My WebLink
|
Help
|
About
|
Sign Out
Home
Search
09/11/2001 P&Z Packet
LinoLakes
>
Advisory Boards & Commissions
>
Planning & Zoning Board
>
Packets
>
2001
>
09/11/2001 P&Z Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/1/2014 1:51:04 PM
Creation date
7/1/2014 10:27:28 AM
Metadata
Fields
Template:
P&Z
P&Z Document Type
P&Z Packet
Meeting Date
09/11/2001
P&Z Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
103
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br />• <br />• <br />Molin Concrete <br />September 11, 2001 <br />page 5 <br />A condition of approval listed in this report is that these would be submitted and <br />reviewed before City Council consideration of the applications. <br />Landscaping Plan: No landscaping around the new building is planned. The section <br />of this report on the conditional use permit discusses landscaping for the larger site. <br />Green space: A maximum of 90% of the site can be impervious surface in the <br />General Industrial and Light Industrial zones. The proposal will not exceed this. <br />Traffic, Circulation: The proposed new building will not interfere with or <br />impact traffic on surrounding roads. Internal circulation is governed by the <br />manufacturing process and storage needs. Truck parking on the roads is governed by the <br />CUP. <br />Parking: There is no parking requirement listed in the ordinance for heavy <br />manufacturing. An analysis in 1997 of previous action on the site included a parking <br />needs calculation using as a basis the parking requirement for a light manufacturing <br />facility. The standard for a light manufacturing facility is one parking space for each <br />employee or one space for each 2000 square feet of gross floor area, whichever is greater. <br />For the sake of consistency, it is useful to compare the new application with that 1997 <br />analysis. <br />The total square footage was 110,200 sf for existing and, at the time, future anticipated <br />buildings. The analysis resulted in a requirement of 55 off - street parking spaces. A <br />"future" manufacturing building of 35,000 sf on the old plan is the comparable to this <br />new building, which is about 38,000 sf. The office building that was built is 6511 sf <br />rather than the 4800 sf anticipated in 1997. There are 76 existing parking spaces now. <br />If off - street parking causes a problem in the future, the City can re- examine the site to <br />determine means of eliminating any safety concerns. <br />Stormwater Management: The grading and drainage plan was reviewed by the Rice <br />Creek Watershed District and received preliminary approval. The proposed plan includes <br />enlarging and existing pond in the northwest corner of the site, creating a new pond in the <br />interior of the site, and an infiltration area between the two. The drainage plan is subject <br />to the review of the City Engineer. <br />Wetlands: The proposed project will require filling of an existing wetland in the <br />southeast corner of the site. Molin has received preliminary approval from the Rice <br />Creek Watershed District for the wetland impacts. Additional wetland will be created in <br />the northwest corner of the site by enlarging the pond there. <br />Sign: Molin has not proposed new signage. <br />
The URL can be used to link to this page
Your browser does not support the video tag.