Laserfiche WebLink
Main Street Village Page 3 November 19, 2007 <br />Drainage Review <br />City of Lino Lakes, Minnesota <br />17. Include a detail of the Enekamat overflow for biofiltration basin 9 on the plan. <br />18. It is highly recommended that the curb cut openings be a minimum of five feet. Past <br />experience has shown that water flowing in the curb line may bypass a curb cut opening that <br />is less than five feet. <br />19. Include a note on the plan stating that the sod filter strip at each curb cut needs to be lower <br />than the back of the curb cut. <br />• <br />