Laserfiche WebLink
DRAFT 01 -19 -2011 <br />(b) Public Stormwater Facilities <br />1. Acceptance of Publicly Owned Facilities Before work under the permit is deemed <br />complete, as- builts and certification must be submitted demonstrating at the time of final <br />stabilization that the stormwater facilities conform to design specifications. A final inspection <br />shall be required before the City accepts ownership of the stormwater facilities. <br />2. Inventory of Stormwater Facilities. The City shall inventory and maintain a <br />database for all public stormwater facilities within the City requiring maintenance to ensure <br />compliance with this ordinance. <br />3. Maintenance. The City shall perform maintenance of publicly owned stormwater <br />facilities within the City as provided for in the local surface water management plan. <br />1011.11 PLAN REVIEW PROCEDURE <br />(1) Plan Review. The applicant shall not commence any construction activity subject to this <br />ordinance until the Stormwater Management plan and/or the Grading, Erosion and Sediment <br />Control plan have been approved by the City. The submittal shall be processed in accordance <br />with Section 2 of the Zoning Ordinance or Section 1011.00 of City Code as applicable. City <br />approval is contingent on issuance of all other permits required by the City or other agencies <br />having jurisdiction on the project. The following standards shall apply to all developments <br />within the City: <br />(2) Plan Approval. If the City determines that the stormwater management plan and/or the <br />Grading, Erosion and Sediment Control plan meets the requirements of this ordinance, the City <br />shall issue a plan approval valid for a specified period of time that authorizes the land <br />disturbance activity contingent on the implementation and completion of this plan. <br />(3) Plan Denial. If the City determines that the plan does not meet the requirements of this <br />ordinance, the City shall not issue plan approval for the land disturbance activity. This plan must <br />be resubmitted for approval before the land disturbance activity begins. All land use and building <br />permits shall be suspended until the developer has an approved ESC or Stormwater Management <br />permit. <br />(4) Modification of Plan. The applicant must amend the plan as necessary to include <br />additional requirements such as additional or modified BMPs designed to correct problems <br />identified or address situations whenever: <br />(a) A change in design, construction, operation, maintenance, weather, or seasonal <br />conditions that has a significant effect on the discharge or pollutants to surface waters or <br />underground waters <br />Alternative Format 20 <br />• <br />• <br />• <br />