• <br />• <br />Main Street Village <br />page 5 <br />The following summarizes the project proposal: <br />Gross Site Area 28.3 acres <br />Upland Area 24.0 acres <br />Wetland 4.3 acres <br />Currently Proposed <br />Development Area <br />including Outlot A 8.7 acres <br />Lots: The table lists the submitted data. This reflects revised lot sizes and a new wetland <br />delineation for the large wetland on the southern portion of the site. <br />Water and Sanitary Sewer: The project will be served by municipal utilities. Ample <br />capacity exists in the systems. Water looping through the development ultimately will be <br />needed for proper flow. Whether or not the system must be looped in this first phase is being <br />determined. <br />Wetlands and Stormwater Management: The Rice Creek Watershed District <br />(RCWD) approved the delineation of the wetlands and the mitigation plan in 2006. However, <br />that mitigation plan application did not include wetland fill and mitigation necessary for the <br />future access route (with the southern driveway). Since this will be the main access to the <br />retail center in the future, it is vital to know if this `road' can be constructed. The wetland <br />impacts and mitigation are an integral part of this question. A new wetland delineation was <br />submitted to, reviewed, and approved by the RCWD. This included an amendment to the <br />delineation of the large, southern wetland. <br />Drainage and utility easements must be established that cover and extend 10' beyond the <br />wetlands, in accordance with City requirements. There will be an easement over the <br />incidental wetlands in Outlot C because they will become stormwater ponds. <br />gross sf <br />gross acres <br />upland sf <br />upland acres <br />Lot 1, Block 1 <br />35,175 <br />0.8 <br />35,175 <br />0.8 <br />Lot 2, Block 1 <br />55,831 <br />1.3 <br />55,831 <br />1.3 <br />Lot 1, Block 2 <br />66,196 <br />1.5 <br />61,169 <br />1.4 <br />Lot 2, Block 2 <br />130,031 <br />3.0 <br />130,031 <br />3.0 <br />Outlot A (private road) <br />96,058 <br />2.2 <br />96,058 <br />2.2 <br />subtotal <br />383,291 <br />8.8 <br />378,264 <br />8.7 <br />Outlot B <br />677,301 <br />15.5 <br />588,452 <br />13.5 <br />Otter Lake Road ROW <br />to be dedicated <br />4,393 <br />0.1 <br />4,393 <br />0.1 <br />Outlot C <br />55,779 <br />1.3 <br />7,238 <br />0.2 <br />Outlot D <br />113,302 <br />2.6 <br />67,896 <br />1.6 <br />total <br />1,234,066 <br />28.3 <br />1,046,243 <br />24.0 <br />Water and Sanitary Sewer: The project will be served by municipal utilities. Ample <br />capacity exists in the systems. Water looping through the development ultimately will be <br />needed for proper flow. Whether or not the system must be looped in this first phase is being <br />determined. <br />Wetlands and Stormwater Management: The Rice Creek Watershed District <br />(RCWD) approved the delineation of the wetlands and the mitigation plan in 2006. However, <br />that mitigation plan application did not include wetland fill and mitigation necessary for the <br />future access route (with the southern driveway). Since this will be the main access to the <br />retail center in the future, it is vital to know if this `road' can be constructed. The wetland <br />impacts and mitigation are an integral part of this question. A new wetland delineation was <br />submitted to, reviewed, and approved by the RCWD. This included an amendment to the <br />delineation of the large, southern wetland. <br />Drainage and utility easements must be established that cover and extend 10' beyond the <br />wetlands, in accordance with City requirements. There will be an easement over the <br />incidental wetlands in Outlot C because they will become stormwater ponds. <br />