Laserfiche WebLink
3) Parking Lot. Five (5) feet. <br />c. Side Yard. <br />1) Principal Building. Ten (10) feet. <br />2) Accessory Building. Ten (10) feet. <br />3) Parking Lot. Five (5) feet. <br />d. From property guided by the comprehensive plan for residential <br />developmentResidential District. Seventy-five (75) feet. <br />t../ MIA,. S. Wane <br />C. Buffer. Where a side or rear lot line in an LI District coincides with an adjacent <br />public road right-of-way or property guided by the comprehensive plan for <br />residential or commercial development, a landscape buffer area shall be <br />provided along such side or rear lot line not less than forty (40) feet in depth and <br />shall contain landscaping. planting, bermind or other effective screening suitable <br />to provide an effective screen in compliance with Section 3. Subd. 4,Q.6 of this <br />Ordinance, <br />Maximum Building Height <br />allowed by Section 3. Subd. 4.0. <br />• No building in the LI District shall be <br />Forty-five (45) feet in height, except as <br />E. Maximum Impervious Surface Coverage. In no event shall off street parking <br />e-ightySeventy-five (8-575) percent of the lot area <br />percent pervious landscaped area. <br />F. Building Requirements. All newly constructed industrial buildings shall meet <br />the exterior building standards of Section 43, Subd. 4.B.4 of this Ordinance. <br />area sha <br />e - - <br />be provided along such side or r ar iot line not less than fo <br />40 <br />eet <br />Lino Lakes Zoning Ordinance <br />8-2 <br />Industrial Districts <br />• <br />• <br />