My WebLink
|
Help
|
About
|
Sign Out
Home
Search
08/09/2000 P&Z Packet
LinoLakes
>
Advisory Boards & Commissions
>
Planning & Zoning Board
>
Packets
>
2000
>
08/09/2000 P&Z Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/1/2014 10:44:33 AM
Creation date
6/30/2014 3:19:55 PM
Metadata
Fields
Template:
P&Z
P&Z Document Type
P&Z Packet
Meeting Date
08/09/2000
P&Z Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
112
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ENVIRONMENTAL BOARD MEETING MAY 31, 2000 <br />Mr. Johnson commented on the natural water table in this area and impact caused by the <br />construction of the road, deep sanitary sewer, and other projects. He advised that all of <br />the ponds are in nonhydric soils and are dry because of the low water table level. <br />Trehus asked about the suggestion of staff to connect Pond 1 to the other side of Apollo <br />Drive. Mr. Johnson stated Pond 2 is on the south side of Apollo Drive and the proposal is <br />to divert water from the freeway culvert to the west into Pond 2 until it is at an elevation <br />to outflow into the culvert under Apollo Drive. Staff's proposal is to connect Pond 1 with <br />Pond 2 via a pipe under Apollo Drive. <br />Mach asked if there is an opportunity to install a cattail wetland to act as a filter to <br />Marshan Lake. Asleson stated he understands the desire for a vegetated filter strip but he <br />does not think there is an opportunity to do so. Mr. Johnson stated this site is a long way <br />(three - quarters to one mile) upstream from that point and he doe,. irk . ow what is <br />available from Lake Drive to Marshan Lake to provide additi . r i ent. Also, the <br />area is very flat. <br />Mach advised of a different project that successfully .u'F seq. ents via a vegetative <br />filter. <br />Acting Chair Lanyon asked the members to addres <br />Donlin suggested plantings that do not <br />and oak trees. <br />Davidson noted that resident <br />plan can be presented to t <br />buffer with a wooded <br />trees planted in laye <br />O'Connell as <br />he does not kn <br />that edge must b! <br />landscaping will <br />berm would provide <br />nsive watering such as prairie stock <br />visual year -round screen. Asleson stated a <br />at area including the option of a vegetation <br />as well as prairie vegetation. He suggested oak <br />vegetation would better block sounds. Mr. Johnson stated <br />uses will be but the City has previously indicated the uses on <br />m + atible with the residential homes to the west. He agreed that <br />vide a better visual buffer a story and a half off the ground than a <br />• <br />Acting Chair Lanyon asked why there is a need to do anything on the berm at this point. <br />Mr. Johnson stated they now have the opportunity to obtain fill material at a lower cost. <br />Because of that, they would like the ability to accept that fill material and stockpile it <br />until it is needed. <br />Acting Chair Lanyon stated that depending on what is built, a berm may be better or a <br />vegetative screen may be better. Until it is known what is being built, that decision can <br />be delayed. <br />5 <br />• <br />1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.