My WebLink
|
Help
|
About
|
Sign Out
Home
Search
05/10/2006 P&Z Packet
LinoLakes
>
Advisory Boards & Commissions
>
Planning & Zoning Board
>
Packets
>
2006
>
05/10/2006 P&Z Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/24/2014 12:01:35 PM
Creation date
6/23/2014 12:15:51 PM
Metadata
Fields
Template:
P&Z
P&Z Document Type
P&Z Packet
Meeting Date
05/10/2006
P&Z Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
79
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br />f <br />$�1 p{M'Ly.4 <br />LISTING <br />'POND 4 <br />I NWL 890.00 <br />I HWL 1192.30 <br />1�. <br />EXISTING <br />WETLAND <br />10' <br />EXISTING <br />WETLAND <br />10 COInuaNa ADS, INNI n= Opp AA, W C NbwECIVIN6wURSII MN tS <br />N <br />1 <br />Itsnocu EXCEPT 009 NATIVE SPECIFIED (SEEDI AREAS. SHIN <br />RECEIVE 4' OF LOAM TOP SOIL THOROUGHLY <br />INCORPORATED INTO THE SUBSOIL AND SEEDED OR <br />SODDED. AREAS WITHIN THE STREET RIGHT -OF -WAY <br />SHALL RECEIVE LOAM AND S00 WITHIN 72 HOURS OF <br />FINAL GRADING. SEE SOD INSTALLATION NOTES BELOW. <br />2. SYMBOL OF TREES AND SHRUBS SHOWN ON THE <br />DRAWINGS ARE REPRESENT FULL MATURITY SIZE OF THE <br />PLANT. COORDINATE LOCATION WITH UNDERGROUND AND <br />OVERHEAD UTIJTIES. UGHTING FIXTURES. DOORS AND <br />WINDOWS. CONTRACTOR SHALL STAKE IN THE FIELD FINAL <br />LOCATION OF TREES AND SHRUBS FOR RENEW AND <br />APPROVAL BY THE LANDSCAPE ARCHITECT PRIOR TO <br />INSTALLATION. <br />3. TREES AND SHRUBS SHALL BE BALLED IN <br />BIODEGRADABLE BURLAP. <br />4. PLANTING BEDS SHALL RECEIVE 4° LAYER OF 1 -1/2° <br />DIAMETER GRAY ANGULAR TRAP STONE ON TOP OF A <br />NON- BIODEGRADABLE FILLER FABRIC AND BORDERED VAIN <br />3/16° THICK STEEL OR ALUMINUM EDGING. <br />5. FOR ADDITIONAL INFORMATION ON EXACT PLACEMENT <br />OF PLANTS AROUND ALL BUILDINGS AND VATHIN THE PARK <br />SPACE, SEE ENLARGEMENT PLANS. SCHEDULE BELOW <br />INCORPORATES ALL PLANT MATERIAL FROM ALL PLANS. <br />4- SODDING INSTALLATION:--4- <br />1. 4' TOPSOIL SHALL BE THOROUGHLY INCORPORATED <br />INTO THE SUBSOIL AND FREE OF CLODS, ROCKS, AND <br />DEBRIS AS APPROVED BY THE LANDSCAPE ARCHITECT <br />PRIOR TO INSTALLATION. <br />2. AREAS TO RECEIVE 50D SHALL BE FERTILIZED PATH 25 <br />POUNDS PER 1000 SG.FT, (1000 LB /AC) OF 10 -0 -10 <br />FERTIJZER AND WORKED INTO 7HE TOPSOIL. <br />3. TOPSOIL SHALL BE DAMPENED PRIOR TO LAYING THE <br />500. JOINTS IN THE 50D SHALL BE STAGGERED. AND <br />THE EDGES BUT1ED TOGETHER TIGHTLY TO AVOID GAPS <br />BETWEEN SOD LENGTHS <br />4. S00 INSTALLED ON SLOPES 3:1 OR GREATER. OR N <br />AREAS OF CONCENTRATED FLOWS. SHALL BE STAKED IN <br />PLACE. INSTALL THE SOD 441111 THE LENGTH <br />PERPENDICULAR TO THE WATER FLOW FOR SLOPES WITH <br />SHEET FLOW. <br />5. AFTER INSTALLATION, AREAS SHALL BE TAMPED OR <br />ROLLED TO PROVIDE GOOD CONTACT BETWEEN SOD AND <br />SOIL AFTER ROLLING. THE SOD SHOULD BE WATERED SO <br />THAT THE SOIL IS MOISTENED 4 INCHES BELOW THE 500. <br />44-- SODDING MAINTENANCE: ---0)- <br />1. IN THE ABSENCE OF ADEQUATE RAINFALL WATER 500 <br />DURING THE 30 DAY PERIOD FOLLOWING PLACEMENT TO <br />KEEP 5OL MOIST. FOLLOWING THIS INITIAL 30 DAY <br />ESTABUSHMENT PERIM, WATER AS NECESSARY TO <br />MAINTAIN ADEQUATE MOISTURE N THE ROOT ZONE <br />2. WHERE MOWING IS DESIRED, MAINTAIN GRASS HEIGHT OF <br />3 INCHES AND SHOULD NOT BE ATTEMPTED UNTIL THE <br />50D IS FIRMLY ROOTED, USUALLY TWO TO THREE WEEKS <br />AFTER SOD 15 INSTALLED. <br />3. INSPECT AREAS OF CONCENTRATED FLOW ANNUALLY <br />AND 00110491G INTENSE STORMS MAKE NEEDED REPAIR <br />AND REVEGETATE PROMPTLY. <br />4- SEEDING RECOMMENDATIONS: ---$- <br />1. INFILTRATION BASIN SHALL RECEIVE A NATIVE SEED MIX <br />SPECIFIED BY THE CITY PRIOR 10 INSTALLATION. <br />2. STABIUZED SEED MIXTURE SHALL BE NATIVE SEED MIX <br />AS SPECIFIED BY THE CITY PRIOR TO INSTALLATION <br />3. CONTRACTOR SHALL INSPECT BASIN SEEDING WEEKLY <br />AND AFTER EACH STORM EVENT AND REPAIR AS <br />NECESSARY ALL EROSION CONTROL MEASURES, SEEDING <br />AND SURFACE CONDITIONS TO INSURE THE INTEGRITY OF <br />THE EROSION CONTROL SYSTEM AND STABILIZATION OF <br />THE BASIN. <br />4. THE CONSECUTIVE YEAR MAINTENANCE <br />RECOMMENDATIONS FOR NATIVE PLANTINGS ARE NOTED IN <br />THE MAINTENANCE AGREEMENT. PREPARE STE AND SEED <br />BASIN BETWEEN MAY 1 -JULY 1. MOW BASIN SLOPES AT A <br />HEIGHT OF 6' -0' EVERY 30 DAYS AFTER PUNTING UNTIL <br />SEPTEMBER 30 OR PER SUPPUERS RECOMMENDATIONS. <br />FOR CONSECUTIVE YEAR MAINTENANCE RECOMMENDATIONS, <br />SEE MAINTENANCE AGREEMENT. <br />► <br />WilitgroW <br />4-PLANTING SCHEDULE - <br />QTY. COMMON NAME BOTANICAL NAME <br />DECIDUOUS TREES <br />20 HONEY LOCUST <br />13 RED MAPLE <br />13 REDMOND UNDFN <br />31 RED OAK <br />12 SWAMP WHITE OAK <br />1. ENTIRE STE SHALL BE FULLY IRRIGATED EXCEPT THE <br />SLOPE BETWEEN THE MOST EAST GARAGE DRIVE ACCESS <br />AND THE EXISTING WETLAND, AND ALL AREAS RECEIVING <br />CITY SPECIFIED SEED MIK <br />2. THE CONTRACTOR SHALL SUBMIT IRRIGATION SHOP <br />DRAWINGS FOR RENEW AND APPROVAL BY THE <br />LANDSCAPE ARCHITECT PRIOR TO INSTALLATION. <br />3. ALL TURF AREAS. PLANTING BEDS, AND ISLANDS SHALL <br />BE IRRIGATED. IRRIGATION 5Ta1tM WILL BE DESIGN - BUILD. <br />4--- CONSERVATION NOTES: <br />1.7HE CONTRACTOR SHALL BE RESPONSIBLE TO IDENTIFY <br />AND PROTECT ON -SITE VEGETATION IDENTIFIED ON THE <br />DRAWINGS TO BE RETAINED THROUGHOUT THE DURATION OF <br />THE CONTRACT. <br />2. IF NECESSARY THE CONTRACTOR SHALL INSTALL <br />TEMPORARY CONSTRUCTION FENCE AT THE DIRECTION OF <br />THE ENGINEER/LANDSCAPE ARCHITECT. UNITS OF <br />CONSTRUCTION DELINEATE GENERAL POSITION OF <br />TEMPORARY FENCING. CONTRACTOR SHALL LOCATE FENCE <br />ON DR NEAR THE SURVEYED PROPERTY LINE SO AS TO <br />NOT INTERFERE MTh CONSTRUCTION OF IMPROVEMENTS <br />3. FINAL LOCATION AND INSTALLATION OF STABIUZED <br />CONSTRUCT1ON ACCESS SHALL BE COORDINATED WITH THE <br />CITY PRIOR 70 CONSTRUCTION ACTIVITIES <br />4. VERIFY, ESTABLISH, FLAG, AND MAINTAIN 10' MINIMUM <br />WETLAND BUFFER ALONG EXISTING WETLAND THROUGHOUT <br />THE DURATION OF THE CONTRACT. CONTRACTOR SHALL <br />NOT DISTURB EXISTING MATERIALS SPECIFICALLY, BUT NOT <br />UNITED TO, SOIL COMPACTION, DEPOSIT OF DEBRIS, AND <br />MATERIAL STOCKPILING, CEMENT CONCRETE TRUCK <br />CLEANING WITHIN THE WETLAND BUFFER DELINEATION. <br />HARTFORD <br />tGROl1P A3) INC.f <br />1 easi., edify Vet N. Way. r^rrclm <br />oF0I 17 ne r sde ee <br />/ra N4nimn .W M l en A4' <br />Iced Aarba .Ls w <br />low of We 4. 42 M *molt <br />PobK 1 Sow <br />Lion. Na 1415 <br />RECEIVED <br />MAY 0 4 2006 <br />CITY OF LINO LAKES <br />4t - IRRIGATION NOTES: -1)- <br />1. CONTRACTOR TO VERIFY LOCATION OF ALL UNDERGROUND /ABOVE GROUND <br />FACILITIES PRIOR TO ANY EXCAVATION/INSTALLATION. ANY DAMAGE TO <br />UNDERGROUND /ABOVE GROUND FACILITIES SHALL BE THE RESPONSIBIUTY OF THE <br />CONTRACTOR AND COSTS ASSOCIATED WITH CORRECTING DAMAGES SHALL BE <br />BORNE ENTIRELY BY THE CONTRACTOR. <br />2. SERVICE EQUIPMENT AND INSTALLATION SHALL BE PER LOCAL UTLITY <br />COMPANY STANDARDS AND SHALL BE PER NATIONAL AND LOCAL CODES. EXACT <br />LOCATION OF SERVICE EQUIPMENT SHALL BE COORDINATED WITH THE LANDSCAPE <br />ARCHITECT OR EQUIVALENT AT THE JOB SITE. <br />3. CONTRACTOR SHALL COORDINATE WITH LOCAL UTIUTY COMPANY FOR THE <br />PROPOSED ELECTRICAL SERVICE AND METERING FAOIUTIES. <br />4. IRRIGATION WATER LINE CONNECTION SIZE 15 1 -i1" AT BUILDING. VERIFY WITH <br />MECHANICAL PLANSCOVAGE. <br />5. ALL MAIN LINES SHALL BE 18" BELOW FINISHED GRADE. <br />6. ALL LATERAL INNES SHALL BE 12" BELLOW FINISHED GRADE. <br />7. ALL EXPOSED PVC RISERS, IF ANY, SHALL BE GRAY IN COLOR. <br />8. CONTRACTOR SHALL LAY ALL SLEEVES AND CONDUIT AT 2' -0" BELOW THE <br />FINISHED GRADE OF THE TOP OF PAVEMENT. EXTEND SLEEVES TO 2' -0" BEYOND <br />PAVEMENT. <br />9. CONTRACTOR SHALL MARK THE LOCATION OF ALL SLEEVES AND CONDUIT <br />WITH THE SLEEVING MATERIAL "ELLED" TO 2' -0" ABOVE FINISHED GRADE AND <br />CAPPED. <br />10. FABRICATE ALL PIPE TO MANUFACTURE'S SPECIFICATIONS WITH CLEAN AND <br />SOUARE CUT JOINTS. USE QUALITY GRADE PRIMER AND SOLVENT CEMENT <br />FORMULATED FOR INTENDED TYPE OF CONNECTION. <br />11. BACKFILL ALL TRENCHES 'aim SOIL FREE OF SHARP OBJECTS AND DEBRIS. <br />12. ALL VALVE BOXES AND COVERS SHALL BE BLACK IN COLOR. <br />13. GROUP VALVE BOXES TOGETHER FOR EASE WHEN SERVICE IS REQUIRED. <br />LOCATE IN PLANT BED AREAS WHENEVER POSSIBLE. <br />14. IRRIGATION CONTROLLER LOCATION SHALL BE VERIFIED ON -SITE WITH OWNER'S <br />REPRESENTIVE. <br />15. CONTROL WIRES: 14 GAUGE DIRECT BURIAL SOLID COPPER IRRIGATION WIRE <br />RUN UNDER MAIN LINE. USE MOISTURE -PROOF SPUCES AND SPLICE ONLY AT <br />VALVES OR PULL BOXES. RUN SEPARATE HOT AND COMMON WIRE TO EACH VALVE <br />AND ONE (1) SPARE WIRE AND GROUND TO FURTHEST VALVE FROM CONTROLLER. <br />LABEL OR COLOR CODE ALL WIRES. <br />16. AVOID OVERSPRAY ON BUILDINGS, PAVEMENT, WALLS AND ROADWAYS BY <br />INDIVIDUALLY ADJUSTING RADIUS OR ARC ON SPRINKLER HEADS AND FLOW <br />CONTROL ON AUTOMATIC VALVE. <br />17. ADJUST PRESSURE REGULATING VALVES FOR OPTIMUM PRESSURE ON SITE <br />18. USE SCREENS ON ALL HEADS. <br />19. CONTRACTOR SHALL SUPPLY AN "AS- BUILT" PLAN OF IRRIGATION SYSTEM AT <br />THE TIME OF COMPLETION TO OWNER'S REPRESENTIVE. A SET OF AS -BUILT <br />DRAWINGS SHALL BE MAINTAINED ON -SITE AT ALL TIMES IN AN UPDATED <br />CONDITION. <br />20. ALL PIPE 3" AND OVER SHALL HAVE THRUST BLOCKING AT EACH TURN. <br />21. ALL AUTOMATIC REMOTE CONTROL VALVES WILL HAVE 3" MINIMUM DEPTH OF <br />3/4" WASHED GRAVEL UNDERNEATH VALVE AND VALVE BOX. GRAVEL SHALL <br />EXTENT 3" BEYOND PERIMETER OF VALVE BOX. THERE SHALL BE 3° MINIMUM <br />22. SPACE BETWEEN BOTTOM OF VALVE BOX COVER AND TOP OF VALVE <br />STRUCTURE <br />SEE MECHANICAL AND ELECTRICAL PLANS AND SPECIFICATIONS FOR <br />IRRIGATION WATER, METER, AND POWER CONNECTIONS. <br />EXISTING <br />WETLAND <br />20 0 40 <br />ROOT <br />MNUMUM SIZE COMMENTS <br />Gleditsio Trioconthos Var. Nanny <br />Ace, rubrum <br />TAN americana 'Redmond' <br />GTUerous rubrum <br />Ouercus bicolor <br />B&B <br />098 <br />B&B <br />B&B <br />B&B <br />2 1/2' CAL <br />2 1/2' CAL <br />2 1/2 CAL <br />2 1/2" CAL <br />2 1/2' CAL <br />STRAIGHT LEADER FULL. FORM <br />STRAIGHT LEADER -FULL FORM <br />STRAIGHT LEADER -FULL FORM <br />STRAIGHT LEADER -FULL FORM <br />STRAIGHT LEADER FULL FORM <br />CONIFEROUS TREES <br />7 8LAO( HILLS SPRUCE <br />21 AMERICAN LARCH <br />12 WHITE PINE <br />Picea Meucci deneoto <br />Lady laaclnu <br />PAos embus <br />B&B 6' HT <br />B&B 6' HT. <br />B&B 6' HT. <br />SINGLE LEADER -DENSE FORM <br />SINGLE LEADER -DENSE FORM <br />SINGLE LEADER-DENSE FORM <br />ORNAMENTAL TREES <br />5 SUGAR TYA1E CRABAPPLE <br />45 JAPANESE TREE ULAC <br />Moles 'SUtwom' <br />31 171ORNLESS HAWTHORN <br />®- 28 PAPER BIRCH <br />DEODUOUS SHRUBS <br />O <br />O <br />0 <br />0- 137 BAGATELLE B <br />Syringe <br />B&B 1 1/2' CAL SPECIMEN FORM <br />ga 8&B 1 1/2" CAL WEEMEN FORM <br />Crataeaus true-earn variety 'Warmly' 8&B 1 1/2' CAL. 51RMGHT LEADER -FULL 0088 <br />B&B 1 1/2' CAL STRAIGHT LEADER -FULL 009*4 <br />Betula paperllera <br />56 COMPACT PJM RHODODENDRON Rhododendron 'P.J.M. Compact' <br />56 IVORY HALO DOGWOOD <br />427 LITTLE PRINCESS SPIRAEA <br />154 COMPACT BURNING BUSH <br />9174 HONEYROSE HONEYSUCKLE Lonicero s 'Honey'ose' <br />BARBERRY Berber's thunbergli 'Bagatelle' <br />Comae albo '80Oholo' <br />Waist Iapanieo 'Little Princess' <br />Euogwnus aletus 'Comaaatue <br />CONIFERIOUS SHRUBS <br />8 1ECHNY ARBORINTAE <br />140 MUGH0 SLOWMOUND <br />CONT. 18' -24' HT. DENSE BRANCH <br />CONT. 18' -24' HT. DENSE BRANCH <br />CONT. 18 " -24' HT. DENSE BRANCH <br />CONT. 18 " -24" HT. DENSE BRANCH <br />CONT. 15 " -18" HT. DENSE BRANCH <br />CONT. I5' -111" HT. DENSE BRANCH <br />Thulo occidental's 'Techn4' <br />502 GOLDEN ARBORINTAE <br />Pine muoa 'Soemound' <br />0- 31 DWARF BINE GLOBE SPRUCE Picea 4000000 'Glaboso' <br />Thu la occidental's o <br />EROSION CONTROL BLANKET -SEE EROSION CONTROL NOTES <br />NATIVE SEED MIX AS SPECIFIED AND APPROVED BY THE CITY PRIOR TO INSTALLATION <br />CONT. 6' NT. <br />CONT. 18`-24' HT. DENSE BRANCH <br />DENSE BRANCH <br />CONT. 155 -18" HT. DENSE BRANCH <br />CONT. 18 -24' HT. DENSE BRANCH <br />FOR BIDDING ONLY <br />NOT FOR CONSTRUCTION <br />CONSULTANT: <br />OWNER: <br />LEGACY <br />HOLDINGS <br />LL., LLC. <br />1300 WELts FARED LINA <br />MO 7Z RYES INV. SCUI <br />8100IIN41art, 5,455411 <br />'4 0111:0°? <br />PROJECT: <br />LEGACY <br />TOWNHOMES <br />LEGACY <br />AT <br />WOODS <br />EDGE <br />LINO LAME <br />MINNESOTA <br />ISSUE: <br />12/28/05 PRE11.4. WE PLAN <br />8/10/96 C11Y 411011R1AL <br />4 /0 /0e Cm L'OMYENTY <br />8/5/01 01111 SUIMrt1m. <br />8/5/06 MD SET <br />A REV. THIS SHEET <br />ONO REV. THIS SHEET <br />SHEET TIRE: <br />LANDSCAPE <br />PLAN <br />SHEET NUMBER: <br />C5.0 <br />
The URL can be used to link to this page
Your browser does not support the video tag.