Laserfiche WebLink
• <br />• <br />• <br />Molin Amendment <br />Page 2 of 3 <br />ANALYSIS <br />Comprehensive Plan, Land Use and Zoning: <br />The table below identifies the existing land use and zoning as well as guided land uses for the <br />area. <br />Location <br />Existing Land Use <br />Guided Land Use <br />Existing Zoning <br />Site <br />Industrial <br />Industrial <br />LI (Light Industrial) <br />GI (General Industrial) <br />North <br />Single Family Dwellings <br />Low Density Residential <br />R (Rural) <br />South <br />Industrial <br />Industrial <br />GI (General Industrial) <br />East <br />Single Family Dwellings <br />Industrial <br />Commercial <br />Low Density Residential <br />R (Rural) <br />West <br />Single Family Dwellings <br />Low Density Residential <br />R (Rural) <br />R -1 (Single Family Residential) <br />SITE PLAN <br />Buildings: Site plans have been submitted for the proposal. The office building will occupy the <br />space between the existing office building and the existing maintenance building. It will be <br />single story with a trellis attaching the new office building to the existing to create a cohesive <br />appearance to the site. The building materials meet all of the city requirements and the design <br />appropriately addresses the base /middle /top approach required by the zoning ordinance. <br />Lighting: The lighting attached to the building will be required to meet all city standards for <br />downcast, shielded lighting. A lighting plan will be required prior to the issuance of building <br />permits that will confirm compliance. <br />Grading/Drainage, Utilities: A grading and utility plan was submitted with this application, <br />and was thoroughly reviewed by the City Engineer. A memorandum is attached to this report <br />that outlines all of the City Engineer's comments. The applicant has also submitted their plans to <br />the Rice Creek Watershed District for review and will be required to obtain any necessary <br />permits. <br />The wetland mitigation and enhancement proposed on the site plan is not meant to be a part of <br />this request. It was shown on the plans by the applicant to depict the ultimate plans for the site. <br />A condition of approval clearly indicates that Phase Two will require a separate conditional use <br />permit amendment most likely to coincide with the expansion of the manufacturing building. <br />Landscaping: With each addition to the site the largest concern has been the exterior <br />landscaping on the site, which continually is inspected by city staff for compliance. The City <br />Forester visited the site on April 5, 2007 and met with the applicant to address any landscaping <br />concerns that existed. This office building proposal will require some changes to the <br />landscaping plan to account for some building plantings, but no major changes to the exterior <br />landscaping plan are being proposed. <br />