My WebLink
|
Help
|
About
|
Sign Out
Home
Search
01/09/2008 P&Z Packet
LinoLakes
>
Advisory Boards & Commissions
>
Planning & Zoning Board
>
Packets
>
2008
>
01/09/2008 P&Z Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/27/2014 11:18:37 AM
Creation date
6/26/2014 1:06:41 PM
Metadata
Fields
Template:
P&Z
P&Z Document Type
P&Z Packet
Meeting Date
01/09/2008
P&Z Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
67
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
VA UGHAN'S 1ST ADDITION <br />GRADING, DRAINAGE, AND EROSION CONTROL PLAN <br />0 <br />30 60 <br />SCALE IN <br />,IN <br />ASA <br />LOT <br />ASA <br />ASA <br />,1a <br />I <br />NOTE: AU.413ISTURBANCE WITHIN <br />.e. THE WETLAND BUFFER AREA _ <br />SHALL BE RESTORED WITH <br />NATIVE VEGETATION. <br />5U6O0PLAINs, 1 <br />' iItL = 200 CY <br />_� —884- - wL� \\ <br />m.2" <br />Z —A`' <br />ae1 <br />Ordinary High Water Elevation: 883.7 <br />,(100 -YEAR HIGH WATER ELEVATION) <br />RCWD Flaodplain Elevation: 887.6 <br />/ <br />Edgg Of Wetland As Delineated <br />By Wenck Associates <br />On October 23, '2007 COMPENSATORY, \ { <br />>� <br />STORAGE = 204 CY''`AN <br />76.5 —ft We>land Huffer <br />■ <br />■ <br />!JLJTLOTA <br />Total Lot Area: 147,236 sq. ft. <br />Total Impervious Area: 2,964 sq. ft. <br />Impervious Surface Coverage: 2.O1% <br />Upland Lot Area: 20,127 sq. ft. <br />Upland Impervious Area: 2,527 eq. ft. <br />Upland Impervious Coverage: 12.55% <br />NOTE ALL ROOF,IDRAINS FOR <br />PROPOSED HOUSE SHALL BE <br />WRECTED INTO THE INFILTRATION <br />BASIN. <br />Shore Impact Zone Area 32,226 sq. ft. <br />Grading Area Within Zone: 8,849 eq. ft. (27.5%) <br />GRADING NOTES7 50— f t Setback from OHWL <br />k • <br />pr 41 <br />'OCK.CONSiRUCTIQN ENTRANCE <br />THE EXISTING WELL SHALL BE REMOVED IN ACCORDANCE VATH ALL FEDERAL, STATE, AND LOCAL REQUIREMENTS. <br />PROPOSED CONTOURS REPRESENT FINISHED SURFACE ELEVATIONS. SPOT ELEVATIONS ALONG EXISTING CURB DENOTE TOP <br />OF CURB. <br />EXISTING UTIUTIES SHOWN ON THESE PLANS ARE BASED ON RECORD DRAWINGS AND, WHERE POSSIBLE. MEASUREMENTS <br />TAKEN IN THE FIELD. THE INFORMATION IS NOT TO BE RELIED ON AS BEING EXACT OR COMPLETE. CONTRACTOR SHALL <br />CONTACT THE APPROPRIATE UTILITY COMPANIES AT LEAST 48 HOURS PRIOR TO EXCAVATION, TO REQUEST EXACT FIELD <br />LOCATION OF UTILITIES. THE CONTRACTOR IS RESPONSIBLE FOR RELOCATING ALL EXISTING UTIUIIES WHICH CONFUCT WITH <br />THE PROPOSED IMPROVEMENTS SHOWN ON THE PLANS. <br />CONTRACTOR TO CALL GOPHER STATE ONE CALL (1- 800 -252 - 1166) 48 HOURS PRIOR TO EXCAVATION FOR LOCATIONS OF <br />UTILITIES. <br />CONTRACTOR REQUIRED TO PROTECT THE TREES TO BE SAVED. SHOULD ANY PORTION OF THE TREE BRANCHES REQUIRE <br />REMOVAL TO PERMIT OPERATION OF THE CONTRACTOR'S EQUIPMENT, THE CONTRACTOR SHALL OBTAIN THE SERVICES OF A <br />PROFESSIONAL TRIMMING SERVICE TO TRIM THE TREES. SHOULD THE CONTRACTOR'S OPERATIONS RESULT IN THE BREAKING <br />OF ANY UMBS, THE BROKEN UMBS SHOULD BE REMOVED IMMEDIATELY AND CUTS SHALL BE PROPERLY PROTECTED TO <br />MINIMIZE ANY LASTING DAMAGE. NO TREES SHALL BE REMOVED WITHOUT AUTHORIZATION BY THE ENGINEER. COSTS FOR <br />TRIMMING SERVICES SHALL BE CONSIDERED INCIDENTAL TO THE GRADING CONTRACT. <br />CONTRACTOR SHALL STRIP, STOCKPILE AND RE- SPREAD SUFFICIENT TOPSOIL TO PROVIDE A MINIMUM FOUR INCH DEPTH TO ALL <br />DISTURBED AREAS TO BE SODDED OR SEEDED. <br />THE PROPOSED GRADING PLAN INDICATES FINAL GRADING AFTER THE HOUSES ARE CONSTRUCTED. THE CONTRACTOR SHALL <br />APPLY A HOLDDOWN OF 2.25' ACROSS THE BUILD PAD LOCATIONS DURING THE GENERAL GRADING OF THE SITE THE <br />FINISHED BUILDING SUBGRADE ELEVATION SHALL NOT VARY BY MORE THAN 0.10 FEET ABOVE OR BELOW THE PROPOSED <br />ELEVATION. STREET OR PARKING AREA SUBGRADE ELEVATION SHALL NOT VARY BY MORE THAN 0.05 FEET ABOVE OR <br />BELOW THE PRESCRIBED ELEVATION. AREAS TO RECEIVE TOPSOIL SHALL BE GRADED TO WITHIN 0.10 FEET OF THE <br />REQUIRED ELEVATION UNLESS DIRECTED OTHERWISE BY THE ENGINEER. TOPSOIL SHALL BE GRADED TO WITHIN 14 INCH OF <br />THE SPECIFIED THICKNESS. <br />THE CONTRACTOR SHALL COMPLY VAN THE REQUIREMENTS OF THE MINNESOTA POLLUTION CONTROL AGENCY - NATIONAL <br />POLLUTANT DISCHARGE ELIMINATION SYSTEM (NPDES) PERMIT. CONTRACTOR SHALL BE A CO- APPLICANT WITH THE OWNER. <br />THE CONTRACTOR SHALL COMPLETE THE REQUIRED INSPECTION REPORTS AND BE RESPONSIBLE FOR MAINTENANCE OF THE <br />EROSION CONTROL DEVICES IN ACCORDANCE WITH THE NPDES PERMIT AND THE SWPPP FOR THIS PROJECT. <br />RUFFED <br />GROUSE <br />ROAD <br />- <br />EROSION CONTROL NO 1 ES <br />INLET PROTECTION SHALL BE INSTALLED AT <br />THE CATCH BASINS ON RIFFED GROUSE ROAD <br />THAT ARE NEAREST TO THE CUL -DE -SAC <br />f <br />THE CONTRACTOR SHALL ASSUME COMPLETE RESPONSIBIUTI FOR CONTROLLING ALL SILTATION AND EROSION OF THE <br />PROJECT AREA. ALL EROSION CONTROL AND SILTATION CONTROL MEASURES SHALL COMPLY WITH MINNESOTA'S BEST <br />MANAGEMENT PRACTICES MANUAL THE CONTRACTOR SHALL USE WHATEVER MEANS NECESSARY TO CONTROL EROSION AND <br />SILTATION INCLUDING, BUT NOT UNITED 1O, STAKED STRAW BALES, ROCK ENTRANCES AND /OR SILT FENCES. CONTROL <br />SHALL COMMENCE WITH GRADING AND CONTINUE THROUGHOUT THE PROJECT UNTIL ACCEPTANCE OF WORK BY THE OWNER. <br />THE CONTRACTOR'S RESPONSIBILITY INCLUDES: ALL DESIGN AND IMPLEMENTATION AS REQUIRED TO PREVENT EROSION AND <br />THE DEPOSITING OF SILT. THE OWNER MAY, AT HIS/HER OPTION, DIRECT THE CONTRACTOR IN HIS/HER METHODS AS <br />DEEMED FIT TO PROTECT PROPERTY AND IMPROVEMENTS. ANY DEPOSITING OF SILT OR MUD ON NEW OR EXISTING <br />PAVEMENT OR IN EXISTING STORM SEVERS OR SWALES SHALL BE REMOVED AFTER EACH RAIN AND AFFECTED AREAS <br />CLEANED TO THE SATISFACTION OF THE OWNER, ALL AT THE EXPENSE OF THE CONTRACTOR. <br />ALL EROSION CONTROL MEASURES MUST BE INSTALLED PRIOR TO COMMENCEMENT OF GRADING OPERATIONS AND BE MAINTAINED <br />UNTIL AU. DISTURBED AREAS ON THE SITE HAVE BEEN RESTORED. <br />TEMPORARY EROSION CONTROL TO BE PLACED AROUND STORM DRAIN STRUCTURES DURING CONSTRUCTION. <br />SEDIMENT SHALL BE REMOVED FROM ALL SEDIMENT CONTROL DEVICES AS NECESSARY AND MUST BE REMOVED IF DESIGN <br />CAPACITY HAS BEEN REDUCED BY FIFTY PERCENT. <br />A STABIUZED CONSTRUCTION ENTRANCE SHALL BE INSTALLED AT THE BEGINNING OF CONSTRUCTION AND MAINTAINED FOR <br />DURATION OF PROJECT. <br />ALL SLOPES 3:1 OR STEEPER, NOT TO BE SODDED AND GREATER THAN EIGHT FEET IN HEIGHT, SHALL HAVE EROSION CONTROL <br />FABRIC INSTALLED <br />WHEN THE SITE GRADING CONSTRUCTION IS COMPLETED, THE CONTRACTOR SHALL SEED AND MULCH THOSE AREAS AS <br />DIRECTED BY THE OWNER WITHIN 48 HOURS OF GRADING COMPLETION. THE SEEDING SHALL COMPLY WLTH MN/DOT <br />SPECIFICATION NO. 3876, AT A RATE OF 50 LBS /ACRE THE SEEDED AREA SHALL BE MULCHED. THE MULCH SHALL APPLY <br />WITH MN/DOT SPECIFICATION 3882, TYPE 1. THE MULCH SHALL BE APPUED AND ANCHORED IN ACCORDANCE WITH MN /DOT <br />SPECIFICATION NO. 2575.3, F1. MULCH SHALL BE APPLIED AT THE RATE OF 2 TONS PER ACRE. THE MULCH SHALL BE <br />ANCHORED WITH A DISC, CLODBUSTER OR OTHER APPROVED EQUIPMENT. <br />ALL ADJACENT STREETS SHALL BE INSPECTED DAILY AND SWEPT CLEAN OF SEDIMENT TRACKED FROM THE SITE <br />,s. <br />.6 <br />Ju <br />RECEIVED <br />DEC 14 2007 <br />CITY OF LINO LAKES <br />75— ft Shcre /mr"act Zone <br />GRADING LEGEND <br />SF - <br />1.3x <br />EXISTING CONTOURS <br />PROPOSED CONTOURS <br />SILT FENCE <br />DRIVEWAY SLOPE <br />SOIL BORING <br />4)-.-1 45"f <br />LOCATION MAP <br />NOT 10 SCALE <br />SECTIONS 27, & 28, TOWNSHIP 31, <br />RANGE 22 <br />ANOKA COUNTY, MINNESOTA. <br />INFILTRATION NOTES <br />A. WHEN THE SITE GRADING CONSTRUCTION IS COMPLETED, THE CONTRACTOR SHALL <br />SEED AND MULCH THOSE AREAS AS DIRECTED BY THE OWNER WITHIN 48 HOURS OF <br />GRADING COMPLETION. THE SEEDING SHALL COMPLY WITH MN /DOT SPECIFICATION N0. 3876 <br />, AT A RATE OF 50 LBS /ACRE THE INFILTRATION BASIN BOTTOM SHALL BE SEEDED WITH <br />NDOT SEEDING MIX 350. THE SEEDED AREA SHALL BE MULCHED. THE MULCH SHALL <br />APPLY WITH MN/DOT SPECIFICATION 3882, TYPE 1. THE MULCH SHALL BE APPLIED AND <br />ANCHORED IN ACCORDANCE WITH MN/DOT SPECIFICATION N0. 2575.3, F1. MULCH SHALL <br />BE APPUED AT THE RATE OF 2 TONS PER ACRE. THE MULCH SHALL BE ANCHORED <br />WITH A DISC, CLODBUSTER OR OTHER APPROVED EQUIPMENT. ALL FILTRATION AREAS <br />SHALL BE KEPT OFFUNE UNTIL FINAL STABIUZATIDN IS COMPLETE <br />B. THE INFILTRATION BASIN SHALL BE STAKED OFF AND MARKED. HEAVY EQUIPMENT <br />SHALL BE KEPT OUT OF INFILTRATION AREAS TO PREVENT COMPACTION OF SOILS. <br />C. THE INFILTRATION BASIN SHALL BE GRADED FIRST, AFTER THE EROSION CONTROL IS <br />INSTALLED. THE CONTRACTOR SHALL TAKE ALL NECESSARY MEASURES TO ENSURE THE <br />INFILTRATION CAPACITY IS MAINTAINED DURING CONSTRUCTION. <br />D. THE INFILTRATION BASIN SHALL NOT BE EXCAVATED TO FINAL GRADE UNTL THE <br />CONTRIBUTING DRAINAGE AREAS HAVE BEEN CONSTRUCTED AND FULLY STABILIZED. <br />E. FINAL EXCAVATION OF THE INFILTRATION BASIN SHALL BE COMPLL ItU USING UGHT <br />TRACKED EQUIPMENT TO AVOID COMPACTION OF THE BASIN FLOOR. <br />F. TEMPORARY EROSION CONTROL BLANKETS ARE RECOMMENDED FOR USE IN THE <br />INFILTRATION BASIN TO PREVENT SEED LOSS AND TRANSPORTATION. <br />PFDECI <br />2003.001 <br />DATE <br />12/14/07 <br />SHEET r <br />5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.