PHEASANT STROLL ESTATES
<br />STORM WATER POLLUTION PREVENTION PLAN (SWPPP)
<br />and EROSION CONTROL DETAILS
<br />Lino Lakes, Minnesota
<br />GENERAL EROSION AND SEDIMENT CONTROL
<br />INSPECTIONS AND MAINTENANCE
<br />The Permlllee(0) (either the own or operator) mast roulmdy 0apact the
<br />aonatmetian vile ace every saran (7) days doming active construction and Minks
<br />24 Mare alter a minion event greater than 0.5 Inches In 24 noun.
<br />2 AD inspect/am and maintenance conduelad during eonatmo000 must be recorded In
<br />writing and these mantas must be retained 0140 the SWPPP n accordance with
<br />RECORD OE1ENTION. Recess of each inspection and maln4mmce activity slap
<br />include shag includes
<br />a. Dale and time 0,090.4 ono
<br />b. Name of person(s) conducting hap =Bans
<br />a Findings of ispectnlws including recommendations f. corrective Gelid=
<br />d Corrective ectbns taken (Inched. dates, Ilene, cod party completing
<br />maintananee activities);
<br />0. Date and amount of rainfall everts greater Ind 1/2 inch (0.5 inches)
<br />in 24 hours and
<br />f. Documentation of changes mods 10 the SWPPP.
<br />3. Where perta of the elroctin the have undergone rind stabilization, but Yak
<br />remain, an other parts of the elle, inspection. al the .tabpized area may b0
<br />reduced to once per math. Where work hoe been suspended due to Nom ground
<br />conditions, the Gulf d napeetImv and montmonee must lake Mae as
<br />runoff acorn 01 the site or prlthr th reaming caulruclkn. whichever con. 8nl
<br />4. An creelon prevention and sediment control BMP. must be inspected to mount
<br />integrity and ellecllvaness. An nanlmctionel 8MPe maul be repaired replaced, or
<br />aupplementad with functional 81490. The Pennllee(a) must investigate and comply
<br />with the fallowing inspection and .maintenance requlremenlr,
<br />a All sit Imam must be repaired, replaced at supptemmled when they became
<br />nanbnelimd (develop tea, detach Iran pasty pmt beeeme dislodged from
<br />ground etc) or the sediment reaches 1/3 of the height of the Imce. These
<br />repairs noel be mule within 24 hours of discovery, co. as non es the Oeld
<br />condition. allow occ
<br />b. Temporary and permanent sedimentation ponds must be drained and the sediment
<br />removed when th0 depth of the sediment calleelod in the basin mochas 1/2 the
<br />storage whiffle. OrMMaga and removal must be completed within 72 hours of
<br />discovery or as man m field conditions allow ace=.
<br />e 5urfo. walera, nduding drainage ditches ad conwlance eylem0. must be
<br />inspected for evidence of sediment bong deposited by erosion. The Pemdlaa(e)
<br />frost remove d1 deltas and sediment deposited in surface rater. Including
<br />drainage way. catch bosh,, and other Manage system, and resalabAiee the orm
<br />where eedimmt ramo,& result, in reposed M. The removal and slco01mtlon moat
<br />lake place within sawn (7) days of deeovery unless produded by fugal, regulatory(
<br />or physical cams =natranl. The Permit= small use dl remmable efforts to
<br />obtain a.m. If precluded, remove' and stabilisation must take place within servos
<br />(7) calendar do. al obtaining access. The Perrtdlae is respenad 0 far m ac:ding
<br />all laced, reg /0061 slate and leder0 athortU,o and receiving any applicable permits
<br />prior to concluding my work.
<br />d Can,lractlon ale vehicle exit locutions mutt be Inspected ter evidence off -alto
<br />sediment ',skin onto paved surface. Tracked aedknmt moat be removed from
<br />dl pfd -alle paved ourlaces, within 24 hours of discovery, ce If applicable within a
<br />shorter three
<br />,. The Perm111 =(e) ore responsible for the operation and maInlanan. of temporary
<br />and permanent water ovally management BMP., as well as all erosion prevention
<br />and sediment control BM'. tor the aeration of the construction work at the ate
<br />The 9,6011ee(a) are respond. mil another Penniless has assumed central aver
<br />mos of the ails that how not been Macey stableed or the site 00e undergone
<br />fetal alabUlzatfm. and o Notice of Tannin /Mien has bean submitted to the MPCA
<br />(sea TERMINATION OF 00400000).
<br />L 11 maimed escapes the emanation role 0rl -ale amun00UOO most be removed
<br />a manner and at a frequency sufficient to minimise oft -rile impact. (,g..
<br />Iugl/ive :aliment th streets could be washed into storm sawera by the next ran
<br />and /or pose a solely hazard to mem at public streets).
<br />5 All nIftraLloh areas mist be inspected to mum that no magnets( from ongoing
<br />canalroc001 activities a reaching the 0Rln /on araa and these areas
<br />protected Iran compaction cue la construction equipment among .cross the
<br />infiltration area.
<br />POLLUTION PREVENTION MANAGEMENT MEASURES
<br />The Permitee(s) shall bn&ement the following potation prevention mma9ament
<br />.00005 ee an the air
<br />1. Sand Waste: 00/laelad sediment, asphalt and concrete millings. Rooting debris,
<br />paper, plostk, fabr10, conslructim and demolition debris and other wades mud be
<br />4,40,04 of properly and must comply Mm MPCA disposal requirements
<br />2 Haz.daua Materials 00, gasoline, pant and my hazardous substances/ meet be
<br />property stored ndud g secondary containment, to prevent spills. 1 =W or other
<br />4.000,9. Reminded acaem 1. storage .vas mint be provided to prevent
<br />vandalism Storage and deposal of hazardous wale mual be in compliance with
<br />MPCA regulations.
<br />1 Extern& welding of Iruda and an. eamlrue00n .00ido must be Railed to
<br />dented area of the sfe. Runoll mud be contained and waste preperiy disposed
<br />al. No engine 409000eng is allowed on the.
<br />DEWATERING AND BASIN DRAINING
<br />1. Dewalering or basin draining (.g., pumped discharges. trench/ditch etas for
<br />.anoge) related 10 the construction miNHY that ma7 love 00.1,46 sir eadhn07
<br />laden dlamoa, wale Host be discharged to a temporary or permanent
<br />aedbnenlatlan barn an the projeei site whenever passible. If the water allot be
<br />discharged la a .die .04,50 basin prim to entering the surface water, it must
<br />Mated with the 509,09riola MP. such that the discharge dam not edaeroely
<br />affect the receiving water or downstream landowners. The Permiltee(a) must
<br />ensure that discharge points .e adequately protected from erasion and nom.
<br />The discharge must b, 0 0900004 aver turd rock r1Prap. sand bag.. Matte
<br />sheeting or other accepted energy 4 /04.0llan nummum. Adequate aedmenla8m
<br />control mmwes are reprked I. discharge water that contains suspended sands.
<br />2 All water ham d.001. 0,g or ban draining 0.UW1Ms must be discharged in o
<br />manner that do= 00t cause nuance condition. erasion h receiving channek or
<br />it dnwn0ope 90.perllm, or inundation In wetlands causing agniikmt adv..
<br />Impact to the welled.
<br />AMENDMENTS TO SWPPP
<br />The Perrrlitlee(.) must amend Use 5•590 as necessary to Include addRlm0/
<br />requirements, such as additional or moaned BNps, designed to correct problems
<br />identified or adarma situations Monacan
<br />1. There Is a change In design. construction. apva8on. maintenance. weather or
<br />semen conditions that has a elgnlffeant enact an the discharge of pollutant. to
<br />surface widens or underground watery
<br />2. n./idiom ar nwallgotlana by ale operators, local, data or federal .11/0 is
<br />Indleale the SWP99 Is not affective in eliminating or significantly minimising the
<br />&senora. of pdlolanis to surface walero or underground waters a that the
<br />discharges are cme.g water goodly :Amami es00.000 es, or
<br />1 The 55099 la not achieving the general objectives el controlling palWlots in alarm
<br />voter discharges aafaala/04 with conatruoUan activity, or the 50990 Is not
<br />consistent with the terms and 000411lana al the permIL
<br />4. Al only time alter permit coverage is effective. the 1,10CA may d.to,ndnb that the
<br />pro)ecl', storm voter dlech.ges may cause, have reasonable palmed to mme, or
<br />001,1401, la non-attainment of any applicable water quallky standard. If 49CA
<br />mokas such a delennnallon, the MPCA wgi notify the Pe millee(a) In writing. In
<br />remae0. the Permlttee(a) mural develop a supplemental 13189 aelivn plan a
<br />appropriate SWPPP 000011610001040 deea1ng SWPPP mediacolkms to address the
<br />identified comma and :Omit information requested by the MPCA, which may
<br />include an ndMdual permit application. If MPCA'. 00/11en notification requires
<br />response, IoM.. to respond MOM the epenLled lknehmn. constitutes a permit
<br />vitiation.
<br />FINAL STABILIZATION
<br />The Permllee(e) must ensure find stabilisation ./ the alto. The Permllee(s) must
<br />submit o Notice f Termination within 30 days alter fmol debal:MUan is complete.
<br />or another owner /operator (Pennutee) hoe a men. control over all asecia of Ina
<br />ale that have not mdergone Mal .1ab01zatlm. Ford slab5iza80 con Mt achieved
<br />in one of the Miaowing ways
<br />All can disturbing al the site have been completed and all sons must be stabilised
<br />by o uniform perennial vegetative cover with a denalty of 70 percent over the
<br />mtlre previous surface area or 0158 e90/0 /0 0,t Means nmeseary to prevent -clan
<br />Mora under erosive &menthe ma;
<br />a All drainage 611.1... constructed to drain water from the mile one( construction is
<br />complete maul b. atab410,d to preclude erodore
<br />h. All temporary .yn40e0a d .60040 ras
<br />, eion prevention and sediment control
<br />Best Management Plane (mm as s01 lens.) must be removed m pat of the ate
<br />Ind stabilization; and
<br />a The PemOee(e) meet dean aut an sediment from conveyances and from
<br />temporary sed00t,llon balm that ars to bon used o. permanent water quality
<br />management bans Sedknent must bon stabilised to prevent it ban bang sashed
<br />back into the basin, conveyance and drainage way discharging off -site at to
<br />surtoc0 edam The dam out or permanent hales must be sufficient to realm
<br />the barn to melon e0paalhy.
<br />2 For redden0ol oonetruet /an only, Mal s/ab160160 has been achieved wnan
<br />temporary erasion protection and down gradient perimeter control Is Individual lots
<br />hid been completed and the redden. hid bean transferred to th. homeowner.
<br />Addltiandly, the Perrni 0, must distribute the NPCA 'homeowner fact Maar to the
<br />homeowner to Inform the haneowna of the need for, and benefits of, Mel
<br />.lobilzaua,
<br />RECORD 0E7EN11GN
<br />The 59909, dl changes to IL and nspeellme and maintenance records meet be
<br />kept al the she during eonatnxllan by the Permit. who hos operational control
<br />of that potion of the she. The SWP99 cm be kept In either Iha field office of in
<br />an an-slle vehieh.
<br />NI owner(.) meal keep the 5111"99, along with the 10//0009 additional records, on
<br />lie far three (3) years after submitted of the NOT a. whined in 1000WNA710N OF
<br />COVERAGE This does not Maude any record. alter submittal of the HOT.
<br />1. My other permits requited for tho project
<br />2 Ramada at di inspection and maintenance conducted during 000600/6
<br />1 NI permanent open/Man and maintenance agreemmb th01 hove be. Implemented
<br />Including dl light of way, contracts maenads. and one binding requirement.
<br />regarding perpetual monlm0cy and
<br />4. 00 00409,0 calculations for design of the temporary and permanent storm water
<br />management ,ylem.
<br />TERMINATION OF COVERAGE
<br />1. Permittee(o) witching to terminate coverage under tore permit roust submit a teatime
<br />of Termination (NOT) to the MPCA Compliance with the permdl is required unto a
<br />NOT is submitted The Permlllee(s) autharisatIon to discharge under 4010 permit
<br />terminal. at midnight of the day the NOT Is aired.
<br />2 An Pcrmillen(s) must mbrnll a NOT MUM thirty (30) day. after one or more or
<br />the tattooing conditions hove been mat
<br />a.
<br />b.
<br />Final StobDizolicn hid boon achieved on an portions al the ate I. which the
<br />Pandt= is responsible (including the removal of 0 temporary erasion control
<br />measure such as 05/ isnt, and If applicable, returning agricultural lad to Its pre
<br />em•trvct1., agrlurllurei 0de)1
<br />Mother o.0. /eporat0 (Pennitee) has assumed control amoraig la Part 5.0,5 af
<br />MPCA Permit N0. MN R10000l over an area of the elle that have not been featly
<br />alob0108d; or
<br />For rmla0lld constroMen Wy, temporary erosion protection and mm gradient
<br />perimeter control far individual Iola has boos completed and the residence has
<br />been transferred to the homeowner. Additionally, the Permit. mual 41,04.1, the
<br />A1PCA'e 'hammerer Iactehea0 to the homoomer to inform the homeowner of the
<br />need far, and bene0b of, Mal otaansellan.
<br />SITE SPECIFIC EROSION AND SEDIMENT CONTROL
<br />EVE WFOf6AAT1ON
<br />The project will caudal of the construction of 1 angle land lat. and 27 lownhemes
<br />Two stemma'. ponds 000 one thf4tratlon bash a proposed tar this site hl.
<br />w9 rennet the majority of hare flee: ru n -old (mhos carne roof drainage). The
<br />ponds pds and bean 05 provide ralecontrol an4 sedimentation and mullet to
<br />the melkg 0.0000s on and adjacent to the dia.
<br />San dbtulbng activities will ne1de 0,0400.0.. of a rock =dalmatian entrane0
<br />40,1dloUan of slit fence where surface run -oil leaves slta sits grading (lo Include
<br />the import .1 ..aleria ; atoms sewer, /01/00 ..lemon and asnitary sewer,
<br />bolding construction including foundation excavation: drivmray construction; and
<br />prepa0tbn for tun renteratlen.
<br />TRANSFER ROW TO COUNTY
<br />300' IMPERVIOUS
<br />SEOI$4CE OF 811E ORAE4 443 Ala MAJOR A9IM1102
<br />1. Prior to any grading opera0ans, the 0054,0mor shall Install a rank construction
<br />entrance and perimeter 01/ fence as shown on pion. (Contact City to inspect
<br />era-clan contra measure. If necessary.) Additional di fence may be necessary If
<br />local condition, require.
<br />2. Esmvole pending area and natal ail clop fence around panel of proposed NV.
<br />Memnon.
<br />3.
<br />Perform remainder of site grading on an vee-by -am bawls to minimise
<br />uncompleted areas. M artich area is completed. di exposed eons meet how
<br />�e orrary erasion control protection or permanent wee acevr4ing to the fade.. table
<br />TYPE OF SLOPE
<br />116E•
<br />Steep. than 3:1
<br />Not Allowed
<br />kt to 3:1
<br />14 do.
<br />Flatter than 10:1
<br />21 day
<br />()M0wmum lane an yea can
<br />on an when N b
<br />401 acuwlr b.., wafted)
<br />All sod, seed, mulch and Ier1Sizer eh& contemn with the thawing Mn00T
<br />specincatiens ae modified below.
<br />ITEM
<br />BEFORE CONSIRUCIION
<br />AFTER CONSTRUCTION
<br />TOTAL SITE AREA
<br />10 ACRES
<br />9 ACRES
<br />WEAL 851164100 IMPERVIOUS
<br />0.90 ACRES
<br />2.70 ACRES
<br />TOTAL E511MATE0 PERVIOUS
<br />9.10 ACRES
<br />8.30 ACRES
<br />300' IMPERVIOUS
<br />SEOI$4CE OF 811E ORAE4 443 Ala MAJOR A9IM1102
<br />1. Prior to any grading opera0ans, the 0054,0mor shall Install a rank construction
<br />entrance and perimeter 01/ fence as shown on pion. (Contact City to inspect
<br />era-clan contra measure. If necessary.) Additional di fence may be necessary If
<br />local condition, require.
<br />2. Esmvole pending area and natal ail clop fence around panel of proposed NV.
<br />Memnon.
<br />3.
<br />Perform remainder of site grading on an vee-by -am bawls to minimise
<br />uncompleted areas. M artich area is completed. di exposed eons meet how
<br />�e orrary erasion control protection or permanent wee acevr4ing to the fade.. table
<br />TYPE OF SLOPE
<br />116E•
<br />Steep. than 3:1
<br />Not Allowed
<br />kt to 3:1
<br />14 do.
<br />Flatter than 10:1
<br />21 day
<br />()M0wmum lane an yea can
<br />on an when N b
<br />401 acuwlr b.., wafted)
<br />All sod, seed, mulch and Ier1Sizer eh& contemn with the thawing Mn00T
<br />specincatiens ae modified below.
<br />ITEM
<br />Mn0MT SPECIFICATION AND NOTES
<br />Sod
<br />3876
<br />Seed
<br />3876
<br />For Pending Areas (NHL -HIM.)
<br />Mleture VA (at 6 ms /acre)
<br />For Pandng Nom (HWL -lap of slope)
<br />Mixture WI (at 8 Iba /acre)
<br />For General ideas
<br />Mlslure 01d 500 (50 Iles/acrid
<br />Far Infiltration and Mitigation Mm
<br />Mixture WI (8 lb./acre)
<br />Mulch
<br />3882 (Type 1 - Disc Mchared 2 4ana/0,,)
<br />'Fertiliser
<br />3681
<br />• Fertile. le not recammmded for native seeded area• high nutrient levels' will
<br />Mime weeds.
<br />The 501060tar shill pay edictal attention to all adjacent property Wm and the
<br />storm seam Item the propene. pond to the wetlands. The contractor meet make
<br />re the .bosh control practices bhpla. In those ore. prevents migration of
<br />sediment ado adjacent properties and 0e0anda
<br />11 any dopes oppose La be Ia96g, additional .01 lace, sadlment logs and mission
<br />control blanket Man be added as needed.
<br />The contractor shag maintain and rapak dl .01 len. (heading the removal of
<br />avmuloled .edmml) until vegetation Is mtabilmed osd the die le stabilised,
<br />(5.. also 745PEO11085 AND MAINTENANCE).
<br />4. Remove aceumulatad sediment from pending area upon stabilisation of metros=
<br />5. Upon gadog completion the centred. 5I7011 provide native top.8, seed and
<br />mach anchored with a straight ml disc within 40 hours of final grading.
<br />6. 0s. ..3 son amend be healed loos other mussed soil and sab1,ed within 72 hour.
<br />ADDITIONAL NOTES FOR INFILTRATION BASIN:
<br />1) BASIN TO REMAIN UNUNED (NO 1411111,10 OF SANDY SOILS ALLOWED).
<br />2) CONTRACTOR SHALL 016600E CARE TO 1411461171 C00PACIION OF 5013.
<br />3) FINAL GRADE ONLY UPON STA81112ATION OF UPSTREAM AREAS.
<br />4) AFTER FINAL GRACING, BASIN FLOOR TO BE TILLED TO DEPTH OF 6 INCHES.
<br />5) 115E TOPSOIL /SAND MI% FOR DRESSING IN 1)31 OF TOPSOIL ONLY.
<br />6) USE SEED MI% WI FOR INFILTRATION REVECETAIIO.
<br />7) AFTER FINAL GRADING AND SEEDING SURROUND 8ASNS WITH SILT FENCE 1.I4RL
<br />UPSTREAM AREAS ARE STABILIZED.
<br />EROSION CONTROL AEA R/RES
<br />STRUCTURAL PRACTICES
<br />1. 511 Fancy - en be 6n108ed prior to my grading activities along the perimeter of
<br />thaw portions of the ell. which are downstream of alarm water ran-off
<br />2. Storm wad. Management - Storm water Is to be collected and routed to a
<br />ala001,01 r pond and infiltration basins that are to by constructed for Use site.
<br />the pads /basal 001 provide rate control before exiting into tho isolating wetlands.
<br />3, Worm 500er outlet Protec004 - mch m rn-rop end geansa00 WM fabric vat
<br />bs nslined of the slam sewer mdal Into the pond as a permanent era0lan
<br />earthed measure
<br />OTHER CONTROLS
<br />7. Construction Waste Molenae - All waste materials genaroled as a result of the
<br />comatmdlan shell be collected and removed uccoding to all local ond /sir elate
<br />waste management regulations by a licensed said polo management ceremony.
<br />The eanlroelor 001 ensure not all ells personnel or0 Instructed in them practices
<br />2. Hazardous Wanlm - AR hazardous wade materials shall be stared properly la
<br />prevent spina and vandalism. When mummy, hmardou. wastes 00/ be depo =d
<br />of in the manner specified by local and /sir dote regulation or by the manufacturer.
<br />3. Sanitary Wale - All sanitary waste will be collected from the portable unite by a
<br />/ccol, licensed water 00.ogement company, as required by IoW roguloUon.
<br />4. Offs. Vehicle Tracking - A rack conetrucllon entrance has bean provided to help
<br />reduce ve0lde boating of =c&menls The paved sired adjacent to the site
<br />entrance shell be seep) on on as-needed Maio, or 00 determined by the qty.
<br />Our. truce haling lame materials (and unman. eta) 10 and /or Iron the site
<br />than be .owed with a tarpaulin.
<br />5. Vehlde Cleaning - No engine degreasing a allowed on-site External washing of
<br />vehicles to be confined to a defined area ('bone ytad') .. -04/44
<br />INSPECTIONS Ala 4000BlM)CE PROCEDURES
<br />(Abe see 4npoelbn and14hlamsee' order '08800.00008051 AND 138204E0 WtfROU
<br />The following are the /Impaction and mp4lmanee pmetlem that 011 be used to
<br />maintain erosion and sediment contras.
<br />• All contra measures-wil be- inspected at-least aee-each- week- and7dlewng any
<br />storm even of 05 lachm or gr =1er.
<br />• Ail 091 be antained in good working order; Ito repot a necoasay, It
<br />001 be Initiated within 24 hours or report.
<br />• Runt up claimant .011 be removed Iron at fence when It has reached one -third
<br />(1/3) the height al the lance or one -third depth of fabric in catch basin.
<br />• S11 fence 001 be inspected for depth of sediment, tears, to so. 11 the fabric is
<br />securely attached to the fence post, and to see that the lone pmlo one firmly
<br />In the ground
<br />• T. parY seeding and planting will be nepecled for bare spate, washouts. and
<br />healthy growth.
<br />• A maintenance report van be made alter each inepecea.
<br />4.5805331405555 NF•Ot6AA.Ti7E1
<br />1) Allowable waking hours shall be In conformance to the City of Lin. lokm
<br />2) AD slopes -elle alma he 311 maabnm
<br />FILE COPY
<br />EROSION CONTROL NOTES
<br />0704lm1 1700001 1/0109 k 107/ 1900107001 504 0 0 E
<br />(I) PMOR TO ROUGH M AONIG. INSTALL SILT STOP RACES N LOCATIONS SHOWN
<br />A0O1110NAL .017 STOP 0.44205 DILL BE 0005000 WHERE LOCAL Wr1000N5 000004E
<br />(2) 06078TE PMTS.
<br />(3) ROUGH GRACING SHALL PROCEED ON NI AREA BY AREA BASIS TO MOM
<br />NICOMPLEIT AREAS
<br />(4) AS EACH MEI 6 I725800 PROVIDE MATINS TOPSOIL, 5®, ANO 10%01
<br />ANCHORED WM A SITINGHT SET DISC WTI.N 14 OATS CF RNAL GRADING.
<br />(5) San UNT 6460 ROAM SILT STOP FENCES
<br />. (NC1NlE 100E 9EMOVAL OF ACCUMULATED
<br />(0) REMOVE 000040.4180 5EOIUEI47 M011 POND 440100 THE STE HAS BEEN STARNES).
<br />(7) FOR SEEDING REDUMEMEHTS OF INDIVIDUAL AREAS, SEE SWPPP
<br />f ax airs z/0
<br />r 1E ..d w fwd
<br />Maw pa. 4 w. Roe* ad
<br />ere lam, .0130' r
<br />Oo Al pa. wes Y epees,
<br />000
<br />jab. la sr ,gve.e air we palm
<br />0' w.ww", rrits10/.
<br />0/11 /Aft jawum
<br />rem Imam vw
<br />�
<br />rem ,weep ran
<br />0r fin IMO.
<br />W ebb
<br />M� . . Ode we nww, b ad ...II.
<br />SILT _FENCE
<br />7o Pr Hen 04 ea 1 Alai m 2
<br />IAFT PamR'pN 16741 0407, 75PF
<br />1=
<br />614 Pwfnr 0180 amrwNr rs170 SArx
<br />001 .. =1 '- S',I.1::':
<br />iY
<br />"rm7260 da.w
<br />Warm NM] LRAM alaP m, •07 -0.001 01008
<br />CATCH BASIN INLET
<br />CONTROL OPTIONS
<br />Ion 0PPRO EO E01AL)
<br />00370NW Or CO,S
<br />DRAW 81` CAI/
<br />CHECKED R1`. CGS.
<br />PR03007 /40: 04859
<br />0410
<br />REYLS708
<br />I hereby certify that this pion was prepared by Me or under
<br />my direct supervision and that I am a duly licensed Professional
<br />Engineer upper the lows of the Slate of Minnesota.
<br />lest Aff
<br />k"C7G G. SCHIJCH77NC _I
<br />7/30/06 L/OENS£ / 41295
<br />DATE
<br />SITE PUNNING
<br />ENGNEERNG
<br />PLOWE ENGINEERING, INC.
<br />9180 LEXINGTON AVENUE N.E
<br />CIRCLE PINES MN 55014 -3625
<br />PHONE (763) 785 -1043
<br />ME (763) 786 -6007
<br />PREPARED FOR
<br />BRUNN CUSTOM HOMES
<br />2161 108th Lane NE
<br />Blaine, MN 55449
<br />Phone, 1763) 700 -0223
<br />047E 7/30/06
<br />SHE
<br />C2
<br />
|