My WebLink
|
Help
|
About
|
Sign Out
Home
Search
01/25/2011 Env Bd Packet
LinoLakes
>
Advisory Boards & Commissions
>
Environmental Board
>
Packets
>
2011
>
01/25/2011 Env Bd Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/29/2014 2:38:18 PM
Creation date
7/7/2014 11:50:28 AM
Metadata
Fields
Template:
Environmental Board
Env Bd Document Type
Env Bd Packet
Meeting Date
01/25/2011
Env Bd Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DRAFT 01 -19 -2011 <br />The minimum information requirements of the Stormwater Management Plan shall be consistent <br />with the most recent version of the NPDES Permit requirements and include the following <br />information: <br />(a) A Grading, Erosion and Sediment Control Plan and, for projects that require a <br />NPDES permit, a Stormwater Pollution Prevention Plan. <br />(b) Bankfull discharge rate of creek, stream, or river if there is a water course on the <br />site or if the site discharges directly to the water course. <br />(c) Existing and Proposed hydrologic calculations for total runoff volume and peak <br />discharge rates by subwatershed for the 2 -year 24 -hour frequency event, 10 -year 24 -hour <br />frequency event, and 100 -yr 24 -hour frequency event or the 100 -year 10 -day snowmelt. These <br />shall include: <br />1. Assumed runoff curve numbers. <br />2. Time of concentration used in calculations. <br />3. Pre - existing total runoff volume and peak discharge rates. <br />4. Configuration of all drainage areas. <br />5. Total amount of new impervious surfaces created by the project. <br />6. Post - construction total runoff volume and peak discharge rates with no detention. <br />7. Post - construction total runoff volume and peak discharge rates with detention. <br />(d) Locations of all stormwater management practices, infiltration areas, and areas <br />not to be disturbed during construction. <br />(e) Location of all drain tiles on the project site shall be identified. <br />(f) Location and engineered designs for structural stormwater management practices <br />including stormwater treatment devices that remove oil and floatable material (e.g., basin outlets <br />with submerged inlets). <br />(g) Normal water level, high water level, and emergency overflow elevations for the <br />site and all ponding systems. <br />(h) Layout of proposed streets showing centerline gradients, section widths and <br />typical cross sections. <br />Alternative Format 12 <br />• <br />• <br />• <br />
The URL can be used to link to this page
Your browser does not support the video tag.