Laserfiche WebLink
f. Will not result in the destruction, loss, or damage of a natural, scenic or historic <br />feature of major importance. <br />This use is temporary and is not in the immediate vicinity of any natural, <br />scenic or historic feature that would be considered of major importance. <br />b. Conforms to the applicable performance standards of this Ordinance. <br />The proposed performance standards specific to the Temporary Batch Plant use <br />are: <br />1) The Batch Plant shall be located as far away from dwelling units, commercial <br />businesses, and wetlands as is possible. <br />The proposed site is surrounded by Light Industrial properties and is a <br />substantial distance from any dwelling units and commercial businesses. <br />2) The Hours of Operation limitation within the city code shall apply to this use. <br />The Performance Agreement will include a reference to this requirement. <br />3) Access to and from the site shall be reviewed and approved by the City Engineer <br />prior to any construction activity. <br />The Performance Agreement will include an approved access plan for the <br />project. <br />4) The use shall terminate upon completion of the project for which it is intended to <br />serve. <br />The Performance Agreement will include a termination date of 1/1/2111 or 30 <br />days after the completion of the I35E reconstruction project whichever comes <br />first. <br />5) The owner of the property and the operator of the Batch Plant shall enter into a <br />Performance Agreement with the City which will include all requirements of the <br />project, financial surety, and hold both the property owner and the operator liable for <br />the return of the site to its pre - construction state. <br />The Performance Agreement will include Arnt Construction (operator) and Paul <br />Miller (property owner) as parties to the agreement and hold both liable for site <br />reparations. <br />6) An erosion control plan shall be submitted and approved by the City prior to any site <br />disturbance. <br />The Performance Agreement will include references to an approved erosion <br />control plan. <br />• <br />• <br />• <br />