My WebLink
|
Help
|
About
|
Sign Out
Home
Search
10/11/2000 P&Z Packet
LinoLakes
>
Advisory Boards & Commissions
>
Planning & Zoning Board
>
Packets
>
2000
>
10/11/2000 P&Z Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/1/2014 10:22:56 AM
Creation date
6/30/2014 3:56:48 PM
Metadata
Fields
Template:
P&Z
P&Z Document Type
P&Z Packet
Meeting Date
10/11/2000
P&Z Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
54
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br />• <br />• <br />North American Composties <br />October 11, 2000 <br />page 2 <br />• Building <br />The building footprint is approximately 24,980 sf. The warehouse portion will cover <br />about 20,120 sf and office portion will cover about 4860 sf. The warehouse portion will <br />be 26' 4" high. The office portion will be 16' 4" high. <br />The exterior walls of the warehouse portion of the building will be precast concrete <br />panels. The office portion exterior will be decorative concrete block. The roof will be <br />standing seam metal on both portions of the building. <br />The office entry and loading docks are on the east side of the building. An automatic <br />gate will separate the front parking area from the loading area. A six -foot chain link <br />fence will surround the rear parking and loading area. <br />The trash area will be screened with masonry to match the office exterior. <br />• Lighting <br />Cut -sheet pictures of proposed light fixtures show hooded fixtures for all but the F -4 <br />fixture (Lumark Nite Watch). The others are shoebox or hooded fixtures, but F -4 directs <br />light horizontally from the wall. This is not acceptable under our policy of requiring that <br />lighting be directed down rather than horizontally or up. Another fixture must be <br />substituted for the Lumark Nite Watch. <br />The lighting photometric plan indicates that lighting will meet City maximum of 1 foot <br />candle at the center line of a public street. We will check to ensure the requirement will <br />be me with the replacement of the fixture noted above. <br />• Signage <br />Signage is governed by the City's sign ordinance and permits are required for all signs. <br />All signs will be reviewed with the sign permit applications. <br />• Landscaping <br />The submitted landscaping plan is extensive and includes numerous native seeds. The <br />applicant used the draft new landscaping ordinance as a guide. However, the City <br />Environmental Specialist wants revisions to the plan regarding species and soil treatment. <br />Another landscaping plan must be submitted and obtain the Environmental Specialist's <br />approval. <br />• Utilities <br />The City Engineer has reviewed the preliminary utility plan and grading plan. Some <br />revisions are necessary, as listed in his October 5 memo. The revisions to the plans must <br />be submitted and obtain the City Engineer's approval before City Council approval. The <br />
The URL can be used to link to this page
Your browser does not support the video tag.