My WebLink
|
Help
|
About
|
Sign Out
Home
Search
02/10/2010 P&Z Packet
LinoLakes
>
Advisory Boards & Commissions
>
Planning & Zoning Board
>
Packets
>
2010
>
02/10/2010 P&Z Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/27/2014 2:45:01 PM
Creation date
6/27/2014 1:59:18 PM
Metadata
Fields
Template:
P&Z
P&Z Document Type
P&Z Packet
Meeting Date
02/10/2010
P&Z Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
55
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br />• <br />See attached plans. <br />(b) Each application shall be filed with the city engineer. <br />(c) Each application for permit shall be accompanied by a fee, <br />the amount of which shall be determined by the City Council. <br />(4) Conditions. The city engineer or City Council, as a prerequisite to <br />the granting of a permit, may require the applicant or the owner of the premises <br />to incorporate and attach any conditions or restrictions that it deems necessary <br />for the preservation of health, welfare, and safety of the citizens: <br />(a) Properly fence any pit or excavation and barricade entrances <br />to prevent the general public from depositing garbage or refuse; <br />Access to the site is limited and silt fence will be installed. <br />(b) Slope the banks and otherwise guard and keep any pit or <br />excavation in a condition as not to be dangerous because of sliding or caving <br />banks; <br />Slope maximums will be set at 3 :1 (3 feet of horizontal for every 1 <br />foot of vertical drop). <br />(c) Properly drain, fill, or level off any pit or excavation so as to <br />make the same safe and healthful as the permitting authority may determine; <br />Final grading, seeding and landscaping will level of the excavation. <br />(d) Limit the depth of the excavation to an elevation no lower <br />than the minimum floor elevation for building construction as established by the <br />city engineer so as not to diminish development potential of the parcel; <br />Excavation of the flood plain mitigation area will reach an elevation <br />of 883 5 feet above the normal water level and 3 feet below the 100 <br />year flood level. <br />(e) Limit any fill material to clean fill, defined as rock, sand, <br />gravel, clay, or other like and similar non - decomposable material. Concrete, <br />asphalt, metal, wood, and other debris shall be prohibited; <br />Anoka County and the contractor will ensure clean fill is hauled in <br />and placed in all areas with fill being placed. <br />(f) Require that all decomposable material, or other unsuitable <br />foundation material, be removed from an area before deposition of fill begins; <br />Construction of replacement bridges at Chomonix Golf Course <br />Page 10 of 12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.