Laserfiche WebLink
• Growth Management, MUSA Reserve: The subject site is currently located within the <br />MUSA boundary area. <br />• <br />• <br />Growth Management, Units/Year: The table attached to this report shows the status of <br />the staging plans for final platting of new residential units. The seven new units of Grandview <br />would fit within the policy of 147 per year and so could be final platted immediately. <br />Preliminary Plat <br />Shoreland Ordinance: The subject site is adjacent to Marshan Lake, which is considered a <br />Natural Environment Lake and therefore is subject to the more restrictive Shoreland Ordinance <br />Requirements for Lot Dimensions, Impervious Surface Coverage, and Setbacks as listed below: <br />Lot Area <br />Lot Width <br />Impervious Surface <br />Coverage <br />Setback from <br />OHWL <br />Abutting <br />Non - Abutting <br />Abutting <br />Non - Abutting <br />20000 <br />10800 <br />80 <br />80 <br />30% <br />150 feet <br />Lots: The lots will vary in depth from 135 feet to 260 feet (along the shoreline), and the widths <br />will range from 80 feet to 86 feet. The lots located along Marshan Lake exceed the shoreland <br />ordinance required 20,000 square feet of upland, and the western lots all exceed the 10,800 <br />square foot R -1 requirement. The parsonage lot will be reduced in size to allow the other three <br />lots west of the proposed street to meet all subdivision standards. <br />Setbacks: The submitted plans depict all required setbacks, including the 150 foot setback from <br />the Ordinary High Water Line as required by the Shoreland Ordinance. This setback is measured <br />to any improvement attached to the single family dwelling, including decks and/or patios. This <br />means that the northeast lot (indicated as Lot 1, Block 2) will be very limited in that regard. <br />Impervious Surface Coverage: The lots will all be required to comply with the 30% <br />Impervious Surface Coverage requirement of the Shoreland Ordinance as they develop. <br />Streets: Stage Coach Trail will extend from the southern border to the northern border <br />connecting The Shores of Marshan Lake and Marshan Meadows. The alignment of the street is <br />proposed to vary slightly from the current easement granted by the church. This was <br />necessitated by the requirement to provide 20,000 square feet of upland for each lot along the <br />shoreline and will allow a seamless connection with the existing rights of way on either side of <br />the project. This proposal will require the approval of an easement vacation that will need to <br />accompany the final plat to the City Council. <br />