My WebLink
|
Help
|
About
|
Sign Out
Home
Search
09/14/2011 P&Z Packet
LinoLakes
>
Advisory Boards & Commissions
>
Planning & Zoning Board
>
Packets
>
2011
>
09/14/2011 P&Z Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/25/2014 11:50:35 AM
Creation date
6/25/2014 8:38:27 AM
Metadata
Fields
Template:
P&Z
P&Z Document Type
P&Z Packet
Meeting Date
09/14/2011
P&Z Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
55
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br />• <br />• <br />Memorandum <br />DATE: September 7, 2011 <br />TO: Jeff Smyser, City Planner <br />FROM: Jason Wedel, City Engineer <br />RE: Lino Lakes Convenience Store <br />An initial review of the submittal for the above - referenced project was completed by <br />TKDA per the memorandum from Chris Winter to then City Engineer James Studenski <br />dated March 1, 2011. The documents that were reviewed are as follows: <br />• Certificate of Survey dated December 23, 2010 <br />• Site Plan dated February 7, 2011 <br />• Grading, Drainage and Erosion Control Plan dated February 7, 2011 <br />• Landscape Plan (Sheets L1 and L2) dated February 7, 2011 <br />• Stormwater Drainage Report dated February 9, 2011 <br />• Existing and Proposed Drainage Area Maps dated February 8, 2011 <br />• Drainage Diagram for Infiltration dated February 9, 2011 <br />• Existing Site Photos and Aerial Photography received February 7, 2011 <br />There were a number of comments /concerns that were identified within the TKDA <br />memorandum that related to the Site Plan, Grading Plan, Stormwater Drainage Report <br />and Landscape Plan. To address those comments /concerns the applicant's engineer <br />resubmitted the following documents: <br />• Certificate of Survey received August 22, 2011 <br />• Site Plan received August 22, 2011 <br />• Grading, Drainage and Erosion Control Plan received August 22, 2011 <br />• Landscape Plan (Sheets L1 and L2) received August 22, 2011 <br />• Oil/Water Separator information received August 8, 2011 <br />• Stormwater Drainage Report dated August 12, 2011 <br />Based on my review of the revised documents as well as the City's new engineering <br />consulting firm, WSB & Associates, it was determined that the majority of the <br />comments /concerns that were identified originally had been addressed. However, the <br />grading of the site and the design of the oil /water separator still required modification. <br />
The URL can be used to link to this page
Your browser does not support the video tag.