My WebLink
|
Help
|
About
|
Sign Out
Home
Search
02/14/2007 P&Z Packet
LinoLakes
>
Advisory Boards & Commissions
>
Planning & Zoning Board
>
Packets
>
2007
>
02/14/2007 P&Z Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/2/2014 11:06:10 AM
Creation date
7/1/2014 1:03:31 PM
Metadata
Fields
Template:
P&Z
P&Z Document Type
P&Z Packet
Meeting Date
02/14/2007
P&Z Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
136
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
II)Building Elevations <br />The building materials used for the proposed structures include a base of rock faced CMU, brick covering of the <br />canopy supports and building face, and EIFS finish for the canopy facade /top and building accents. All of these <br />materials conform to the requirements of the zoning ordinance. <br />Building Height <br />According to the Zoning Ordinance, no building within the GB (General Business) zoning district may exceed <br />45 feet in height. At a maximum height of approximately 20 feet, 10 inches in height, the proposed motor fuel <br />station and car wash complies with the ordinance. <br />Landscaping <br />The landscaping plan is conforming to the minimum requirements of the Zoning Ordinance; however, staff <br />would recommend that the applicant provide a hedge row along the south end of the southern parking area to <br />limit the overflow of vehicle headlights onto Town Center Parkway and to improve the livability of the existing <br />residential property on the south side of Town Center Parkway. <br />Green Area <br />The GB (General Business) zoning district requires that impervious surface coverage not exceed 75 %. Plans <br />currently show the Holiday Store with an impervious surface coverage of 56% and the outlot with an <br />impervious surface coverage of 49 %, both within the limitations of the district. <br />Access /Circulation <br />Access to the site is currently provided via two exit/entry drives directly from Lake Drive on the east side of the <br />site. The Lake Drive and Town Center Parkway improvement project will create two exit/entry drives on the <br />south side of the site via Town Center Parkway and will immediately close the southern drive on Lake Drive. <br />The northern exit /entry drive from Lake Drive will remain for two years from the completion of the Town <br />Center Parkway improvements. It will function only as a right in only to limit traffic conflict points. This <br />access is for the existing facility and will cease upon the end of the two year time limit or the construction of a <br />new facility, whichever occurs first. This access plan will provide the safest access to and from the site and the <br />internal circulation will work well with the proposed layout. <br />Pedestrian Circulation <br />Sidewalks are provided on three sides of the principal building and provide appropriate access to the building <br />from the main parking area. The width of the sidewalks (6 feet) will likely prohibit the display of merchandise <br />in front of the building because of the need to provide full accessibility. A condition of approval is attached to <br />prohibit the outdoor display of merchandise. <br />• <br />
The URL can be used to link to this page
Your browser does not support the video tag.