Laserfiche WebLink
�tilities: Sanitary sewer and water is already in place in Birch Street. Both of the proposed lots must <br />connect to utilities. Onsite septic systems must be abandoned according to law. In addition, any existing wells <br />likely will have to be capped because of proximity to new sanitary sewer lines. The property to the east is <br />connected to the sewer line near the northeast corner of the subject site. The utility plan needs to be revised to <br />indicate the location of this connection to verify that it lies within drainage and utility easements and that it will <br />not conflict with the infiltration area indicated on the submitted plans. These and other issues discussed in the <br />City Engineer review memo must be addressed to his satisfaction. <br />Grading & Drainage: The grading and drainage plans have been reviewed by the City Engineer and his <br />comments will need to be addressed to his satisfaction prior to the site being developed. Specifically the <br />engineer requested additional drainage information from the applicant to confirm that the drainage calculations <br />where accurate. This information was received by the engineering department, but a review of that information <br />could not be completed prior to this packet being distributed. Therefore that is an outstanding issue that <br />prevents the city engineer from giving a recommendation at this time. <br />The plan is also subject to review and approval from the Rice Creek Watershed District. Staff has received a <br />copy of the CAPROC (Conditional Approval Pending Receipt Of Changes) from RCWD <br />ENVIRONMENTAL BOARD <br />The Environmental Board's did not review this application due to its relatively small scope. <br />• <br />