My WebLink
|
Help
|
About
|
Sign Out
Home
Search
02/09/2000 P&Z Packet
LinoLakes
>
Advisory Boards & Commissions
>
Planning & Zoning Board
>
Packets
>
2000
>
02/09/2000 P&Z Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/1/2014 11:32:26 AM
Creation date
6/30/2014 1:12:33 PM
Metadata
Fields
Template:
P&Z
P&Z Document Type
P&Z Packet
Meeting Date
02/09/2010
P&Z Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
51
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br />• <br />Site Plan Review, Anoka Parks <br />February 9, 2000 <br />page 2 <br />Three walls will include windows. This building will have vending machines on the <br />exterior of the northwest wall. The building will house the lifeguard office and locker <br />room <br />The restroom building (drawing A6) will be approximately 25' x 25' with an additional <br />roof overhang. The overhang on two sides will be about 7' and 2' on the other two sides. <br />Asphalt shingles will cover the pitched roof which will peak at about 15' in height. The <br />north and south sides will feature barrel vaults on the roof with louvres. Cedar siding <br />will cover the exterior walls. <br />The picnic shelter (drawing A7) measures 50' x 50' square. A concrete floor will be <br />covered by a sheltering pitched roof topped by a clerestory structure. A 24' x 30' area <br />will have an overhead trellis extending from one side of the shelter. On another side, the <br />floor slab will extend out to a 6' fire pit surrounded by crushed rock.. The roof will peak <br />at 24' in height and will be covered with asphalt shingles. The support columns will be <br />covered with cedar lap siding. <br />Roads: Access will be via the access road to the Park. off Main St. <br />Utilities: An existing 6" water well on the site will continue to serve site, including <br />the new buildings. The site will connect to Centerville sanitary sewer. We have not seen <br />the utility plans for the sewer connection. A condition of approval should require that the <br />utility plans must be submitted for review by the Lino Lakes City Engineer. <br />Environmental Board Review: The Environmental Board reviewed this project at <br />its January 26 meeting. The Board had no recommendations on the project. <br />Conditions of Approval <br />Staff recommends approval of the site and building plan with the following conditions: <br />1. Final utility plans shall be submitted for review by and obtain the approval of the <br />Lino Lakes City Engineer. <br />OPTIONS <br />1. Approve site and building plan as submitted with the conditions listed in this report. <br />2. Table application and return to staff with direction. <br />RECOMMENDATION <br />Option 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.