My WebLink
|
Help
|
About
|
Sign Out
Home
Search
09/14/2011 P&Z Packet
LinoLakes
>
Advisory Boards & Commissions
>
Planning & Zoning Board
>
Packets
>
2011
>
09/14/2011 P&Z Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/25/2014 11:50:35 AM
Creation date
6/25/2014 8:38:27 AM
Metadata
Fields
Template:
P&Z
P&Z Document Type
P&Z Packet
Meeting Date
09/14/2011
P&Z Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
55
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Lake Main Motor Fuel CUP <br />Page 3 <br />Intersection Signalization and Right Of Way <br />Lino Lakes held a referendum in 2010 on signalizing two intersections, including Lake <br />Drive and Main Street. The referendum passed and plans are being prepared. Based on <br />preliminary analyses there may be minimal effect on this site. It is possible that some <br />additional right of way will be required along Main Street, perhaps five feet, but it isn't <br />clear that will be needed. <br />Conditional Use Permit <br />The new canopy, pumps, signage, site layout, and other elements are discussed below <br />under the respective CUP conditions. There are general criteria for all CUPs and specific <br />conditions that apply to motor fuel stations. <br />General CUP Criteria: Section 2, Subd. 2.B.7. of the zoning ordinance lists the <br />general criteria that apply to all CUPs. The Planning and Zoning Board shall recommend <br />a conditional use peirnit and the Council shall order the issuance of such permit only if it <br />finds the following criteria have been met: <br />a. The proposed development application has been found to be consistent with the policies and <br />recommendations of the Lino Lakes Comprehensive Plan including: Land Use Plan, <br />Transportation Plan, Utility (Sewer and Water) Plans, Local Water Management Plan, Capital <br />Improvement Plan, Policy Plan, Natural Environment Plan. <br />• The site is guided and zoned for commercial uses. <br />b. The proposed development application is compatible with present and future land uses of the <br />area. <br />• The site is guided and zoned for commercial uses, but we must be aware that it <br />abuts a residential area on the west. With adherence to the recommended <br />conditions of approval, the application complies with code requirements and is <br />compatible with other land uses. <br />c. The proposed development application conforms to performance standards herein and other <br />applicable City Codes. <br />• The site is guided and zoned for commercial uses. With adherence to the <br />recommended conditions of approval, the application will conform to <br />performance standards. City code requirements and policies apply and will be <br />enforced. <br />d. Traffic generated by a proposed development application is within the capabilities of the City <br />when (specific levels of service listed in the ordinance are met): <br />• The site operated as a motor fuel station for several decades without traffic <br />generation problems. The new pumps will not change traffic generation. The <br />Lake Drive /Main Street intersection will be improved and the intersection will be <br />signalized in year 2012. The proposed motor fuel use will not interfere with those <br />plans. Access is always an important issue. The site's driveway on Lake Drive is <br />
The URL can be used to link to this page
Your browser does not support the video tag.