My WebLink
|
Help
|
About
|
Sign Out
Home
Search
04/14/2010 P&Z Packet
LinoLakes
>
Advisory Boards & Commissions
>
Planning & Zoning Board
>
Packets
>
2010
>
04/14/2010 P&Z Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/1/2014 4:48:29 PM
Creation date
6/27/2014 2:25:16 PM
Metadata
Fields
Template:
P&Z
P&Z Document Type
P&Z Packet
Meeting Date
04/14/2010
P&Z Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br />• <br />• <br />Interim Use Permit <br />2209 Phelps Road <br />page 9 <br />1. Existing Uses. Existing uses shall be in conformance with zoning and building standards in <br />effect at the time of initial construction and development, and may not be enlarged or <br />expanded except under the terms for newly established uses, and shall continue to be <br />governed by such regulations in the future. <br />2. New Uses. <br />a. Meets the standards of a conditional use permit set forth in Section 2, Subd. 2 of this <br />Ordinance. <br />• The proposed interim use permit for outdoor storage complies with the <br />conditional use permit standards as discussed in Finding 2. <br />b. Conforms to the applicable performance standards of this Ordinance. <br />• Stormwater management, and traffic control are satisfactorily addressed by the <br />proposal. Screening exists along Otter Lake Road. <br />c. The use is allowed in an interim use in the respective zoning district. <br />• The Light Industrial zoning district includes one interim use at Sec. 8, Subd. 1.K.: <br />open and outdoor storage as a principal use <br />d. The date or event that will terminate the use can be identified with certainty. <br />• The interim use permit will expire in five (5) years, with the possibility of <br />extension by the City Council. <br />e. The use will not impose additional costs on the public if it is necessary for the public to take <br />the property in the future. <br />• No additional costs will be borne by the public. <br />f. The user agrees to any conditions that the City Council deem appropriate for permission of <br />the use. <br />• The applicant will be bound by the conditions approved by the City Council. The <br />City Council has the option of denying the request. <br />Finding 2. The general standard for interim use permits in Sect. 2, Subd. 3.C.2.a. incorporates <br />the general standards for all conditional use permits as listed in Section 2, Subd. 2. <br />The proposed interim use permit complies with these standards as follows: <br />Subd. 2. Administration: Conditional Use Permits. <br />B. Procedure. <br />7. Standards. The Planning and Zoning Board shall recommend a conditional use permit and the <br />Council shall order the issuance of such permit only if it finds the following criteria have been met: <br />a. The proposed development application has been found to be consistent with the policies and <br />recommendations of the Lino Lakes Comprehensive Plan including: <br />1) Land Use Plan. <br />2) Transportation Plan. <br />3) Utility (Sewer and Water) Plans. <br />4) Local Water Management Plan. <br />5) Capital Improvement Plan. <br />
The URL can be used to link to this page
Your browser does not support the video tag.