My WebLink
|
Help
|
About
|
Sign Out
Home
Search
05/10/2000 P&Z Packet
LinoLakes
>
Advisory Boards & Commissions
>
Planning & Zoning Board
>
Packets
>
2000
>
05/10/2000 P&Z Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/1/2014 11:09:55 AM
Creation date
6/30/2014 1:55:25 PM
Metadata
Fields
Template:
P&Z
P&Z Document Type
P&Z Packet
Meeting Date
05/10/2000
P&Z Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
57
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br />• <br />Planning & Zoning Board <br />April 12, 2000 <br />Page 9 <br />current and draft Comprehensive Plan. A bank building with drive - through capacity <br />requires a conditional use permit. <br />Staff noted the submittal complies with the requirements of the GB zoning district and <br />reviewed the proposed building appearance which is similar to the existing structure at <br />Lake Drive and Town Center Parking. Staff reviewed their analysis of the project aspects <br />including lighting, signage, landscaping, utilities, road, access and circulation, and <br />parking. With regard to the minor subdivision needed to facilitate the necessary minor <br />subdivision, the proposed lot will be 150' x 250' for 62,500 square feet. The current <br />survey document indicates no structures so Staff would require a survey document <br />containing the building placement prior to issuance of the building permits. Staff <br />recommends approval with minor revision to the site plan and subject to eleven <br />conditions. <br />Chair Schaps asked the applicant if he had anything to add to Staff's presentation. <br />John Milbauer, applicant and president of the Lino Lakes State Bank, stated he had <br />nothing to add. <br />Mr. Rafferty inquired regarding the shingles. <br />significant cost savings by shifting to shingle <br />Chair Schaps asked for further public inp <br />close the public hearing. <br />stated there will be a <br />eing none, he entertained a motion to <br />Mr. Zych made a MOTION to clo :"'p .` c hearing at 7:39 p.m., and was supported <br />by Mr. Johnson. Motion carr <br />M. Schilling inquired regardin gnificant drainage and elevation issues. Mr. Powell <br />stated a regional water quality pon is located south/east of the site and the concern is to <br />control the rate of drainage from this site. He stated this is commonly done in developed <br />areas and Staff is comfortable they can revise the site to accommodate Staff's concerns. <br />Mr. Rafferty asked if the road will be directly behind this. Mr. Millbauer stated the road is <br />380 feet south of the County Road centerline. Mr. Powell stated that is correct and the <br />recommended conditions allowed additional right -of -way dedication on Otter Lake Road. <br />Ms. Lane made a MOTION to approve the minor subdivision for Lino Lakes State Bank, <br />to allow the construction of a branch bank at Otter Lake Road and a to be constructed <br />service road and was supported by Mr. Johnson. Motion carried 5 -0 -1 (Chair Schaps <br />abstained). <br />Mr. Johnson made a MOTION to approve the conditional use permit, and site plan review <br />for Lino Lakes State Bank, to allow the construction of a branch bank at Otter Lake Drive <br />and a to be constructed service road subject to the following conditions: <br />
The URL can be used to link to this page
Your browser does not support the video tag.