My WebLink
|
Help
|
About
|
Sign Out
Home
Search
07/11/2012 P&Z Packet
LinoLakes
>
Advisory Boards & Commissions
>
Planning & Zoning Board
>
Packets
>
2012
>
07/11/2012 P&Z Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/25/2014 11:32:03 AM
Creation date
6/25/2014 10:06:40 AM
Metadata
Fields
Template:
P&Z
P&Z Document Type
P&Z Packet
Meeting Date
07/11/2012
P&Z Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
59
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3. Properly drain, fill, or level off any pit or excavation so as to make the same safe <br />and healthful as the permitting authority may detelliiine <br />Again, no open pits are proposed for this project /site. <br />4. Limit the depth of such excavation to an elevation no lower than the minimum <br />floor elevation for building construction as established by the City Engineer, so as <br />not to diminish development potential of the parcel. <br />There is not excavation below the surrounding grade, and the potential <br />development of the site will not be diminished. <br />5. Limit any fill material to clean fill, defined as rock, sand, gravel, clay, or other <br />like and similar non - decomposable material. Concrete, asphalt, metal, wood. and <br />other debris shall be prohibited. <br />All fill used on the site will be inspected to determine that it meets city <br />standards. <br />6. Require that all decomposable material, or other unsuitable foundation material, <br />be removed from an area before deposition of fill begins. <br />All construction will be done on suitable fill materials. <br />7. Prepare a site plan showing existing and proposed grade elevations and effect of <br />stoini water drainage on adjacent areas. <br />The submitted plans show the existing and proposed grade elevations as well <br />as drainage directions. <br />8. Specify a time when the excavation or land reclamation project shall be <br />completed. <br />The project is proposed to be completed within a 3 week period (weather <br />permitting) after approval by the City Council. <br />9. Place a minimum of four (4) inches of top soil over the completed project and <br />establish appropriate ground cover within sixty (60) days of completion, or in a <br />time period consistent with the City's storm water management and pollution <br />prevention plan. <br />This will be a condition of approval for the request. <br />10. Reimburse the City for the cost of periodic inspections by the City for the purpose <br />of determining that the terms under which the permit has been issued are being <br />complied with. <br />A Site Performance Agreement shall be required to outline financial <br />securities and an appropriate escrow deposit to cover inspections. <br />• <br />• <br />• <br />
The URL can be used to link to this page
Your browser does not support the video tag.