Laserfiche WebLink
Plat Details: <br />Gross Area <br />3.79 acres <br />Right of Way <br />.32 acres <br />Net Area <br />3.47 acres <br />The proposed lots meet all of the requirements for area and street frontage for the GB (General Business) <br />zoning district as set forth in the Zoning Ordinance. <br />Easements are correctly depicted on the Preliminary Plat for the typical property boundaries and for the sewer <br />and water mains, but Drainage and Utility easements need to cover all drainage ponds prior to the approval of <br />the final plat. Joint Access easements also need to cover the driveway shared by both lots. <br />Additionally, the final plat will need to reflect the Right of Way #3 plat done for the City's Lake Drive /Town <br />Center improvement project, and clearly grant right of access to Anoka County along the Lake Drive street <br />frontage. <br />CONDITIONAL USES <br />Existing Facility: <br />• <br />• <br />The existing Conditional Use Permit allowing fuel sales on the site needs to be modified slightly to allow the <br />facility to properly operate in conjunction with the Lake Drive /Town Center Parkway improvement project, and <br />also to allow for the installation of two additional gasoline pumps. <br />The Lake Drive reconstruction will require the existing pylon sign to be relocated as shown on the plans. Upon <br />completion of the improvements the City and County have worked out an arrangement for one of the existing <br />drives on Lake Drive to be closed immediately and the other to be closed within specific timeframe. These <br />types of site changes also affect the existing Conditional Use Permit and will be clearly outlined in the <br />conditions of approval and subsequent resolution. <br />The Town Center Parkway construction project will provide access to the south side of the site and will require <br />the removal of some curbing and parking area to allow proper circulation. The site will still provide 17 parking <br />spaces which is adequate for the existing facility. <br />The Lino Lakes City Council approved an amendment to the Conditional Use Permit for a gas station at 7509 <br />Lake Drive on September 27, 1999. This amendment was to allow the two additional pumps that were installed <br />prior to city approval, to be turned on for use by the station. The following conditions were part of the 1999 <br />approval: <br />Holiday Lot (Lot 1) <br />Lot 2 <br />Lot Area <br />92,679 sf <br />59,587 sf <br />Pervious Area <br />40,700 sf <br />44% <br />30,639 sf <br />51% <br />Impervious Area <br />51,979 sf <br />56% <br />28,948 sf <br />49% <br />Building Area <br />5,543 sf <br />6,500 sf <br />The proposed lots meet all of the requirements for area and street frontage for the GB (General Business) <br />zoning district as set forth in the Zoning Ordinance. <br />Easements are correctly depicted on the Preliminary Plat for the typical property boundaries and for the sewer <br />and water mains, but Drainage and Utility easements need to cover all drainage ponds prior to the approval of <br />the final plat. Joint Access easements also need to cover the driveway shared by both lots. <br />Additionally, the final plat will need to reflect the Right of Way #3 plat done for the City's Lake Drive /Town <br />Center improvement project, and clearly grant right of access to Anoka County along the Lake Drive street <br />frontage. <br />CONDITIONAL USES <br />Existing Facility: <br />• <br />• <br />The existing Conditional Use Permit allowing fuel sales on the site needs to be modified slightly to allow the <br />facility to properly operate in conjunction with the Lake Drive /Town Center Parkway improvement project, and <br />also to allow for the installation of two additional gasoline pumps. <br />The Lake Drive reconstruction will require the existing pylon sign to be relocated as shown on the plans. Upon <br />completion of the improvements the City and County have worked out an arrangement for one of the existing <br />drives on Lake Drive to be closed immediately and the other to be closed within specific timeframe. These <br />types of site changes also affect the existing Conditional Use Permit and will be clearly outlined in the <br />conditions of approval and subsequent resolution. <br />The Town Center Parkway construction project will provide access to the south side of the site and will require <br />the removal of some curbing and parking area to allow proper circulation. The site will still provide 17 parking <br />spaces which is adequate for the existing facility. <br />The Lino Lakes City Council approved an amendment to the Conditional Use Permit for a gas station at 7509 <br />Lake Drive on September 27, 1999. This amendment was to allow the two additional pumps that were installed <br />prior to city approval, to be turned on for use by the station. The following conditions were part of the 1999 <br />approval: <br />