My WebLink
|
Help
|
About
|
Sign Out
Home
Search
02/23/2011 Env Bd Packet
LinoLakes
>
Advisory Boards & Commissions
>
Environmental Board
>
Packets
>
2011
>
02/23/2011 Env Bd Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/29/2014 2:38:31 PM
Creation date
7/7/2014 11:57:28 AM
Metadata
Fields
Template:
Environmental Board
Env Bd Document Type
Env Bd Packet
Meeting Date
02/23/2011
Env Bd Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
33
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
FINAL DRAFT 02 -23 -2011 <br />(e) The City may require additional erosion and sediment control measures on areas <br />with a continuous slope leading to a sensitive, impaired or special water body, stream, ditch or <br />wetland to assure retention of sediment on site. <br />(f) The plan must include conditions adequate to protect facilities to be used for post - <br />construction stormwater infiltration. <br />(g) The plan must include conditions to minimize off -site sediment transport on <br />trucks and equipment. <br />(h) The plan must minimize work in and adjacent to water bodies and wetlands. <br />(i) <br />Stable slopes shall be maintained throughout the construction process. <br />(j) Steep slopes and the need for high cuts and fills shall be avoided (no slopes <br />greater than 3(h):1(v), except as approved by the City engineer). <br />(k) Protection shall be provided to minimize disturbance to surrounding soils, root <br />systems and trunks of trees adjacent to site activity that are intended to be left standing. <br />(1) Compaction of site soils shall be minimized. <br />(m) Using and maintaining temporary and permanent soil stabilization. <br />(n) All imported materials shall be approved by the City Engineer prior to placement <br />on the site. <br />(o) Appropriate on -site containment must be provided for all trash, solid waste, <br />construction debris, floating debris, and hazardous materials. Disposal of collected sediment <br />shall be deposited only in approved locations. <br />(4) Construction Activity Requirements. Any activity subject to a permit under this ordinance <br />must conform to the standards of the NPDES general permit regarding construction -site erosion <br />and sediment control. <br />(5) Final Stabilization. <br />(a) Erosion and sediment control measures must be maintained until final vegetation <br />and ground cover is established to a density of 70 %. <br />(b) All temporary erosion and sediment control BMPs will be removed after all <br />disturbed areas have been permanently stabilized. <br />1011.09 STORMWATER MANAGEMENT REQUIREMENTS <br />10 <br />• <br />• <br />
The URL can be used to link to this page
Your browser does not support the video tag.