My WebLink
|
Help
|
About
|
Sign Out
Home
Search
12/12/2007 P&Z Packet
LinoLakes
>
Advisory Boards & Commissions
>
Planning & Zoning Board
>
Packets
>
2007
>
12/12/2007 P&Z Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/3/2014 3:43:22 PM
Creation date
7/2/2014 12:21:56 PM
Metadata
Fields
Template:
P&Z
P&Z Document Type
P&Z Packet
Meeting Date
12/12/2007
P&Z Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
105
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br />• <br />Main Street Village <br />page 5 <br />The following summarizes the project proposal: <br />Gross Site Area 28.3 acres <br />Upland Area 24.0 acres <br />Wetland 4.3 acres <br />Currently Proposed <br />Development Area <br />including Outlot A 8.7 acres <br />Lots: The table lists the submitted data. This reflects revised lot sizes and a new wetland <br />delineation for the large wetland on the southern portion of the site. <br />Water and Sanitary Sewer: The project will be served by municipal utilities. Ample <br />capacity exists in the systems. Water looping through the development ultimately will be <br />needed for proper flow. Whether or not the system must be looped in this first phase is being <br />determined. <br />Wetlands and Stormwater Management: The Rice Creek Watershed District <br />(RCWD) approved the delineation of the wetlands and the mitigation plan in 2006. However, <br />that mitigation plan application did not include wetland fill and mitigation necessary for the <br />future access route (with the southern driveway). Since this will be the main access to the <br />retail center in the future, it is vital to know if this `road' can be constructed. The wetland <br />impacts and mitigation are an integral part of this question. A new wetland delineation was <br />submitted to, reviewed, and approved by the RCWD. This included an amendment to the <br />delineation of the large, southern wetland. <br />Drainage and utility easements must be established that cover and extend 10' beyond the <br />wetlands, in accordance with City requirements. There will be an easement over the <br />incidental wetlands in Outlot C because they will become stormwater ponds. <br />gross sf <br />gross acres <br />upland sf <br />upland acres <br />Lot 1, Block 1 <br />35,175 <br />0.8 <br />35,175 <br />0.8 <br />Lot 2, Block 1 <br />55,831 <br />1.3 <br />55,831 <br />1.3 <br />Lot 1, Block 2 <br />66,196 <br />1.5 <br />61,169 <br />1.4 <br />Lot 2, Block 2 <br />130,031 <br />3.0 <br />130,031 <br />3.0 <br />Outlot A (private road) <br />96,058 <br />2.2 <br />96,058 <br />2.2 <br />subtotal <br />383,291 <br />8.8 <br />378,264 <br />8.7 <br />Outlot B <br />677,301 <br />15.5 <br />588,452 <br />13.5 <br />Otter Lake Road ROW <br />to be dedicated <br />4,393 <br />0.1 <br />4,393 <br />0.1 <br />Outlot C <br />55,779 <br />1.3 <br />7,238 <br />0.2 <br />Outlot D <br />113,302 <br />2.6 <br />67,896 <br />1.6 <br />total <br />1,234,066 <br />28.3 <br />1,046,243 <br />24.0 <br />Water and Sanitary Sewer: The project will be served by municipal utilities. Ample <br />capacity exists in the systems. Water looping through the development ultimately will be <br />needed for proper flow. Whether or not the system must be looped in this first phase is being <br />determined. <br />Wetlands and Stormwater Management: The Rice Creek Watershed District <br />(RCWD) approved the delineation of the wetlands and the mitigation plan in 2006. However, <br />that mitigation plan application did not include wetland fill and mitigation necessary for the <br />future access route (with the southern driveway). Since this will be the main access to the <br />retail center in the future, it is vital to know if this `road' can be constructed. The wetland <br />impacts and mitigation are an integral part of this question. A new wetland delineation was <br />submitted to, reviewed, and approved by the RCWD. This included an amendment to the <br />delineation of the large, southern wetland. <br />Drainage and utility easements must be established that cover and extend 10' beyond the <br />wetlands, in accordance with City requirements. There will be an easement over the <br />incidental wetlands in Outlot C because they will become stormwater ponds. <br />
The URL can be used to link to this page
Your browser does not support the video tag.