Laserfiche WebLink
h) Canopy column exteriors shall consist of one or more <br />of the following materials for at least one -half of the <br />height of the column: brick, stone (natural or <br />artificial), decorative concrete block, EFIS, stucco. <br />Similar materials may be allowed at the City's <br />discretion. <br />El, Pump Islands. Pump islands shall comply with the following <br />performance standards <br />1) Pump islands shall be elevated six (6) inches above the <br />traveled surface of the site. moved to "fuel facilities" <br />• <br />2) - - - - - - - - -0. feet back <br />from any property line. Additionally, the setback between the <br />pump islands curb face must be at least twenty -four (24) feet. <br />moved to "circulation" <br />ec. Dust Control and Drainage. The entire site other than taken up by <br />a building, structure, or plantings shall be surfaced with asphalt, <br />concrete, cobblestone, or paving brick. Plans for surfacing and <br />drainage shall be subject to approval of the City Engineer. <br />Drainage from all fueling areas shall be directed to an oil /grit <br />separator. Minimum design standards for the oil /grit separator shall IP <br />include the following: <br />1) A minimum of four hundred (400) cubic feet of permanent <br />pool storage capacity per acre of drainage area. <br />2) A minimum pool depth of four (4) feet. <br />3) A minimum oil containment capacity of eight hundred (800) <br />gallons. <br />4) Minimum maintenance /inspection of two (2) times per year <br />and /or after measurable spill events. A measurable spill <br />shall be defined by the Minnesota Pollution Control Agency <br />(MPCA). Any measurable spill event must be reported to the <br />MPCA. <br />fd. Landscaping. <br />1-)- "tom- Teast-z i Thie (-35) percent -of the lot, parcel of-tract-of <br />land used -exclu <br />a- grass -plot, including trees, shrubbery, plantings or fencing <br />Lino Lakes Zoning Ordinance Amended <br />per Ord. No. 21 -03, 04 -05, 09 -06, 11 -08, <br />04 -09, 01 -10, 04 -10, 02 -11 & 03 -11 <br />7 -12 <br />Business Districts <br />