GRANDVIEW
<br />TORM WATER POLLUTION
<br />PREVENTION
<br />PLAN [SWPPP)
<br />City of Lino Lakes, Minnesota
<br />GENERAL EROSION AND SEDIMENT CONTROL
<br />INSPECTIONS AND MAINTENANCE
<br />1. The Permittee(s) (either the owner or operator) must routinely inspect the
<br />construction site once every seven (7) days during active construction and within
<br />24 hours after a rainfall event greater than 0.5 inches in 24 hours
<br />2 AB nspeotlons and mantenana conducted dying conelroction must be recorded in
<br />writing and these records must be retained with the SWPPP in accordance with
<br />RECORD DETENTION. Records of each Inspection and maintenance activity shag
<br />Inducts shag include
<br />o. Dote and time inspections;
<br />b. Nara of perscn(e) conducting ins ection8
<br />e Findings of inspections, including recommendations for corrective aetbno
<br />d Corrective actions taken (bdudhg dates, times, and party completing
<br />maintenance activities);
<br />a. Data and amount of rainfall events greater than 1/2 inch (OS inches)
<br />h 24 hours, and
<br />C Documentation of changes mode to the SWPPP.
<br />3. Where pats of the ronetruetlon site hove undergone find Mobilization, but work
<br />remain an other parts of the site, inspections of the stabilized areas may be
<br />reduced to once per month. Where work has been suspended due to frozen ground
<br />conditions. the required Inspections and mohtenanee must take place as soon as
<br />runoff occurs at the site or prier to resuming constructwo whichever comas first
<br />4. Al erosion prevention and sediment control BUN must be inspected to ensure
<br />Integrity and effectiveness Ad nonfunctional BMPe must be repaired. replaced, or
<br />supplemented with functional BAPS The Pernitee(s) must investigate and comply
<br />with the following inspection and maintenance requirements:
<br />e All silt fences must be repaired. replaced or supplemented when they became
<br />nanfanatknd (develop tears, detach from poste, post become dislodged from
<br />ground et.) or the sediment reaches 1/3 of the height of the fence. These
<br />repairs must be made within 24 hours of discovery, or as soon as the field
<br />conditions allow access
<br />b. Temporary and permanent sedimentation ponds must be trained and the sedanent
<br />removed when the depth of the sediment collected in the bash reoehee 1/2 the
<br />storage volume. Drainage and removal must be completed within 72 hours of
<br />discovery ar as soon as field conditions allow access
<br />c Surface waters, Including drainage ditches and conveyance systems, must be
<br />inspected for evidence of sediment being deposited by erosion. The Pennitee(s)
<br />must remove al deltas and sediment deposited h aurfoce waters, Including
<br />drainage ways catch basin, and other drainage systems, and restobetre the areas
<br />where sediment removal resutb in exposed sol. The removal and stabilization must
<br />take place within seven (7) days of discovery unless preluded by legal, regulatory,
<br />or phydcd occew constraints The Permltee shag use all reasonable efforts to
<br />obtain access If preluded removed and stabilization must take plane within seven
<br />(7) calendar days of obtaining access The Parader, is responsible for contacting
<br />ore local, regional state and federal outhorttiea and receiving any applkubie permits,
<br />prior to conducting any work
<br />d Construction site vehice exit locations must be Inspected for evidence off-site
<br />sediment troddng onto paved surfooes Tracked sediment must be removed from
<br />all off -site paved surfaces, within 24 hours of discovery, or H applcoble, within a
<br />snorter time.
<br />e The Pemdttee(s) are responsible for operation and maintenance of temporary
<br />and permanent water crudity management BLIPS, as well as dl crown prevention
<br />and sediment control BLIPS, for the duration of the construction work at the site.
<br />The Permittee(e) ore responsbe until another Pernitee has assumed control over
<br />areas of the site that have not been finally stabilized or the site has undergone
<br />find stab9lzatian, and a Notice of Termination hen been submitted to the MPCA
<br />(see TERMINATION OF COVERAGE).
<br />• If sediment escapes the construction she. off -site occumubtioas must be removed
<br />in a manner and at o frequency sufficient to minimize off -she impacts (e.g.,
<br />fugitive sediment In streets could be washed into storm ers by the next ran
<br />and /or pose a safety hazard to users of pundit streets).
<br />5. Ad nfdtratbn areas must be inspected to ensure that no sediment from ongoing
<br />construction activities is reaching the bfdtratbn area and these areas are
<br />protected from compaction due to construction equipment driving across the
<br />infiltration area
<br />POLLUTION PREVENTION MANAGEMENT MEASURES
<br />The Permitee(s) shall implement the following pollution prevention management
<br />Measures on the site
<br />1. Solid Waste Collected sediment, asphalt and concrete M9lingc, floating debris,
<br />paper, plastic, fabric, construction and demolition debris and other wastes must be
<br />disposed of properly and must amply with MPCA disposal requirements.
<br />2 Hazardous Materioe OR, gasoline, point and any hazardous eubetonoes must be
<br />properly stored Including secondary cantonment to prevent spill. leaks or other
<br />discharge. Restricted access to storage areas must be provided to prevent
<br />vandalism. Storage and disposal of hazardous waste Must be in coos:ien. with
<br />MPCA regulations.
<br />3. External washing of fracas and other construction vehicle must be Invited to 0
<br />defined area of the site. Runoff must be contained and walls properly disposed
<br />of. No engine degreasing s allowed on site.
<br />DEWATERING AND BASIN DRAINING
<br />1• Dewotering or basin droning (.g.. pumped discharges trench/ditch cuts to
<br />drainage) related to the construction activity that may have turbid or sediment
<br />laden discharge water must be discharged to a temporary or permanent
<br />eedbnentotion born on the project site wherever possible. If the water cannot be
<br />discharged too sedimentation basin prior to entering the surface water, It must
<br />treated with the appropriate 91P, such that the discharge does not adveroely
<br />affect the receiving water or 400natreom landowner. The Permittee(s) must
<br />ensure that discharge points ono adequately protected from erosion and scour.
<br />The discharge must be dispersed over natural rock rlprrp, sand bogs plastic
<br />sheeting or other accepted energy dissipation measure. Adequate odbnental'an
<br />control measarrs are required for disaarge water that contains suspended solids.
<br />2 Al water from dewatering or basin draining octfvitiw must be discharged in a
<br />manner that does not cause nuisance condition, erosion in reserving channels or
<br />on downsiope properties, a inundation in wetlands causing aignlflcont adverse
<br />Impact to the wetland
<br />AMENDMENTS 7D SMPPP
<br />The Permittee(s) must amend the SWPPP as necessary to include addtiond
<br />requirements, such as additional or modified BLIPS. designed to correct problems
<br />identified or address situations whenever:
<br />L There is a change In design.. construction, operotlon, maintenance, weather or
<br />season conditions that has a significant effect on the discharge of pollutants to
<br />surface waters or underground waters;
<br />2 Inspection or investigations by site operators, local. state or federal officials
<br />nd¢ate the SWPPP is not effective in eliminating or significantly minimizing the
<br />discharge of pollutants to surface waters or underground waters or that the
<br />discharges are causing water quality standard exceedances, or
<br />3. The SWPPP is not achieving the general objectives of controlling pdWtonts in storm
<br />water mscharges associated with construction activity, or the SWPPP is not
<br />consistent with the term. and conditions of this permit
<br />4. At ony time after permit coverage a effective, the MPCA may determine that the
<br />project's storm water discharges may cause, have reasonable potential to cause, or
<br />contribute to non - attainment of any applicable water quality standard. N MPCA
<br />makes such a determination, the MPCA will notify the Permittee(s) In writing. In
<br />response, the Permittee(s) must develop a supplemented BNP notion plan or
<br />appropriate SIAPPP amendments describing SWPPP modifications to address the
<br />Identified concerns and submit information requested by the MPC#, which may
<br />Malude an Individual permit application. If MPCA's written notification regohoo a
<br />response, blurs to respond within the specified tlmefrome constitutes a permit
<br />violation
<br />FINAL STABILIZATION
<br />The Permltee(s) must ensure final stablizotlon of the site. The Permttee(s) must
<br />submit a Notice of Termination within 30 days after find stabNzatton is complete,
<br />or another owner/operator (Pennittee) has assumed control ova al areas of the
<br />site that have not undergone find stabilization. Find stabilization can be achieved
<br />in one of the following ways
<br />1. AU sod disturbing at the site have been completed and all soils must be stabgized
<br />by a uniform perennial vegetative cover with a density of 70 percent over the
<br />entire previous surface area, or other equtvaint means necessary to prevent soil
<br />feriae under erosive .eonditidne and;
<br />e All dronoge ditches, constructed to drain water from the she after construction is
<br />complete. must be stabilized to preclude erosion;
<br />b. Ail temporary synthetic, and structural erosion prevention and sediment control
<br />Best Management Plow (such as sat fence) must be removed as part of the site
<br />fad Mobilization and -
<br />e The Permhee(s) must dean out all sediment from conveyances and from
<br />temporary sedimentation basins that are to be used as permanent water quality
<br />mancgement basins Sediment must be stabilized to prevent R from being worried
<br />back into the basin, conveyance and drainage ways discharging off-she or to
<br />surface waters The dean out of permanent bastes must be sufficient to return
<br />the basin to design capacity.
<br />2 For resident. construction only, fad stabilization has been achieved when
<br />temporary erosion protection and duo gradient perimeter control for individual lots
<br />has been completed and the residence hen been transferred to the homeowner.
<br />Additionally, the Permitee must distribute the APOA 'homeowner fact sheet' to the
<br />homeowner to inform the homeowner of the need for, and benefits of foal
<br />stabilization.
<br />RECORD DETENTION .
<br />The SWPPP, al changes to ft, and inspections and mantenonce records must be
<br />kept at the site during construction by the Perrnitee who has operational control
<br />of that potion of the sit. The SWPPP can be kept In either the field office of in
<br />an on-site vehicle.
<br />All owners) must keep the SWPPP, along with the following additional records, on
<br />Re for three (3) years after submitted of the NOT as outlined in TERMINATION 00
<br />COVERAGE. This does not Include any records after submitted of the NOT.
<br />1. My other permits required for the project
<br />2. Records d ail Inspection end mdntenance conducted during construction
<br />3. AI permanent operation and maintenance agreements that have been implemented,
<br />including a1 right of way, contracts, eovenonte, and other binding requirements
<br />regarding perpetual maktenenee and
<br />4. AD required cdo,lotlons for design of the temporary and permanent storm water
<br />management system.
<br />TERMINATION OF COVERAGE
<br />1.
<br />Permittee(s) wishing to terminate coverage under this permit must submit o Notice
<br />of lamination (NOT) to the 11PCA. Compliance with the permit is required until a
<br />NOT is submitted. The Permittee(s) authorization to discharge under this permit
<br />terminates of midnight of the day the NOT is signed
<br />2. Al Permittee(s) must eubmlt o NOT within thirty (30) days after one or more of
<br />the fo1Owing conditions have been met
<br />a. Final Stabilization has been achieved on all portions of the site for which the
<br />Permltee is responsible (naludmg the removal of ad temporary erosion control
<br />measures such as set fence, end N applicable, returning agricultural land to its pre
<br />construction agricultural use): -
<br />b. Mother owner/ operator (Pamlico) has assumed control aging to Part IL8.5 of
<br />MPCA Permit No. MN R100001 over all areas of the site that haw not been finally
<br />stabeaeet or
<br />• For residential construction only. temporary erosion protection and down gradient
<br />perimeter control for ndmidud lots has been completed and the residence has
<br />been transferred to the homeowner. Additionally, the PermRw must distribute the
<br />MPCA's 'homeowner foctshcet' to the homeowner to inform the homeowner of the
<br />need for, and beraflts of, find stab0aotnn.
<br />SiTE SPECIFIC EROSION AND SEDIMENT CONTROL
<br />81E 0133CRPRON
<br />A) P801007 NAM . GRANDVIEW
<br />6) PROJECT I OCATION: Between the dead ends of Stagecoach Trail behind Gethsenwny Church.
<br />C) PROJECT DESCRIPTION:
<br />This project wW consist of the construction of seven single -family homes and a public
<br />street
<br />Most hard surface nn-off is routed to a pre - treatment basin, which is to be dried to
<br />prevent water infiltration. The bass 030 overflow to a bb- titration bosin whidi has an
<br />underdran and a controlled outlet
<br />Sod disturbing activities cam Include Installation of a rock construction entrance
<br />Installation of slit rote where surface nn-off leaven site she graehp, to include the
<br />Import of materiel and export of unsuitable sods watermoik sanitary sewer, and storm
<br />sewer installation: building construction including foundation eocmatio n; parking lot and
<br />roadway construction; and preparation for turf restoration.
<br />E) PErrCENTACE HARD SURFACE 23
<br />F) 517E ARFAS
<br />0) TOTAL m_ lR8ED AREA: 4.35 ACRES
<br />H)
<br />It ' 1 •,10. w . . . _ . . • .P a: . . . .0 0 . 1 ! ! • , . .
<br />• Prior to any grodng operations, the contractor shall instal a rock canstruatlon
<br />entrance and perimeter silt fence as shown on plan. (Contact City and /or County
<br />to inspect erosion control measures prior to groding operation. If nemsoy.)
<br />Additional set fence may be necessary N load conditions require.
<br />• Provide "kn. (or approved spud) for ad erieting storm sewer Web that w91 receive
<br />run-off during site construction. Provide inlet protection fa. on proposed storm
<br />4ewer inlets within 24 hours of structure hstalbtbn. Wet protection to renwln
<br />h -pace anbl site hen been etab9aed.
<br />• Remove topsoil from site and place in temporary stockpile location (as determined
<br />by Owner). Seed stockpile with temporary seed mix and mulch with weed -free straw
<br />if stockpile is to remain in place far more than t me (3) doge
<br />• Perform site grading on an areo- by-oreo - boss to minimize uncompleted areas As
<br />each area is completed, all exposed soils must hove temporary erosion control
<br />protection cc permanent cover according to the following time table
<br />TYPE OF SLOPE
<br />Steeper than 3:1
<br />7 days
<br />10:1 to 3:1
<br />14 days
<br />Flatter than 10:1
<br />21 days
<br />(. Madmen time on even can
<br />remain open when tin area is
<br />not =Wady being worked.)
<br />Ad sod seed mulch and fertilizer shed conform with the following MnDOT
<br />specifications as modified below.
<br />118E
<br />BEFORE
<br />CONslROCRON
<br />CONS1FRUUCC110N
<br />TOTAL ACE AREA
<br />3.29 ACRES
<br />TOTAL ESTIMATED IMPERVIOUS
<br />0 ACRES
<br />0.89 ACRES
<br />TOTAL ESTIMATED PERVIOUS
<br />3.29 ACRES
<br />240 ACRES
<br />0) TOTAL m_ lR8ED AREA: 4.35 ACRES
<br />H)
<br />It ' 1 •,10. w . . . _ . . • .P a: . . . .0 0 . 1 ! ! • , . .
<br />• Prior to any grodng operations, the contractor shall instal a rock canstruatlon
<br />entrance and perimeter silt fence as shown on plan. (Contact City and /or County
<br />to inspect erosion control measures prior to groding operation. If nemsoy.)
<br />Additional set fence may be necessary N load conditions require.
<br />• Provide "kn. (or approved spud) for ad erieting storm sewer Web that w91 receive
<br />run-off during site construction. Provide inlet protection fa. on proposed storm
<br />4ewer inlets within 24 hours of structure hstalbtbn. Wet protection to renwln
<br />h -pace anbl site hen been etab9aed.
<br />• Remove topsoil from site and place in temporary stockpile location (as determined
<br />by Owner). Seed stockpile with temporary seed mix and mulch with weed -free straw
<br />if stockpile is to remain in place far more than t me (3) doge
<br />• Perform site grading on an areo- by-oreo - boss to minimize uncompleted areas As
<br />each area is completed, all exposed soils must hove temporary erosion control
<br />protection cc permanent cover according to the following time table
<br />TYPE OF SLOPE
<br />Steeper than 3:1
<br />7 days
<br />10:1 to 3:1
<br />14 days
<br />Flatter than 10:1
<br />21 days
<br />(. Madmen time on even can
<br />remain open when tin area is
<br />not =Wady being worked.)
<br />Ad sod seed mulch and fertilizer shed conform with the following MnDOT
<br />specifications as modified below.
<br />118E
<br />MOOT SPECIFICATION/NOTES
<br />Sod
<br />3878
<br />Seed
<br />3876
<br />o For pending areas (above NWL)
<br />MnDOT Mixture 350 (at 84 Ws /sae)
<br />• For turf establishment
<br />MOOT Mixture 280 (100 Ibis /sae)
<br />MnDOT Ifahae 270 (120 Iles /acre)
<br />Temporary Fad cover
<br />Strong /summer
<br />1 -2 yeas cover
<br />2 -5 yeas cover
<br />MnDOT Mbdure 1008 (100 lbs /sae)
<br />MnDOT Mixture 110 (at 100 ibis /Done)
<br />MnDOT Mature 150 (at 40 Ibis /ace) .
<br />MnDOT Mixture 190 (at 60 Ibis /acre)
<br />° For biro- fltrotian bosh
<br />110007 Mixture 328 (at 88 its/acre)
<br />Mulch
<br />3882 (Type 1 - Disc Anchored)
<br />Fertilizer -
<br />3881
<br />Wood Fiber Blanket 3885 (Category 2)
<br />00 To reduce weed establishment. mow 2 to 3 tirnes (30 days Wart)
<br />during the let year with the mower deck about 6" - r off the ground.
<br />Mow one time during the 2nd yea before weeds set thek seeds Bum or
<br />mow once every 3-5 years following the initial 2 yeah of maintenance to
<br />remove dead plant material and stimulate mw seed
<br />• Mow a minimum of once per 2 weeks
<br />The oantraatnr shag Pay special attention to al adjacent property lines and make
<br />sure the erosion control practices haloes in those areas prevent migration of
<br />sediment onto adjacent properties
<br />If any slopes appear to be fading. additional sat fence. biorons and erosion control
<br />blanket shall be added as needed
<br />The contractor shag maintain and rep. as set fence (Inciudn9 the removd of
<br />accumulated sediment) until vegetation is established and the site is stabilized (see
<br />also INSPECTIONS AND MAINTENANCE).
<br />• - Provide 11p -rap at al pops outlets wimp 24 hours of pipe installation.
<br />• Maintain edt fence, ncbdng the removal of aonunmOated sediment through
<br />completion of building construction. Set fence to be removed only after completion
<br />of bulding construction and upon establishment of vegetation.
<br />• Final grade swede areas upon stabilization of upstream areas
<br />• Sod MI dsturbed drainage areas, nciudng swabs pond overflows around storm
<br />sewer flared -end sections, and off - street catch basin.
<br />• Install underground utilities (eater, sanitary sewer, storm sewer) in a manner mat
<br />minimaes adverse impacts to the ctonowater BkPs.-
<br />• Provide temporary mulch over al pervious areas.
<br />• Upon grading completion the contractor shall provide native topsoil, seed and mulch
<br />anchored with a straight set dos within 48 hours of find grading.
<br />• Excess sod should be treated like other reposed sad and stabilized within 72 hours
<br />My soil stockpiles td how Mt fence placed around perimeter.
<br />• Adjacent streets shad be kept clean of oonetruetion materials, d"rf, and other
<br />ends/sable material. When materials or debris have washed /bowed onto adjacent
<br />streets. It is the Contractors responsibility to sweep /scrape streets as necessary or
<br />as directed by the City.
<br />EROGI0N Coma. lefa fie
<br />STRUCTURAL PRACTICES
<br />1. Set Fence - eel be Installed mks to any grading activities along the perimeter of
<br />those portions of the W wal fd. are downstream of storm water nm -off.
<br />2. Storm- Water Management - Strom eater drainage Mil be provided by sub and
<br />gutter. storm sewer and catch basin Run-off Is to be collected and routed to
<br />pre-treatment and ble- Atmtton basins.
<br />3, Storrs Serer Outlet Protection - such as rip -rap and geotastee Star fabric
<br />Mil be toadied of storm sewer outlets m a permanent erosion control
<br />manure
<br />4. Rode Construction Entrance - shed be end at ail locations where
<br />combustion middes leave site onto hard ourface roods
<br />5. Storm Sewer Wet Protection - shitl be used at al CBs to prevent cite
<br />sadlment from wading Into pending basin.
<br />CM-ER CONTROLS
<br />1. Construction Waste Materials - Ail waste materials generated as o result of site
<br />construction shag be collected and removed according to ail local and /or state
<br />waste management regulations by a licensed solid waste management company.
<br />The contractor ova ensure that all site personnel are instructed in these practices.
<br />2. Hazardous Wastes - Ad hozodous waste materials shall be stored properly to
<br />prevent spills and wnddiern. When necessory, hazardous wastes will be disposed
<br />of in the manner specified by bed and /or slate regulation or by the manufacturer.
<br />3. Sanitary Waste - All sanitary wrote wit be coll.ted from the portable unfts by a
<br />local, licensed water management company, as required by local regulation.
<br />4. Waits Vehicle Tracking - A rack construction entrance has been provided to help
<br />reduce vehicle tracking of sedbnente The paved street adjacent to the site
<br />entrance shall be swept on on as- needed basis. or as determined by the City.
<br />Dump trucks hauling loose material. (sand, topsoil. etc.) to and /or from the site
<br />shad be covered with a tarpaulin.
<br />5. Vehicle Cleaning - No engine degreasing is allowed on-site. Extend washing of
<br />vehicles to be confined to a defined area ('bone yard) on -sRn. The bone yard is
<br />to be at least 50 feet from any .$lOrm drain inlet and shall drain to a temporary
<br />pit of adequate volume to hold all liquid and wrote concrete materials generated
<br />during washout operation. Hardened concrete shall be broken up and disposed of
<br />as required by local regulation. If necessary. place set fence around bone yard
<br />area to ensure no sediments enter any storm water basin or storm sewer inlet
<br />16PECIIC318 MD MApI9NAN E PROCEDURES
<br />(Mho see 4rpecbtr end M ekdatrn0V tinder VENTRAL ErTOS/0N AND 9 10 CONTROL)
<br />The following are the inspection and maintenance practices that 091 be used to
<br />maintain erosion and sediment controls
<br />• Ad control measures will be Inspected at least once each week and folowbg any
<br />storm even of 0.5 inches or greater.
<br />• Al measures 011 be maintained in good working order, h a repair is necessary. h
<br />MR be initiated within 24 hours or report
<br />• Built up sediment Mil be removed frarm sit fence when ft has reached one -third
<br />(1/3) the height of the fens
<br />• Set fence w® be inspected for depth of sediment tears, to see if the fabric is
<br />.curdy attached to the fence posts, and to see that the fence posts are firmly
<br />in the grand
<br />• Temporary seeding and plantkg will be Inspected for bore mots, washouts, and
<br />healthy growth.
<br />• A maintenance report ell be mode after each Inspection.
<br />M SPITES permit is required for construction. Permit is to
<br />remote oo -site at of floes.
<br />The Owner and Contractor wall Dosses and be respasmle for
<br />implementation of SWPPP, and will be norponabe for erosion
<br />contrd measures on -site dotal fowl stobehaten has been
<br />achieved and a Notice of Termination (NOT) has been filed
<br />with the MPCA The Contractor and Owner shall make
<br />available to the City and watershed a Fist of contacts to be
<br />notified N repair. and /or maintenance to site erosion control
<br />measures are required
<br />Contractor to provide designated concrete truck washout area
<br />with appropriate signag0 at location shown (or location
<br />approved by Engineer). Washout area is to be a minimum of
<br />50' from storm trains, ditches pods, or rainwater garden
<br />area. Do not allow run-off from this arts by constructing o
<br />temporary pit or banned area large enough for liquid and solid
<br />west. After waste concrete Is set. break -up and dispose of
<br />properly
<br />Contractor to provide phased traffic control (In ocoordonce
<br />with the 'Minnesota Maraud of Uniform Traffic Control
<br />Devices') as neceasoy whenever grading. Litany work, paving
<br />operations, and final we restoration encroach wlthb
<br />right -of -way or onto adjacent street.
<br />Ad BMWs must be maintained with proper function untt all site
<br />work has been completed and site has undergone final
<br />strain otian. - -
<br />Contractor to provide topsoil stockpile at location designated
<br />by owner. Stockpile location(s) to be surrounded by sin
<br />fence, If stockpile is to be Inploae longer than 72 hours.
<br />provide seed and mulch.
<br />DRAWN BY:
<br />CHCICD BY:
<br />C.O.S.
<br />DESIGN BY:
<br />C.C.S.
<br />PROJ. N0.
<br />07 -1131
<br />ORIGINAL DATE
<br />FEBRUARY 9. 2007
<br />F
<br />99
<br />z
<br />a
<br />z
<br />a
<br />0
<br />0
<br />a
<br />0
<br />es
<br />Z
<br />O.
<br />cc
<br />R
<br />g
<br />ROYAL OAKS
<br />REALTY
<br />1000 COUNTY RD E,TIES
<br />8HOHE91Elf MN 55126
<br />PHONE (651) 483 -5518
<br />A
<br /><J
<br />818E PLANNING
<br />6 ENGINEERING
<br />PLOW!
<br />ENGINEERING, INC
<br />6776 TARE DRIVE
<br />SUITE 110
<br />LINO LAKES, MN 5501,
<br />PHONE: (651) 361 -821
<br />PAZ (651) 361 -8701
<br />C3