Laserfiche WebLink
Section 2 Subds. 1. — 9. DRAFT AMENDMENTS May 2011 <br />5. Photometric Lighting Plan, to include fixture details /cut sheets /drawings. <br />a. Date of plan preparation and dates of any subsequent revisions. <br />6. Architectural Plans. <br />a. Date of plan preparation and dates of any subsequent revisions. <br />b. Architectural elevations, IN O in color, of all principal and <br />accessory buildings and structures (type, color, and materials used <br />in all exterior surfaces): including structure heights. <br />c. Typical floor plan and typical room plan drawn to scale with a <br />summary of square footage by use or activity. <br />d. A shadow study may be required illustrating shadow encroachment <br />on adjoining properties to ensure that the construction does not <br />limit solar access for abutting and /or neighboring properties. <br />7 Utility Plan. <br />a. Location of hydrants, valves and manholes, if any. <br />b. Location, sizing, and type of water and sewer system mains and <br />proposed service connections, hydrants, valves, and manholes; or, <br />c. Location and size of proposed primary and secondary on -site <br />treatment systems, when allowed. <br />d. Storm sewer, catch basins, invert elevation, type of castings and <br />type of materials (refer to Engineering Manual for City standards). <br />e. Date of plan preparations and dates of any subsequent revisions. <br />Lino Lakes Zoning Ordinance Administration <br />Amended per Ord. No. 05 -09 2 -29 <br />