My WebLink
|
Help
|
About
|
Sign Out
Home
Search
04/11/2007 P&Z Packet
LinoLakes
>
Advisory Boards & Commissions
>
Planning & Zoning Board
>
Packets
>
2007
>
04/11/2007 P&Z Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/2/2014 3:25:55 PM
Creation date
7/2/2014 9:17:27 AM
Metadata
Fields
Template:
P&Z
P&Z Document Type
P&Z Packet
Meeting Date
04/11/2007
P&Z Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
46
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br />Molin Amendment <br />Page 3 of 3 <br />RECOMMENDATION <br />Staff recommends approval subject to the following conditions: <br />1. Issues discussed in the City Engineer review memo must be addressed to his satisfaction. <br />2. All conditions of the previous amendments shall continue to apply. <br />3. A Performance Agreement between the applicant and city must be executed prior to the <br />issuance of building permits for the site. <br />4. A photometric lighting plan in conformance with the standards of the zoning code must <br />be submitted prior to the issuance of building permits. All lighting fixtures will be <br />downcast shielded as required by the zoning code. <br />5. Trash enclosures must incorporate the same materials used in the construction of the <br />main building. <br />6. The applicant shall have the proposal reviewed by the Rice Creek Watershed District, and <br />if necessary obtain a permit from them. <br />7. The improvements are limited to those areas depicted on the `Partial Site Plan', sheet <br />A1.1 as submitted on March 12, 2007. The wetland enhancement, mitigation, and <br />replacement depicted on the Grading Plan (sheet C1) require separate approval prior to <br />any construction. <br />8. The Grading Plan (sheet C1) shall be revised to depict only the improvements proposed <br />to coincide with the office building. <br />This review is based on the following plans and information: <br />1. City Engineer Comments dated April 3, 2007 <br />2. Molin Plan Set received March 12, 2007 <br />
The URL can be used to link to this page
Your browser does not support the video tag.