My WebLink
|
Help
|
About
|
Sign Out
Home
Search
05/09/2007 P&Z Packet
LinoLakes
>
Advisory Boards & Commissions
>
Planning & Zoning Board
>
Packets
>
2007
>
05/09/2007 P&Z Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/2/2014 3:18:18 PM
Creation date
7/2/2014 9:53:41 AM
Metadata
Fields
Template:
P&Z
P&Z Document Type
P&Z Packet
Meeting Date
05/09/2007
P&Z Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
46
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
z <br />0 0 <br />0 0 <br />0 <br />of <br />< <br />� E <br />z <br />N <br />C <br />7 <br />0 <br />N7 <br />0 <br />0° <br />J54 <br />r.14 <br />121H AVENUE <br />12111 AVENUE <br />-Be' <br />1 <br />m <br />Y3NY 03000M <br />ti <br />`S� <br />SILT FENCE(TYP.) 1 <br />533�i'30fl 499- — <br />• <br />—, <br />j I <br />4 <br />4SpH BHi�\ 2„. <br />1 <br />41, L —� \f —Ras- <br />4 _ � 4 - <br />EBBS_ •_ X664— — - , <br />4 ae4 — — eB4— — 4 <br />4 4 <br />#Z ON 10110 A1Nf1OJT . <br />1 iI <br />1 � <br />\ \ ( <br />DIEM DAWN '&IP:r <br />4 - ----------- \ s <br />�� <br />4 '..- - <br />4 <br />4 4 �Z 4� <br />4 <br />( 4 4 4—se / <br />4 91 \4 <br />\ 4 I I 4 <br />4 <br />EXIIIBIT B <br />ACREAGE SUMMARY <br />in ACRES <br />T PASEt5E.NT AREA <br />Su::Ji%EL• APIA <br />0.00 AC <br />0.75 AC <br />AREA <br />TOTAL DISTUR.4ED <br />6.75 AC <br />7.0 AC <br />DEVELOPER /0YYNEft <br />ALVN LAMOTIE <br />6497 12TH AVE 5 <br />LINO LADS. MINNESOTA 55014 <br />ErIE OPERATOR /CONTRACTOR /GENERAL CONTRACTOR <br />SUPERINTENNDENT: <br />SEQUENCE OF CONSTRUC11ON <br />PHASE I: <br />1. INSTALL STAB/LOD CONSTRUCTION ENTRANCES <br />1 PREPARE TDA.O ART PAPHR G ND STORAGE ATE/. <br />1 CPISTRUCT THE AT FENCES ON 110 SITE <br />4. CONSTRUCT THE S DAENTATDN ND SEDIMENT TRAP BASINS <br />S HALT ALL ACTIVITIES AND CONTACT THE CNWL ENGNEEFTNG CONSULTANT <br />11) PERFIAY INSPECTION Cr EIMPs. GENERAL CONTRACTOR SHALL <br />SCHEDULE AND CONDUCT STORM WATER PRE-CONSTRUCTER( METING NTH <br />ENGINEER AND ALL GROUND DISTURBING COI1RACTOS BFFOE <br />PROCEEDING NTH CONSTRUCTION. <br />6 (YEAR AND GRUB THE 9E <br />7. BEGIN GRADING THE SITE <br />PHASE R <br />1. TEMPO AR4.Y AID DENUDED AREAS <br />Z INSTALL UTIUTI S• UNDERDRAINS, STDRN )'HERS, MOBS AND OTTERS <br />1 (DIIPLEIE GRADING AND INSTALL PERMANENT SEEDING AND PLANING <br />4 REMOVE ALL 1EAPORAR1 EROSION AND SEDIMENT CONTROL DEUCES <br />(ONLY F SITES STABILIZED). F REOUIND BT THE CONTRACT <br />/ <br />/ <br />/ / I <br />SILT F NCE(TYP.) / 1 <br />/ / <br />r= / / <br />• <br />I <br />4 <br />DNISS0210 <br />�> <br />/ <br />I(-> <br />I\ IJ I, <br />/ <br />_��_ yam_ / �?1 <br />S213dcl <br />i 7 <br />• <br />SPOT 0.EVATON <br />CONTOUR <br />RIP RAP <br />CURE & GUTTER <br />STORM SEWER •--- -1 : <br />SANITARY SEV O <br />ER 0 0 <br />FORLEMAN (SAN.) <br />WATERMAN '' <br />LEGEND <br />PROPOSED <br />x 9625 <br />DOSING <br />,TAs2.s <br />EASEMENT <br />OVETFLOW ELEV. <br />RETAINING WALL <br />SILT FENCE <br />SC& BORINGS <br />DITMION OF <br />OVERLAID FLOW <br />TEMPORARY <br />DIVERSION DITCH <br />CHEW DAY <br />TEMPORARY STOLE <br />CONSTRUCTION ENTRANCE <br />TEMPORARY SEDIMENT BASIN <br />EOF <br />TEMPORARY STORAGE AND PARKING <br />AREA <br />SOIL EROSION /SEDIMENTA11ON CONTROL OPERATION TIME SCHEDULE <br />NOTE CONTRACTOR OR GENERAL CONTRACTOR TO COMPLETE TABLE WITH THEIR SPECIFIC PRO.ECT SCHEDULE <br />CONSTRUCTION SEDUDICE <br />JAIL FEB MAR APR MAY MN JUL AUG SfP OCT NOV DEC JAN FEB MAR APR MAY JUN <br />1ETIPORARY CONTROL MEASURES <br />S71NP & STOCKPILE TOPSOIL <br />ROUEN GRADE / SFDOENT CONTROL <br />TEMPORARY CONSTRUCTION ROADS <br />FOUNDATION / BUILDING CONSTRUCTION <br />SITE COI61RIJC ION <br />PERMANENT CONTROL STRUCTURES <br />FINISH GRADING <br />LANDSCAPING/SEED/FINAL STABIIIATIOPI <br />STORM FAG.ITES <br />REFER TO SHEET C.5.03 FOR GENERAL NOTES, <br />MAINTENANCE NOTES, LOCATION MAPS, AND <br />STANDARD DETAILS <br />$ ST -9 • PA -10 <br />APR 0 9 20D7 <br />0 100 <br />SCALE IN FEET <br />200 <br />PHASE II EROSION & SEDIMENT CONTROL P <br />SHEET NUR <br />C— 5.02 <br />REV. <br />LIRA FIE # 1517Z <br />
The URL can be used to link to this page
Your browser does not support the video tag.