Stormwa ter Pollution Prevention Plan
<br />The work described to implement the following Storm Water Pollution Prevention
<br />Pion (SWPPP) shall be considered part of the Contract Documents and shall be
<br />performed by the Contractor. The work to install and mointoin the Best
<br />Management Practices (BMP's) to prevent erosion and provide sediment control
<br />shall be in accordance with Permit No. MN R100001 and shall include, but are
<br />not necessarily be limited to, the requirements contained herein.
<br />1. Construction Activity Information
<br />Project Name: COMFORTS OF HOME
<br />Project Address /Location:
<br />City/Township: Cary Of LINO LAKES State: MN Zip Code: 55014
<br />County Parcel ID Number(s):
<br />3- 119 -21 -22 -0011
<br />3- 119 -21 -22 -0020
<br />3- 119 -27 -22 -0008
<br />3- 119 -27 -22 -0007
<br />3- 119 -21 -22 -0001
<br />3- 119 -21 -22 -0017
<br />All cities where construction will occur: CIfy of Lino Lakes
<br />48 townships where construction will occur: Not Applicable
<br />All counties where construction will occur: Anoka
<br />Project Size (number of acres to be disturbed): 16.85
<br />Project Type: XX Residential dX Commercial /Industrial
<br />_ Rood Construction _Other ( descnbe)
<br />Cumulative Impervious Surface:
<br />Existing oreo of impervious surface to nearest quarter acre: 0
<br />Post construction oreo of impervious surface to nearest quarter acre: 10.5
<br />Receiving Waters:
<br />Nome of Water Bodv
<br />XX
<br />Dates of Construction
<br />Estimated Construction Start Dote: AUGUST 1, 2006
<br />Dote: AUGUST 1, 2007
<br />Contact Information
<br />tcQf
<br />WETLAND
<br />Appendix A Special Wafer?
<br />No
<br />Estimated Completion
<br />owner of Project Site: CORE DEVELOPMENT
<br />Business /Firm Nome. CORE DEVELOPMENT
<br />Federal Tax ID Number: ovonbble os needed
<br />State Tax ID Number: available as needed
<br />Contact Person: Mork Bigelboch Title: President
<br />Phone: (651) 481 -9027
<br />Moiling Address: 1793 Buerkle Circle City White Bear Lake State:
<br />Code: 55110
<br />E -mail Address: none
<br />MW Zip
<br />Contractor (Party who will oversee implementation of the SWPPP. May be some
<br />party as Owner above):
<br />Business/Firm Name: CORE DEVELOPMENT
<br />Federal Tax ID Number: available as needed
<br />State Tax ID Number: available as needed
<br />Contact Person: Mark Bigelboch Title: some
<br />Phone: same
<br />Moiling Address: Some City some State.
<br />Zip Code: some
<br />E -moil Address: none
<br />Alternate Contact Person: TED Phone- IRD
<br />E -moil: none
<br />Description of the type and locutions of BMP's appropriate for this site and
<br />sufficient to comply with oil applicable requirements of the TMDL implementation
<br />plan and identification of the receiving water and of the areas of project site
<br />discharging to on impoired water that hos on approved TMDL implementation
<br />plan that contains requirements for construction Slormwoter discharges:
<br />Not opp9coble to this project.
<br />Selection of Permanent Stormwater Management System
<br />Will the project create a new cumulative impervious surface greater than or
<br />equal 10 one acre? XX nee — No
<br />1f yes. o water quality volume of )i inch of runoff from this area must be
<br />treated before leoving the site or entering surface waters (1 inch of runoff
<br />from this area if discharging to special waters).
<br />Method(s) to be used to treat runoff from the new impervious surfaces created
<br />by the project:
<br />glir Wet sedinentalion basin dZ lnfilrolion/Filtration basin
<br />Regional ponds — Combination of practices
<br />Description of treatment method(s) to be used, including design information for
<br />each method
<br />THREE wet sedimentation basins will be constructed as shown on the plan. The
<br />basis hove been designed to provide o water quokty volume of 0.5 inch of
<br />runoff from the /NM impervious surfaces that drain to eoch respective basin.
<br />Each basin has also been designed to provide o permanent volume of 1.800
<br />cubic feet of storage below the outlet invert pipe elevation for each acre that
<br />drains to the respective basin. The permanent depth of each basin will be
<br />between 3 and 10 feet. Each basin's outlet is designed to discharge the water
<br />quality volume at no more than 5.66 cubic feet per second per acre of basin
<br />surface area. Access is provided to each basin for future basin maintenance.
<br />The outlet for each basin has been located to minimize the potential for
<br />short- circuiting and includes o floral end section and riprop for energy
<br />dissipation. Each basin has been designed with o stabilized emergency overflow
<br />to accommodate storm events in excess of the basin's hydraulic design.
<br />Description of why it is not feasible to meet the treatment requirement for
<br />water quality volume. This can include proximity to bedrock or rood projects
<br />where the lock of right -of -way precludes the installation of any permanent
<br />stormwater management practices. Description of what other treatment, such
<br />as grossed 'wales, smaller ponds, or grit chambers. will be implemented to
<br />treat runoff prior to discharge to surface waters:
<br />Not Appicable
<br />Description of how a proposed alternative method to treat runoff from new
<br />impervious surfaces will achieve approximately 80R removal of total suspended
<br />solids on on onnuol overage basis:
<br />Not Appkcob7
<br />3. Erosion Prevention Practices
<br />Description of construction phasing, vegetative buffer strips, horizontal slope
<br />grading, and other construction practices to be used to minimize erosion:
<br />Stage the sal disturbing activities to minimize the amount of disturbed soil
<br />prior to stabilization. Disturbed areas will be considered stabilized when covered
<br />MN with materials such as onchored mulch, stoked sod, riprop, wood fiber blanket,
<br />or other materials that prevent erosion from occurring. Grass seeding alone
<br />will not be considered stabilization.
<br />General Construction Project Information
<br />Description of the construction activity (what will be built, generol timeline, etc.):
<br />Comforts of Flame is a FWE lot commercial and residential subdivision on o
<br />17.18 acre property. Lot 1 and Lot 2 ore residential Lot 1 being o
<br />condominium complex ono' Lot 2 consisting of to.nhornes. Lots 3, 4, and 5 ore
<br />commercial sites. Th. construction activities oil include grading operations for
<br />the construction of surface droinoge, sedimentation ponds, and on urban section
<br />street. Storm sewer construction, exposed soil stabilization. and bituminous
<br />paving .i/ follow grading operations.
<br />Description of soil types found at the project:
<br />According to sal borings token by o geolechnica/ engineering consultant. the
<br />majority of the 301l ore poorly graded.
<br />Z. General Site Information
<br />Description of the location and type of off temporary and permanent erosion
<br />prevention and sediment control BMP's to be used, including the timing for
<br />installation and procedures used to establish odditionol temporary BMP's as
<br />necessary:
<br />Contractor shall install and mointoin the temporary and permanent erosion
<br />prevention and sediment control BMP's as shown an the accompanying drawing
<br />and as described herein. The timing shall be in occordonce with the
<br />Construction Activity Sequence below and in accordance with sound and
<br />proactive construction scheduling and practices.
<br />Accompanying this SWPPP is o site plan that includes the following features:
<br />• Existing and proposed grades, including dividing lines and direction of flow for
<br />all pre- and post - construction stormwater runoff droinoge oreos located
<br />within the project limits.
<br />• Locations of impervious surfaces and sal types.
<br />• Locations of oreos not to be disturbed.
<br />• Location of areas of phased construction.
<br />• All surface waters and existing wetlonds within one -hall mile from the project
<br />boundaries that will receive slormwoter runoff from the site (identifiable on
<br />mops such as USCPS 7.5- minute quodrongle maps or equivalent). Where
<br />surface waters receiving runoff associated with construction activity will not fit
<br />on the plan sheet, they must be identified with on arrow. indicating both
<br />direction and distance to the surface water.
<br />• Method(s) to be used for linol slobilization of all exposed soil areas.
<br />Description of stormwater mitigation measures required as the result of on
<br />environmental, archaeological, or other required local, state, or federal review of
<br />the project:
<br />Not applicable to this project.
<br />Disturb only those areas where proposed contours and elevations ore shown to
<br />differ from the existing and where removals and other operations ore noted.
<br />Special oreos of the project site that ore not to be disturbed by construction
<br />activity are noted on the plan.
<br />Install wood fiber blanket where shown on the plan to provide temporary erosion
<br />protection.
<br />Description of temporary erosion protection or permanent cover to be used for
<br />exposed positive slopes within 200 lineal feet of o surface water (stream, lake,
<br />pond, marsh, wetland, reservoir, spring. river, storm water basin, storm water
<br />drainage system, waterways, water courses, and irrigation system whether
<br />surface water is natural or artificial, public or private with maximum time on
<br />exposed soil area con remain exposed when the oreo is not actively being
<br />worked:
<br />Provide year round stabilization to the above mentioned areas in accordance
<br />with the following table:
<br />Steepness of slope (H:V)
<br />Greater than 3:1
<br />3:1 through 10.1
<br />Less than 10:1
<br />Maximum Exposure
<br />Duration When Area
<br />Is Not Actively Worked
<br />7 Days
<br />14 Doys
<br />21 Doys
<br />Description of practices to be used to stabilize the normal wetted perimeter of
<br />drainage or diversion ditches within 200 lineal feet of the property edge or
<br />point of discharge to surface water within 24 hours of connecting the ditch
<br />to the surface water.
<br />Install seed, fertilizer, and disc- anchored mulch or temporary wood fiber blanket
<br />in ditches and soles within 24 hours of connecting the ditch or seek to the
<br />surface .afar .tare shown on the plan in accordance with the details.
<br />Description of other erosion prevention practices to be used:
<br />Install the specified energy dissipation method, such as riprop and geotexlile
<br />fabric, of pipe outlets within 24 hours of installation Permanently seed
<br />disturbed areas prior to end of seeding dotes specified by MnDOT.
<br />4. Sediment Control Practices
<br />Description of sediment control practices to be used to minimize sediments
<br />from entering surface waters, including curb and gutter systems and storm
<br />drain inlets:
<br />Permanent sediment control practices to be used on this project consist of
<br />sedimentation basins. Temporary sediment control practices to be used are sit
<br />fence, culvert inlet protection, storm sewer inlet protection, stone pod exits.
<br />ditch checks. and. if necessary. street s.ewping.
<br />5. Dewatering and Basin Draining
<br />If the project includes dewotering or basin draining, describe the BMP's to be
<br />used to prevent the discharge from adversely affecting the receiving waters and
<br />downstream londowners.
<br />Not opp6coble to this project.
<br />6. Additional BMP's for Special Waters and Discharges to
<br />Wetlands
<br />This project does not discharge stormwater directly to o Special Water. This
<br />directly project does not discharge stormwater d ec y to wetlands.
<br />7. Construction Activity Sequence
<br />In addition to performing and sequencing the tasks ossociofed with implementing
<br />this SWPPP as described herein and shown on the plan, the Contractor shall
<br />perform construction activities in accordance with the following sequence:
<br />(1) Install sill fence along properly line of project site where shown on plan
<br />and where property line is down gradient and within 100 feet of areas to
<br />have disturbed soil and where property line is within 20 feet of soil disturbing
<br />and other construction activities.
<br />(2) lnstoll sill fence along edge of wetlands and at other locations shown on
<br />the plop.
<br />(3) Install stone exit pads where shown on plan and of other locations where
<br />vehicles and equipment will leave the site onto paved and grovel surfaces.
<br />(4) Construct storm water ponds and related piping and control structures as
<br />shown on the project plans. Install and mointoin temporary erosion
<br />prevention measures as shown on the plan.
<br />(5) Install silt fence along bottom of storm water pond inslopes and where
<br />shown on the plan.
<br />(6) Complete earthwork activities. Install and mointoin sediment control
<br />measures such as ditch checks and stormwater inlet protection.
<br />(7) Complete utility construction. Install and mointoin sediment control
<br />measures such as inlet protection as work proceeds.
<br />(8) Remove silt deposits from site, remove silt deposits from stormwater basins.
<br />(9) Provide soil stabilization to disturbed oreos by preparing topsoil. seeding.
<br />fertilizing, mulching, anchoring mulch in accordance with plans and
<br />specifications.
<br />(10)Remove perimeter silt fence, other silt fence, check dams, and other
<br />sediment control measures upon
<br />achieving final stabilization and Owner submits the Notice of Termination.
<br />8. Inspections and Maintenance
<br />Description of procedures to be token to routinely inspect the construction site:
<br />Contractor shall inspect erosion prevention and sediment control BMP's to
<br />ensure integrity and effectiveness. Repair, replace. or supplement
<br />non - functional BMP's to provide continually functional BMP's. Contractor shall
<br />inspect the entire construction site o minimum of once every seven (7) cloys
<br />during active construction and within 24 hours after a rainfall event greater
<br />than 0.5 inches in 24 hours. Inspections shall include stabilized oreos. erosion
<br />prevention and sediment control BMP's, and infiltration areas. Specific tasks
<br />associated with the inspection and maintenance of the BMP's include the
<br />following:
<br />• Maintain and retain at the construction site written records of the inspections
<br />and maintenance performed. Records of each inspection and maintenance
<br />activity shall include: Date and time of inspection/maintenance activity; Nome
<br />of person(s) performing the activity, Finding of inspection; Recommended
<br />corrective actions; Corrective actions token; and Date and amount of roinfoll
<br />events greater than 0.5 inches in 24 hours.
<br />• Repair, replace, or supplement silt fences that become non - functional or
<br />accumulate sediment to the level of 1/3 the silt fence height or more within
<br />24 hours of discovery or as soon as conditions allow access.
<br />• Drain temporary and permanent sediment basins and remove sediment when
<br />the volume of sediment collected reaches 1/2 the permanent storage volume
<br />within 72 hours of discovery or as soon as conditions allow access.
<br />• Inspect surface waters, drainage ditches. and stormwater conveyance systems
<br />for evidence of sediment deposited by erosion. Remove deltas and deposited
<br />sediment and restabilize oreos where sediment removal results in exposed soil
<br />within seven (7) days of discovery unless precluded by legal, regulatory. or
<br />physical constraints. Removal and stabilization shall be completed within
<br />seven (7) days of obtaining access The NPDES/SDS permit holder is
<br />responsible for contacting the local, regional. state, and federal authorities
<br />and receiving the applicable permits prior to performing this work.
<br />• Inspect construction site vehicle exit locotions for evidence of sediment being
<br />track off -site onto paved surfaces. Remove tracked sediment from of -site
<br />paved surfaces within 24 hours of discovery.
<br />• Inspect perimeter or construction site. Remove off -site accumulations of
<br />sediment in o manner and at a frequency to minimize off -site impacts.
<br />9. Pollution Prevention Management Measures
<br />Contractor shall implement the following pollution prevention management
<br />measures on the site:
<br />• Solid Waste: Collect and properly dispose of sediment. asphalt and concrete
<br />millings, floating debris, paper, plastic. fabrics, construction and demolition
<br />debris. and other wastes in accordance with MPCA disposal requirements.
<br />• Hazardous Materials: Properly store, provide required secondary containment,
<br />and dispose of al products, fuels, point products, and other hazardous
<br />substances to prevent spills, leaks. and other discharges in accordance with
<br />MPCA regulotions. Provide restricted access storage areas to prevent
<br />unauthorized access and vandalism.
<br />• Equipment Washing: Restrict external washing of trucks and other
<br />construction equipment to a defined oreo of site. Contoin runoff and
<br />properly dispose of waste. Engine degreasing is prohibited on the property.
<br />• Spill Prevention: Pork construction equipment and store potentially hazardous
<br />materials in a designated area located as for as practicable from potential
<br />environmentally sensitive oreos. Construct impoundment dike and take other
<br />measures required to contoin spilled material. Remove and dispose of
<br />contaminated soil. vegetation, and other materials and perform other
<br />mitigation measures as required in accordance with MPCA regulotions.
<br />• Sanitary and Septic Waste: Provide and maintain temporary facilities in
<br />accordance with MPCA and Minnesota Deportment of Health regulations.
<br />10. Final Stabilisation
<br />Contractor shall achieve lino/ stabilization of the construction site by achieving
<br />the following:
<br />• Soil disturbing activities hove been completed and soils ore stabilized by o
<br />uniform perennial vegetative cover with o density of 70 percent over the
<br />entire pervious surface oreo or other equivolent means to prevent soil failure
<br />under erosive conditions.
<br />• Temporary synthetic and structural erosion prevention and sediment control
<br />BMP's are removed.
<br />• Sediment is removed from permanent sedimentation basins to return bosins to
<br />the design capacity. removed from stormwater conveyance systems, and is
<br />stabilized or removed from the site.
<br />11. Notice of Termination
<br />Contractor shall notify Owner immediately upon achieving Final Stabilization.
<br />Owner must submit the Notice of Termination within 30 days after Final
<br />Stobilizotion or within 30 days of another owner assuming control according to
<br />Port 17.8.5. over all areas of the site that hove not undergone Final Stabilization.