My WebLink
|
Help
|
About
|
Sign Out
Home
Search
07/11/2007 P&Z Packet
LinoLakes
>
Advisory Boards & Commissions
>
Planning & Zoning Board
>
Packets
>
2007
>
07/11/2007 P&Z Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/2/2014 3:02:13 PM
Creation date
7/2/2014 10:40:21 AM
Metadata
Fields
Template:
P&Z
P&Z Document Type
P&Z Packet
Meeting Date
07/11/2007
P&Z Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
70
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br />• <br />STORM WATER POLLUTION PREVENTION NOTES <br />NOTE THE FOi1DVANG MINNESOTA POLLUTION CONTROL AGENCY (MPG) REQUIREMENTS ARE INTEGRAL TO THE APPUCATON FOR GENERAL <br />STORM WATER PERMIT FOR CONSTRUCTION ACTIVITY (MNR100001). THIS SWPPP MUST BE KEPT DN THE CONSTRUCTOR SITE AT ALL <br />TIES ALONG WITH THE REQUIRED INSPECTOR REPORTS <br />� <br />VESSEL <br />6300 EAST RONDEAU LAKE DRIVE <br />HUGO, MN 55036 <br />Pit (E51) 26D -0448 <br />DINNERS RESPDK98A_fTY <br />1. OVERSEE' THE IMPLEMENTATION OF THE SIMPPP. <br />2. OVERSEE THE INSTALLATION, INSPECTION AND MAINTENANCE OF EROSION PREVENTION AND SEDIMENT CONTROL BMP'S BEFORE AND <br />DURING CONSTRUCTION. <br />Sfig2Q RACTORS <br />THE CONTRACTOR SHALL PROVIDE NAMES AND ADDRESSES OF ALL SUBCONTRACTORS WORKING ON THIS PROJECT WHO WILL BE INVOLVED <br />811H THE MAJOR CONSTRUCTION ACTIVITIES THAT DISTURB SOIL THAT INFORMAT10N MUST 85 KEPT WITH THIS SWPPP. <br />4: • •' r. 9.J110, i;i Mall w!r.Ji: w. : _ tll h <br />1. ALL EROSION CONTROL MEASURES MUST BE INSTALLED PRIOR TO COMMENCEMENT OF GRADING OPERATORS AND BE MAINTAINED UNTIL <br />ALL DISTURBED AREAS ON THE 517E HAVE BEEN RESTORED. <br />2. CONSTRUCTOR ENTRANCES SHALL BE SURFACED W111 CRUSHED ROCK AND DESIGNATED PRIOR TD CONSTRUCTOR (REFER TO DETAIL). <br />3 SPECIAL ATTENTION SHALL BE PAID TD STORM WATER DISCHARGE POINTS. THESE LOCATORS SHALL BE MONITORED DURING REQUIRED <br />INPSECTONS. E ANY SEDIMENT HAS BEEN DISCHARGED FROM THE STE. R SHALL BE REMOVED AND THE AREA SHALL BE RESTORED. <br />TEMPORARY EROSION CONTROL DEVICES AT DISCHARGE POINTS SHALL REMAIN IN PLACE UNTIL FINAL STABILIZATION OF UPSTREAM AREAS <br />HAS BEEN ACHIEVED. <br />4. ALL EXPOSED SOIL AREAS WITHIN 200 UNEAL FEET or SURFACE WATER MUST HAVE TEMPORARY PROTECTION OR PERMANENT COVER <br />TYPE OF SLOPE TIE (MAX THE AN AREA CAN REMAIN OPEN WHEN AREA !S NOT ACTIVELY BEING WORKED) <br />STEEPER THAN 3:1 7 DAYS <br />10:1 TD 3:1 14 DAYS <br />FLATTER THAN 10:1 21 DAYS <br />5. PIPE OUTLETS MUST CONTAIN RIP RAP WITHIN 24 HOURS OF CONNECTOR TO A SURFACE WATER. <br />6. STOCKPILE AREAS TO BE ENCIRCLED WITH SST FENCE. <br />7. ALL SLOPES 3:1 DR STEEPER, NOT TO BE SODDED AND GREATER THAN B HtL I A HEIGHT SHALL. HAVE EROSION CONTROL FABRIC <br />INSTALLED ON SLOPE PER MNDOT SPEC 3885. VERIFY REST:RATON METHOD AND SEEDING MIXTURE <br />6. TEMPORARY EROSION CONTROL 1D BE PLACED AROUND STORM SEWER STRUCTURES DURING CONSTRUCTOR (REFER TO DETAIL). <br />Ti. SEDIMENT SHALL BE REMOVED FROM ALL SEDIMENT CONTROL DEVICES AS NECESSARY AND MUST BE REMOVED IF DESIGN CAPACITY <br />HAS BEEN REDUCED BY 50X. <br />10. SEDIMENT TRACKED OFF -SITE, AS A RESULT OF CONSTRUCTOR TRAFFIC, SHALL BE MINIM AND SWEPT ON A DAILY BASIS <br />'It. ALL DISTURBED AREAS SHALL BE RESTORED WITH SOD, 5 ®, WOOD FIBER BLANKET, DR PAVED SURFACE WITHIN 14 DAYS OF ROUGH <br />GRADING <br />12. A COMPLETED STORY WATER PERMIT SHALL BE POSTMARKED AT LEAST 7 DAYS PRIOR TD COMMENCEMENT OF GRADING AC-FINITES. <br />13. THE CONTRACTOR SHALL FILE MPCA NOTICE OF TERMINATION AT COMPLETION OF SUBSTANTIAL TURF ESTABLISHMENT. <br />SEQUENCE OF CONSTRUCTOR <br />1. OBTAIN ALL NECESSARY PERMITS, INCLUDING NPDES GENERAL STORMWATER PERMIT. <br />2. INSTALL ALL PERIMETER SEDIMENT CONTROL DEVICES, TEMPORARY SEDIYENTATDN BASINS AND ROCK CONSTRUCTOR ENTRANCES. <br />1 CLEAR AND GRUB SITE <br />4. CONTACT QTY/TDWNSHIP INSPECTOR FOR APPROVAL OF ALL 5EDIMEN7 00818OL DEVICES <br />5. ROUGH GRADE <br />6. INSTALL TEMPORARY EROSION CONTROL DEVICES AS NECESSARY. <br />7. STABILE DENUDED AREAS AND STOCKPILES WATH114 14 DAYS OF LAST CONSTRUCTION ACTIVITY IN THAT AREA <br />B. INSTALL 541E IMPROVEMENTS (LE UTUTE5, STREETS. ETC). <br />4. COMPLETE GRADING AND INSTALL PERMANENT SEEDINGS AND PLANTINGS <br />111 ONCE ALL DISTURBED AREAS HAVE BEEN STABILIZED OBTAIN APPROVAL OF CITY/TOWNSiIP INSPECTOR. <br />It CONTRACTOR 10 REMOVE ALL TEMPORARY EROSION CONTROL DEVICES AFTER ACCEPTANCE BY THE CRY/ TOWNSHIP. <br />PEWAIERING AND BASIN DRAINAGE <br />PE811111 E MUST ENSURE CONSTRUCTOR ACTV1TES THAT INVLLVE DEWAIERING AND /OR BASIN DRAIMNG ARE ADEQUATELY PROTECTED <br />FROM 5805408 AND SCOUR. THE DISCHARGE MUST BE D?SPERgD OVER RIP RAP, SANDBAGS, PLASTIC SHEETING. OR OTHER ACCEPTABLE <br />DISSPA110N MEASURES DEWATERING DISCHARGE SHALL BE FREE OF TURBIDITY. <br />ALLOWABLE NON -STORM DISC7HARG'5 <br />ALL NON -STORM WATER DISCHARGES SHALL BE DIRECTED TO A SEDIMENT BASIN PRIOR TO 0150-1 ARM_ ALLOWABLE NON-STORM <br />DISCHARGES INCLUDE <br />1. OSQIARGES FROM FIRE FIGHTING ACTIVITIES <br />2. F1RE HYDRANT FLUSHING <br />3. WATER USED 70 WASH VEHICLES OR CONTROL DUST <br />4. WATER FLOWING FROM POTABLE SOURCES AND WATER LINE FLASHING <br />5. IRRIGATION DRAINAGE <br />6. EXTERNAL BUILDING WASH DOWN WHICH DOES NOT INCLUDE DETERGENTS <br />7. RUNOFF FROM PAVEMENT WASH -DOWN WHERE SPILLS OR LEAKS OF TOXIC OR HAZARDOUS MATERIALS HAVE N01 OCCURED (LINRFV= <br />ALL SPILLED MATERIAL HAS BEEN REMOVED) AND WHERE DETERGENTS HAVE NOT BEEN USED <br />B. AIR CONDITIONING CONDENSATE <br />1L SPRINGS AND UNCONTAMINATED WATER <br />10 FOLNDAICN OR F00TN DRAINS WHERE FLOWS ARE NOT CONTAMINATED WITH PROCESS MATERIALS SUCH AS SOLVENTS <br />11. DEWATERING DR BASIN DRAINING ACTMTIES <br />INSPECTIONS AND MAINTENANCE <br />1. THE PERMITTEE (OWNER OR OPERATOR) MUST INSPECT THE CONSTRUCTION SITE ONCE EVERY 7 DAYS DURING ACTIVE CONSTRUCTION <br />AND WITHIN 24 ROMPS AFTER A RAINFALL EVENT GREATER THAN 0.5 INCHES IN 24 HOURS <br />2. MSPECT10K5 AND MAINTENANCE TO BE RECORDED M WRITING <br />POLLUTION PREVENTION MANAGEMENT <br />1. THE PERMITTE5 SHALL IMPLEMENT THE FOLLOWING PO1UT10N PREVENTION MANAGEMENT MEASURES ON THE SITE <br />2. SLID WASTE SEDIMENC, ASPHALT AND CONCRETE MILLINGS, FLQATNG DEBRIS, PAPER, PLASTIC, FABRIC, CONSTRUCTOR AND <br />DEMOLITION OEHRl5 AND OTHER WASTES MUST BE DISPOSED OF PROPERLY AND RUST COMPLY WITH MPCA DISPOSAL REOUIREMENTS. <br />3. HAZARDOUS MATERIALS: DILL GASOLINE, PAINT, AND ANY HAZARDOUS SUBSTANCES RUST BE PROPERLY STORED, INQ.LIDING <br />SECONDARY CONTAINMENT, TO PREVENT SPILLS. LEAKS OR OTHER DISCHARGE RESTRICTED ACCESS 70 STORAGE AREAS MUST BE <br />PRCMOED TO PREVENT VANDAIJSI. STORAGE AND DL5P0SAL OF HAZARDOUS WAS1E MUST BE IN CDMPUANCE WITH MPCA REGULATORS <br />4. EXTERNAL WASHING OF TRUCKS AND OTHER CONSTRUCTION VE14CLE5 MUST BE mum 1D A DEFINED AREA OF THE 517E RUNOFF <br />MUST BE CONTAINED AND WASTE PROPERLY DESPISED OF. NO ENCRE DEGREASING 15 ALLOYED ON SITE <br />FINAL STABLL.LZAT0N <br />THE PERRITTEE MUST ENSURE FINAL STABILIZATION OF THE SITE FINAL STABILIZATION 15 ACHEVED WHEN TEMPORARY EROSION <br />PROTECTOR AND SILT FENCE FOR INDIVIDUAL LD15 HAS BEEN COMPLETED AND THE RESIDENCE HAS BEEN TRANSFERRED TO THE <br />HOMEOWNER ONCE THE SITE REACHES FINAL S1A31L12ATON, THE CONTRACTOR, OR GENERAL CONTRACTOR MUST COMPLETE AND SUBMIT <br />A 'NOTICE OF TERMINATION.' <br />Revisions <br />Ne. Dote By Rem/eft <br />B./R/07 <br />JEW <br />PER t71r COIYEN75 <br />511 AT <br />Xis <br />nF>< 017 =MEWS <br />I hereby cerWy that this Few Los prepared by <br />me or caner my bred slpe.ision and that <br />I an e ckiy [seere0 Profes iond Ender <br />under the foes of the Slate of Mrmesote. <br />Serrature <br />Nome MARC Dina& <br />Dote 2/16/67 <br />Licensed 420W <br />Desfped 1RX <br />Drown Tier; <br />Dole 7DJ4/06 <br />One eied <br />APWaWd <br />r <br />HL1 T <br />ASSOCIATES, INC. <br />s6r.e,erts <br />PD Box 37 <br />Forest Lake, MN 55026 <br />ph: (6651)454.3136 <br />fa>_ (651) 464 -437.2 <br />malt: huttlffdrasom <br />Med <br />Brian Wessel <br />Prvietg <br />MOOn Marsh at Lino Lakes <br />UM Lakes. MN <br />D 50 10D 2DD <br />RECEIVED <br />JUN 0 8 2007 <br />CITY OF LINO LAKES <br />400 <br />SCAB <br />IN <br />r I <br />nee Tian <br />Storm Water Pollution Prevention Notes <br />Shed <br />WILT FILE NE.: ALM <br />
The URL can be used to link to this page
Your browser does not support the video tag.