My WebLink
|
Help
|
About
|
Sign Out
Home
Search
12/08/2010 P&Z Packet
LinoLakes
>
Advisory Boards & Commissions
>
Planning & Zoning Board
>
Packets
>
2010
>
12/08/2010 P&Z Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/1/2014 11:47:27 AM
Creation date
6/30/2014 12:10:49 PM
Metadata
Fields
Template:
P&Z
P&Z Document Type
P&Z Packet
Meeting Date
12/08/2010
P&Z Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
40
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TKDA <br />ENGINEERING 'ARCHITECTURE PLANNING <br />Th right firm. The rht peop, The right company <br />MEMORANDIJM <br />444 Cedar Street, Suite t 500 <br />Saint Paul. MN 55101 <br />{551) 292-4400 <br />051} 202-0M83 Fax <br />vrectlida.arn <br />To: Jeff Smyser, City Planner Reference: Century Farms 5th Review <br />Copies TO: City of Lino Lakes, Minnesota <br />Proj. No.: 14547.000 <br />From: James E. Studenski, P.E. Routing: <br />Date: December 1, 2010 <br />The following site review is based on these submittals: <br />1. Proposed PUD and Preliminary Plat Amendment, Century Farms North 5th Addition plan set, 7 pages <br />dated November 2, 2010. <br />Century Farms North 5th Preliminary Plat, received November 4, 2010. <br />Plat Comments: <br />1. The existing utility and drainage easements must be vacated. <br />New drainage and utility easements must be shown on the plat. <br />Street and Park Comments: <br />1. Additional Robinson Drive right of way is shown as required. <br />2. All park area south of Robinson Drive is shown as dedication to the City. <br />Sanitary Sewer and Waterrnain Comments.: <br />1. All sanitary sewer and water services were installed during the previous phase. <br />Street, Storm Sewer and Drainage Comments: <br />1. All street and storm sewer improvements were installed during the previous phase. <br />2. All grading and house elevations are the same as the previous phase design. <br />Storm Water Management Comments: <br />1. The RCWD existing Permit No. 02-129 must be reviewed to determine if Phase 5 can continue with it or <br />if a new permit is required. <br />An Employee Owned C:ornpany Prompting Alfirmalwe Arbon and Equal Opportunity <br />• <br />• <br />• <br />
The URL can be used to link to this page
Your browser does not support the video tag.