My WebLink
|
Help
|
About
|
Sign Out
Home
Search
04/10/2013 P&Z Packet
LinoLakes
>
Advisory Boards & Commissions
>
Planning & Zoning Board
>
Packets
>
2013
>
04/10/2013 P&Z Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/25/2014 3:17:46 PM
Creation date
6/25/2014 11:58:39 AM
Metadata
Fields
Template:
P&Z
P&Z Document Type
P&Z Packet
Meeting Date
04/10/2013
P&Z Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
67
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br />• <br />ZONING REQUIREMENTS AND STANDARDS <br />Lot 1, Block 1 <br />GB- General Business <br />Required <br />Proposed <br />Min. Lot Size <br />20,000 sf <br />51,791 sf <br />Min. Lot Width <br />100 ft <br />166 ft <br />This is a corner lot and front yard setbacks shall apply along Main Street (CSAH 14) and <br />Otter Lake Road. Side yard setbacks shall apply elsewhere. <br />SURROUNDING ZONING AND LAND USE <br />Direction <br />Zoning <br />Existing Land Use <br />Future Land Us <br />North <br />R -BR <br />Rural Business <br />Reserve <br />Agricultural <br />Commercial <br />South <br />LI <br />Light Industrial <br />Industrial <br />Industrial <br />East <br />GB <br />General Business <br />Agricultural <br />Commercial <br />West <br />GB <br />General Business <br />Agricultural <br />Commercial <br />SUBDIVISION ORDINANCE <br />Attachment D- Subdivision Review Worksheet provides a summary checklist of the <br />City's subdivision ordinance. The proposed preliminary plat is not considered premature <br />and it meets the performance standards of the Subdivision and Zoning Ordinance. <br />COMPREHENSIVE PLAN <br />Resource Management System <br />The Resource Management Plan identifies a proposed north -south trail and greenway <br />system in the subject site area. A trail is being installed as part of the Otter Lake Road <br />extension and the greenway system coincides with the existing wetlands on the north end <br />of the site. <br />Land Use Plan <br />As identified above, the land use is guided for commercial development and is within the <br />2020 MUSA and lA Utility Staging Area. <br />
The URL can be used to link to this page
Your browser does not support the video tag.