES PLANTED IN THE FALL PRIOR TO 12 -I <br />AND REMOVE ALL WRAPPING AFTER 5 -1. <br />7. RODENT PROTECTION: PROVIDE ON ALL TREES, EXCEPT SPRUCE UNLESS OTHERWISE SPECIFIED. <br />8. PLANTING PLAN: ALL PROPOSED PLANTS SHALL BE LOCATED CAREFULLY AS SHOWN ON THE PLANS <br />PLAN TAKES PRECEDENCE OVER PLANT SCHEDULE IF DISCREPANCIES IN QUANTITIES EXIST. <br />SPECIFICATIONS TAKE PRECEDENCE OVER NOTES. RESPECT STATED DIMENSIONS. DO NOT SCALE <br />DRAWINGS. <br />9. EDGING EDGING SHALL BE 4" P.V.C. COMMERCIAL GRADE EDGING WITH SIX (6) METAL ANCHOR STAKES <br />PER 20 FOOT SECTION. ALL MASS PL ANTING BEDS SHALL HAVE EDGING PLACED BETWEEN MULCH AREA <br />AND ANY ADJACENT TURF AREA. <br />GENERAL NOTES <br />1. LANDSCAPE CONTRACTOR TO VERIFY ALL UTILITY LOCATIONS ON PROPERTY WITH THE GENERAL <br />CONTRACTOR AND BYCAWNG GOPHER STATE ONE CALL (454.0002) PRIOR TO STAKING PLANT <br />LOCATIONS. <br />2. COORDINATE THE PHASES OF CONSTRUCTION AND PLANTING INSTALLATIONS WITH OTHER <br />CONTRACTORS WORKING ON SITE. <br />3. WHERE EXISTING TREES AND/OR SIGNIFICANT SHRUBS MASSING ARE FOUND ON SITE, WHETHER SHOWN <br />ON THE DRAWING OR NOT, THEY SHALL BE PROTECTED AND SAVED UNLESS NOTED TO BE REMOVED <br />AND /OR ARE IN AN AREA TO BE GRADED, ANY QUESTION REGARDING WHETHER PLANT MATERIAL <br />SHOULD REMAIN OR NOT SHALL BE BROUGHT TO THE ATTENTION OF THE LANDSCAPE ARCHITECT <br />PRIOR TO REMOVAL <br />4. ALL EXISTING TREES TO REMAIN TO BE FERTILIZED AND PRUNED TO REMOVE DEAN WOOD AND <br />DAMAGED OR RUBBING BRANCHES. <br />5. BB TREES AND SHRUBS ARE BALLED AND BURI APED. <br />6. NO PLANT MATERIAL SUBSTITUTIONS WILL BE ACCEPTED UNLESS APPROVAL IS REQUESTED OF THE <br />LANDSCAPE ARCHITECT RY THE LANDSCAPE CONTRACTOR PRIOR TO THE SUBMISSION OF A 810 AND /OR <br />QUOTATION. <br />7. ALL PLANT MATERIAL SHALL COMPLY WITH THE LATEST EDITION OF THE AMERICAN STANDARD FOR <br />NURSERY STOCK, AMERICAN ASSOCIATION OF NURSERYMEN. <br />8. CONTRACTOR IS RESPONSIBLE FOR ONGOING MAINTENANCE OF ALL NEWLY INSTALLED MATERIALS <br />UNTIL TIME OF OWNER ACCEPTANCE ANY ACTS OF VANDALISM OR DAMAGE WHICH MAY OCCUR PRIOR <br />TO OWNER ACCEPTANCE SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR. <br />9. CONTRACTOR SHALL PROVIDE A WRITTEN REQUEST FOR THE OWNER ACCEPTANCE INSPECTION. <br />10. WARRANTY FOR LANDSCAPE MATERIALS SHALL BEGIN ON THE DATE OF ACCEPTANCE BY THE <br />LANDSCAPE ARCHITECTAFTER THE COMPLETION OF PLANTING OF ALL LANDSCAPE MATERIALS NO <br />PARTIAL ACCEPTANCE WILL RE CONSIDERED. <br />I I. CONTRACTOR SHALL GUARANTEE NEW RANT MATERIAL THROUGH ON CALENDAR YEAR FROM THE <br />DATE OF OWNER ACCEPTANCE WITH ALL REPLACEMENTS TO BE PROVIDED AT NO ADDITIONAL COST TO <br />THE OWNER. <br />PLANTING NOTES <br />1. NO PLANTING TO BE INSTALLED UNTIL GRADING AND CONSTRUCTION HAS BEEN COMPLETED IN THE <br />IMMEDIATE AREA. <br />2. ALL PLANT MATERIAL LOCATIONS MUST BE REVIEWED AND APPROVED BY THE LANDSCAPE ARCHITECT <br />PRIOR TO ANY AND ALL DIGGING. <br />3. IF THE LANDSCAPE CONTRACTOR PERCEIVES ANY DEFICIENOES IN THE PLANT SELECTIONS, SOIL <br />CONDITIONS, OR ANY OTHER SITE CONDITION WHICH MIGHT NEGATIVELY AFFECT PLOT MATERIAL <br />ESTABLISHMENT SURVIVAL, OR GUARANTEE, THEY SHALL BRING THESE DEFICIENCIES TO THE <br />ATTENTION OF THE LANDSCAPE ARCHITECT PRIOR TO INSTALLATION. <br />4. ADJUSTMENTS IN LOCATION OF PROPOSED PLANTMATDUALS MAY BE NEEDED IN FIELD. SHOULD AN <br />ADJUSTMENT BE ADVISED, THE LANDSCAPEARGIITECT MUST BE NOTIFIED. <br />5. ALL PLANTS TO RE INSTALLED AS PER PLANTING DETAILS <br />6. ONE SHRUB PER TYPE AND SIZE IN EACH PLANTING BED AND EVERY TREE SHALL BE CLEARLY IDENTIFIED <br />(COMMON OR LATIN NOMENCLATURE) WITH A PLASTIC TAG WHICH SHALL NOT BE REMOVED PRIOR TO <br />OWNER ACCEPTANCE. <br />7. WHERE 5OD/SEED ABUTS PAVED SURFACES, FINISHED GRADE OF SOD /SEED SHALL BE HELD I "BELOW <br />SURFACE ELEVATION OF TRIAL, SLAB, CURB, ETC <br />8. SOD SHALL BE LAID PARALLEL TO THE CONTOURS AND SHALL HAVE STAGGERED JOINTS ON SLOPES <br />STEEPER THAN 3:1 OR IN DRAINAGESWALES, TNESOD SHALL BE STAKED TO THE GROUND. <br />9. SEED ALL AREAS DISTURBED DUE TO GRADING OTHER THAN THOSE AREAS NOTED TO RECEIVE SOD. <br />10. REPAIR ALL DAMAGE TO PROPERTY FROM PLANTING OPERATIONS AT NO COST TO THE OWNER. <br />IRRIGATION NOTES <br />1. LANDSCAPE CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDINGA SHOP DRAWING ILLUSTRATING AN <br />IRRIGATION PLAN AND SPECIFICATION AS PART OF THE SCOPE OF WORK WHEN BIDDING. THESE SHALL <br />BE APPROVED BY THE LANDSCAPEAROIITECT PRIOR TO ORDER. <br />2. VERIFY DOSTINCJPROPOSED IRRIGATION SYSTEM LOCATION. <br />3. UNLESS OTHERWISE NOTED ALL SOD /SEED AND PLANTING AREAS INDICATED ON PLAN SHALL BE 100 k' <br />IRRIGATED. THE IRRIGATION SHALL INCLUDE THE PUBLIC RIGHT OF WAY BETWEEN PROPERTY UNEAND <br />BACK OF CURB OR SOUND WALL WHERE NEW LANDSCAPE IMPROVEMENTS ARE PROPOSED. <br />4. IT SHALL BE THE LANDSCAPE CONTRACTOR'S RESPONSIBILITY TO INSURE THAT ALL SODDED/SEEDED <br />AND PLANTED AREAS ARE IRRIGATED PROPERLY, INCLUDING THOSE AREAS DIRECTLY AROUND AND <br />ABUTTING BUILDING FOUNDATION. <br />S. THE LANDSCAPE CONTRACTOR SHALL PROVIDE THE OWNER WITH A WATERING/LAWN IRRIGATION <br />SCHEDULE APPROPRIATE TO THE PROJECT SITE CONDITIONS AND TO PLANT MATERIAL GROWTH <br />REQUIREMENTS. <br />FEB 2006 <br />0 <br />30 <br />60 <br />100 <br />1 <br />A. Peter Hiiger #151 <br />I hereby certify that this plan and specific/ <br />was prepared by ma or under my supervi <br />and that I am a duly registered architect u <br />the laws of to State of Minnesota as sigr <br />by my hand and seal. <br />Issue R <br />CITY SUBMITTAL 12 <br />Supervising <br />Roseville <br />2340 Lexington Ave. North <br />Roseville, MN 55113 <br />P. 651.631.1300 N 651.631:15 <br />Proiest Archtest <br />APH <br />PmiecIR prawn By OheeN <br />RA05 -010 SEB AF <br />Issl <br />CITY SUBMI <br />Sheet t <br />• <br />