My WebLink
|
Help
|
About
|
Sign Out
Home
Search
09/14/2011 P&Z Packet
LinoLakes
>
Advisory Boards & Commissions
>
Planning & Zoning Board
>
Packets
>
2011
>
09/14/2011 P&Z Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/25/2014 11:50:35 AM
Creation date
6/25/2014 8:38:27 AM
Metadata
Fields
Template:
P&Z
P&Z Document Type
P&Z Packet
Meeting Date
09/14/2011
P&Z Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
55
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Lake Main Motor Fuel CUP <br />Page 10 <br />3. A site performance agreement shall be completed and financial securities submitted <br />prior to the commencement of site work. <br />4. A stormwater facility maintenance agreement for the infiltration basin shall be <br />completed prior to the commencement of site work. <br />5. The canopy light model shall be the recessed CAN - 304 -PS -RS as submitted and <br />shown on the lighting photometric plan. <br />6. Canopy illumination level shown on the photometric plan shall be allowed between <br />5:00 a.m. to 11:00 p.m. Outside of these hours, the fuel pumps may operate but the <br />canopy lighting level shall be significantly reduced to approximately 10% of full <br />illumination. <br />7. The public address system shall be limited to an intercom system and shall not play <br />music or advertising. <br />8. Any permits required by Anoka County, such as for work in the right of way, shall be <br />obtained prior to the commencement of site work. <br />9. Plantings in the infiltration basin must be specified and a five -year maintenance plan, <br />acceptable to the City and prepared by a qualified firm, must be submitted for the <br />native plantings prior to commencing site work. <br />OPTIONS <br />1. Recommend approval of the amendment to the conditional use permit for a motor <br />fuel station, with the conditions listed. <br />2. Recommend denial of the application. <br />RECOMMENDATION <br />Option 1 <br />This report is based on the following information: <br />• Certificate of Survey, rec'd August 22, 2011 <br />• Site Plan, August 22, 2011, rec'd August 22, 2011 <br />• Grading, Drainage & Erosion control Plan, dated and rec'd September 1, 2011 <br />• Utility Plan and Details, dated and rec'd September 1, 2011 <br />• Landscape Plan and Details, rec'd August 22, 2011 <br />• Photometric Plan, June 16, 2011, rec'd August 22, 2011 <br />• Canopy Luminaire Specifications for CAN - 304- PS -RS, rec'd August 22, 2011 <br />• Building, Canopy, and Monument Sign Elevations, August 16, 2011, rec'd August <br />22, 2011 <br />• <br />
The URL can be used to link to this page
Your browser does not support the video tag.