My WebLink
|
Help
|
About
|
Sign Out
Home
Search
02/14/2007 P&Z Packet
LinoLakes
>
Advisory Boards & Commissions
>
Planning & Zoning Board
>
Packets
>
2007
>
02/14/2007 P&Z Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/2/2014 11:06:10 AM
Creation date
7/1/2014 1:03:31 PM
Metadata
Fields
Template:
P&Z
P&Z Document Type
P&Z Packet
Meeting Date
02/14/2007
P&Z Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
136
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br />• <br />• <br />• <br />STORM WATER POLLUTION PREVENTION: <br />Apply for and obtdn all needed storm water permits from the appropriate acts candy oM load <br />governmental agency. <br />Stamm Ife.igfidgILPinston_am..26RE5 The SWPPP irelud.0 Eie narrative, the Grading, <br />IXilly, end Erosion Control Plane, and the Detail *heeds. Keep b copy of the SWPPP, <br />all changes to R, and msp.onons and maintenance record. al the see during the <br />corearuaian <br />ALL SILT FENCE MUST BE INSTALLED BY THE CONTRACTOR AND INSPECTED BY <br />T1.12 CITY PRIOR TO ANY 517E WORK. <br />CONTACT PROJECT MANAG(•,R <br />HOLIDAY STATIONSTOREB <br />4567 AMPRICAN BLVD <br />BLOOMINGTON. MN <br />052-830-8586 <br />Erosion Control Noiee <br />Per NP05 ca,pliarae, Conhv01a .hell toles necessary ersmu /iaro he prevent eat and debris <br />run-elf during grating operations. lia alt ferns reek dikes, •rat C.Nro0ar .tae In.tdl M <br />✓ e.ion canned rtrwures prior to commencement of any see groans On a daily bow, <br />Connector .hall n.pfot and maintain resign cannel devices through out the emir* <br />construction Pried until all pavement* have been installed and Iond.aap areas have been <br />.odd.d a,a stabilised <br />Reek cenepuotian .ntrence.l.tans pads) Mall be heaped at all alb entry /exit pants AL <br />tantrootor..hall remove einem .eel from tires on .0 mnstrualian vendee prior to Nosing <br />the 0onesua00 .he. AR seamed on areas must be removed by the re.penable <br />oonrasta0 each do% <br />We .hall be re-vegetated ne in 411 hours of rough and red grading- .w L.d000p. Plan, <br />Sheer LI, When provided as pen or coamtchon document sal. During eaeneed grading <br />operations exposed eons shall be melded nth dean ergs man In prevent •aenesre cad <br />IoM and *MP erasion <br />On site temporary foil emkphng, N .farm on this Ran Shea, are suggested area. Any <br />• w •eel wheel be trucked oft' see as neon as construction aline. All sale removed rron <br />ate arse be the neeponsib6y of the controatar and are 0ublwd to erosion control standard. <br />and meagemrd prachw. Stock pew arca W protected aganst erosion from wins and <br />water. <br />The coreramur .tall amnesia .lain ream./ amnion cannel lamM,I.I prior to inrlming <br />work. Ali eine eater maw *hall be amend na temporary boars to abeam. suspended <br />.olid. Wlt, .l.1 Iran leaving the avoruaron at. <br />When permanent storm eater boobs me designsd far .h• .arm eater eeagement, <br />Conevmer eau construct storm retention basin ail high..? Fierily, before inhaling overall <br />grading .prates and the instdlden buildings or other .is famines At time of completion <br />or dread, contractor .hall excavate all gnomon from the basin to reflect grades per plan <br />Contractor .hell remove sediment cafes an repair .Ipe roam within 7 days of gash <br />RIM Peiodi0 mammon= of me .Rant pendia all be required during a:nommen This <br />malnteanse .11 be the responsibility of the mnemonic <br />NI Iwo areas that are a 9. sodded aloe be stared on elopes greater then 31, as vial as <br />in nfanogs .wales Areas to be seeded shall be maned acrediot6y upon seed 0ppeceenn <br />H9pvuitiirg web wed N oanpn•bte provided the mulch and 0004 mania N reapplied in <br />6eee•d areas in a timely same. Slimed hydra rrulav g not retain mile in ae.ples <br />drainage areas and .sale., mmveter shall install re mta ees or an to store acceptable <br />vegaanv. covers ors in ploas. Note trtaf Nt ranee and rooked seas may reran in peas <br />in prublernalic cress Corerachr Mall rneieein seeded and .added areas veil lawn cress <br />ere fully esa6ished and manor sin rr eerweuNS after each stern ever <br />- Contractor i. respectable for 0.0005 and searing Mr depotss ere n on Me storm systems <br />when requ.eed by corner en athsr madden.. and m ms of propel ce nplenen <br />-Refer to all other project plan and information rented to mi. work. <br />Veg.toen Primev.tion Nam Corereelx Mall evoke Bee Mwagenee Practices to prevent <br />all loss during p106ot. censfruore. Preserve man, vegsta901 by Wining work zones <br />no hail the anus. of soil net Is daurbed during worn. phases or the projects / <br />certain/idiom <br />RPOII1P9n 91 IPP /RFVPGFTATION IN DAYS IPFRMANANT OR TEMPORARY COVER/ <br />10:1 OR FLATTER/ 21 DAYS MAX TO REVEO2TATIONSLOPE STABILIZATION' <br />10.1 TO 35 SLOPES/ 7 DAYS MAX TO R2VE0ETATION/ SLOPE STABILIZATION 2,p <br />GREATER THAN 3:1/ 3 DAYS MAX TO R2V20ETATION/SLOPE STABILIZATION A. <br />CONVEYANCE DITCHES/ COVERED WITHIN 24 HOURS OP DISTURBANCE <br />• <br />. <br />t <br />501.9? NARRATIVE <br />HOLIDAY STATION STORES INTENT TO IMPROVE AN EXISTING SITE THRU REDESIGN <br />AND THE CREATION OF STORM WATER DEVICES TO PR0V10E CLEAN WATER <br />DISCHARGE FROM THE EXISTING SITE <br />CONSTRUCTION SEQUENCE AS FOLLOWS: <br />•INSTALL EROSION CONTROL MEASURES <br />*INSTALL STORM SEWER <br />*INSTALL STRUCTURES <br />*INSTALL PAVEMENTS <br />* INSTALL LAWN/ LANDSCAPE <br />* FLUSH STORM SEWER <br />.REMOVE EROSION CONTROL MEASURES ONLY AFTER ALL PAVEMENTS HAVE BEEN <br />INSTALLED AND ALL SOILS HAVE B22N STABILIZED <br />THE RECEIVING WATERS OF THE 519 I5 MARSHAN LAKE SURFACE WATER LEAVES <br />T142 SITE THRU CONVONTANCE DITCHES BEGINNING AT THE DITCH JUST SOUTH OF <br />THE PROPERTY. <br />EROSION CONTROL PRACTICES INCLUDE BUT ARE NOT LIMITED TO THE FOLLOWING <br />SILT FENCES <br />ROCK CONSTRUCTION ENTRANCES <br />TEMPORARY ROCK DIKES <br />TEMPORARY AND PERMANENT STORM PONDS <br />TEMPORARY SEEDING AND MULCHING <br />STORM WATER CATCH BASIN EROSION CONTROL 2291025 <br />TEMPORARY BERMS <br />STREET CLEANING <br />CONTRACTOR 0000 FAITH AND 088ERVATION PRACTICES <br />NOTE: Final storm Warr pond as designed as planned due to lined land resources <br />for small site, ponds such 00 these are ?9pcdly dente in the water abed knowing <br />the Noted spool. we has to work wtlh. <br />EROSION <br />CONTROL <br />SEED <br />NATI"- SEE <br />LANDSCAPE <br />PLAN <br />SHEET LI <br />FXISTING SITE CONDITIONS <br />ZONING DISTRICT: GO GENERAL 6USINES6 <br />TOT SITE AREA <br />AROCOVER: <br />ROPOSED SITE CONDITIONS <br />100,271 5P <br />a <br />RAY TAKING: <br />HOL <br />HOLIDDAY TAIL:TORE <br />RE <br />.69060020 RETAIL <br />Nerrt., <br />SERVE AT <br />TEMPORARY AND <br />NAL 6WRY <br />6/ 0 do DIRECTED <br />�ATr ` TO POND. <br />TT- see TOMPORART POND <br />N6CppP —.6592 APPROVE MUST <br />LAN 2 APPROVED 6Y <br />SHEET LI ITT PRIOR TO <br />E060WG <br />REND WATER <br />13216 SF <br />02,675 SP <br />50,507 5P <br />565 <br />36% <br />BUILDING SETBACKS PARKING SETBACKS <br />FROM STREET 30 FROM STREET 15' <br />REAR YARD 50 REAR YARD 10 <br />8102 YARD 10 SIDE YARD 10 <br />1:621.10A11212_6012=12_01.112111061 <br />PROPOSED 00220 AREA <br />PROPOSED HARD COVER: <br />PAVED AREA: <br />WILDING AREA <br />C -STORE • <br />CAR WASH • <br />40,700 SF <br />51,570 6F <br />46,436 9F <br />5545 SF <br />44% <br />56X <br />505 <br />PARKING REQUIREMENTS <br />PARKING REQUIRED 1/200 SP PM 25 STALLS <br />PARKING PROVIDED 26 9TAL1-9 <br />RETAIL LOT PROPOSED CONDITIONS <br />PROPOSED GRE204 ARC, <br />PROPOSED HARD 110922, <br />PAVED AREA <br />WILDING AREA <br />PARKING REQUIREMENTS <br />PARKING REQUIRED <br />PARKING PROVIDED <br />30635 SF <br />28,46 SF <br />22,448 SF <br />6500 6F <br />515 <br />45% <br />3061 <br />V200 SP PA. 20 STALLS <br />52 STALLS <br />ERC 6C- PE <br />DETAILS <br />SHEET SPQ , <br />v' 1 +. <br />I <br />i7 <br />SHEET 916 .dI SHEET 596 <br />RUCTION ENTRANCE <br />PER SHEET SP6 <br />usreNCE PER SHEET SP6 <br />NO <br />ACCESS <br />RECEIVED <br />FEB 0 9 2007 <br />CITY OF LINO LAKES <br />INSITES <br />Pximwuke. Stn ne ne kg 774.7 <br />7e7. .Deer bo <br />W <br />CC H <br />0 <br />O u, <br />H z <br />/A' Z <br />C/) <br />/ m <br />Z <br />O Y <br />Q <br />< J <br />CO J <br />ALL a1R6T10115 IRIATEO 70 <br />11100606 AID tzx0Teuenas OP <br />Ti16 PRoJeCT IINALI 1141 <br />memo TO HOLIDAY <br />00401001 PROJECT Sanaa <br />10 Reel11aS STREET 00* *19 1 6117 <br />wnorna M71 <br />0117 00106 <br />z0 <br />cc la <br />>e <br />co o w <br />I hereby certify that INN plan, <br />speclncation, or u o <br />0?t a <br />a a der my <br />direct supervision, and that 1 ann <br />o duly licensed Landscape <br />Architect under the laws of the <br />Stare of Minnesota. <br />Date Roc. 6.. 16306 <br />Signed <br />Robert J. Muller <br />N0. DATE MISSION WO®TION <br />__T este -.MO son AIM= <br />DATE 01/0/07 PML NB 2007 a <br />5P5 <br />FILE <br />
The URL can be used to link to this page
Your browser does not support the video tag.