Laserfiche WebLink
Jeff Smyser, Mary Kay Wyland <br />April 6, 2000 <br />• <br />However, this site's post development runoff is double the pre - development <br />runoff. Restrictions should be placed in the storm sewer to limit the runoff <br />rate to pre - development conditions in order to preserve adequate storm <br />sewer capacity for adjacent development. <br />6. Storm sewer hydraulic computations have not been submitted. <br />7. No storm sewer details are shown. <br />8. The location of the rock entrance is not shown. The "coral sea" reference <br />should be deleted. <br />9. The eastern exit from the site must be striped and signed to show it is right <br />turn only. <br />10. The western access will be used by the adjacent site also. <br />11.The final Certificate of Survey must be submitted. <br />12. The proposed pavement section is not shown. <br />13.A wetland mitigation plan has not been submitted. A permit from the Rice <br />Creek Watershed District is required for the site grading and wetland <br />mitigation. <br />14.A permit is required from Anoka County for any work within the Otter Lake <br />Road right -of -way. <br />15.The plan indicates this site is in Blaine and is south of "Frechman" Road, <br />neither is correct. <br />16.There are two CB5's on the plan. <br />17.The southwest portion of the grading plan does not show the grading <br />transition into the wetland. <br />18.The utility services into the building shall six inch, minimum. <br />19. Disturbed areas must be re- vegetated as soon as possible. <br />If you have any questions, please let me know. <br />• <br />