My WebLink
|
Help
|
About
|
Sign Out
Home
Search
12/13/2006 P&Z Packet
LinoLakes
>
Advisory Boards & Commissions
>
Planning & Zoning Board
>
Packets
>
2006
>
12/13/2006 P&Z Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/25/2014 10:26:11 AM
Creation date
6/24/2014 9:01:09 AM
Metadata
Fields
Template:
P&Z
P&Z Document Type
P&Z Packet
Meeting Date
12/13/2006
P&Z Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
71
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br />Sewer: As with water, there is a sanitary sewer line in White Pine Road, about 1/4 mile <br />north of the study area. Connecting to this would require running the pipe in Laurene <br />Avenue and Rohavic Lane. It also would require either an easement through the Rohavic <br />Oaks residential properties or running along Hodgson to Rohavic Lane. In addition, the <br />comprehensive plan guides this neighborhood as Low Density Unsewered Residential (no <br />utilities to be provided) and the City has received only one inquiry from this <br />neighborhood about providing utilities. Without property owner participation, there <br />would be insufficient funding for utilities and road reconstruction. <br />• Ravens Court <br />Water: Connection to the Ravens Court water is possible. This could address the <br />need to loop the water system to Woodridge or Ware. <br />Sewer: Connection to the Ravens Court sanitary sewer is possible, depending on <br />depth issues and the potential need for a lift station. However, the Raven's Court pipe <br />flows into the Linda Ave. line, which has capacity constraints because of its size. <br />• Ware Road <br />Water: The Ware Rd. properties are undeveloped, so the opportunity exists to plan <br />utility service alignment as land develops. As property develops along Ware Road, the <br />trunk can be brought from that side. However, it will be necessary to provide the water <br />loop as development is planned. <br />Sewer: The Ware Rd. properties are undeveloped, so the opportunity exists to plan <br />utility service alignment as land develops. As property develops along Ware Road, the <br />trunk can be brought from that side. The Ware Road trunk is relatively shallow. <br />Depending on grade elevations for new development, a lift station may be needed. The <br />Ware Rd. pipe is constrained by the capacity of Lift Station No. 3, which handles all the <br />Ware Rd. flow. Even if the lift station's pumps are upgraded, there is a limit on its <br />capacity. The size of the force main from the lift station also limits the potential capacity <br />of this segment of the system. <br />Both the Ware Rd. and Ravens Court pipes flow to Linda Ave. The Linda Ave. pipe <br />itself has a capacity constraint due to its size, which therefore constrains both the pipes <br />flowing into it. <br />Draft December 8. 2006 Hodgson/CR J Master Plan page 22 <br />
The URL can be used to link to this page
Your browser does not support the video tag.