Laserfiche WebLink
• <br />• <br />Vaughan' s 1st Addition Page 4 December 26, 2007 <br />Drainage Calculation Review <br />City of Lino Lakes, Minnesota <br />16. It is highly recommended that temporary erosion control blanket be used in the infiltration basin to <br />help prevent the seeds from floating and being transported downstream. <br />12/26/07 This item has been addressed. <br />Additional Item (12/26/07) <br />17. The concrete washout area labeled on the Grading Plan will need to be moved out of the 75 <br />foot shore impact zone and located in an area that will minimize the potential for concrete <br />and rinse water to impact the wetland and adjacent buffer areas. Provide a detail of a <br />concrete washout area on the plan. The detail should show how the rinse water and concrete <br />will be contained in the washout area. A note should also be included on the plan that <br />requires proper off -site disposal of the waste concrete and rinse water. <br />