Laserfiche WebLink
Twin City Fab <br />Site Review <br />July 5, 2000 <br />Page 2 <br />11) Details for all storm sewer and sanitary sewer structures need to be included in the plans. <br />12) All of the proposed inlets and outlets for the ponding area must be shown, including those <br />being built by others. <br />13) The rim and invert elevations on the proposed storm sewer being done by others needs to <br />be listed. <br />14) Polyethylene encasement of the watermain is not required. <br />15) The wrong casting is listed for the sanitary sewer manholes. It should be a R -1642 B <br />with "Sanitary Sewer" stamped on it. <br />If you have any questions please do not hesitate to give me a call. <br />• <br />• <br />