My WebLink
|
Help
|
About
|
Sign Out
Home
Search
07/27/2011 Env Bd Packet
LinoLakes
>
Advisory Boards & Commissions
>
Environmental Board
>
Packets
>
2011
>
07/27/2011 Env Bd Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/29/2014 2:39:04 PM
Creation date
7/7/2014 12:27:50 PM
Metadata
Fields
Template:
Environmental Board
Env Bd Document Type
Env Bd Packet
Meeting Date
07/27/2011
Env Bd Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
38
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ENVIRONMENTAL BOARD MEETING April 27, 2011 <br />Mr. Studenski stated preventative measures are the biggest part of the program. <br />The City goes out through calls from residents, etc. If the problems are taken care <br />of early on, this means we do not having to expend the higher cost. <br />Ms. O'Dea questioned hiring private contractors for sweeping. Mr. Payne stated <br />the 6 surface water projects were all contracted out He stated the City staff does <br />everything they have the capability to do. There is a bidding process for the work <br />the City does not have the ability to do. <br />Mr. DeHaven stated that people who call the City, is it by appointment only? He <br />stated it sounds a little bit like appointment only. <br />Mr. Studenski stated all options are out there. Mr. Asleson stated the City follows <br />up on all calls, reports, etc. <br />Mr. Studenski stated through the system that is in place, the City has found <br />structures and pipe they did not know were out there. <br />Ms. Bor questioned the inspection hours quoted for 2010 and were Mr. Payne's <br />hours above included in those quoted. Mr. Payne stated his hours were included <br />in doing inspections with the hours of cleaning catch basin grates, etc. <br />Mr. DeHaven stated if this goes out to bid, does it go to a different person every <br />year. <br />Mr. Studenski stated yes. There is a Public Notice posted so that anyone can bid <br />on the work. He stated local groups /contractors are probably most <br />knowledgeable. <br />Mr. DeHaven stated he likes how the City of Minneapolis handled this. They <br />said please everybody in the City, please everybody take care of your own sewers, <br />take care of your gutters, etc. and it worked. <br />Mr. Studenski stated both the City and MCF are trying to get the word out, along <br />with public education. Mr. Asleson stated there have been many requests to the <br />public thorough newspapers and newsletter articles. <br />Ms. O'Dea asked once again if there were comments from the public. This is the <br />last request for comments from the public. There were none. <br />Mr. DeHaven stated he is proud of the board's sincerity about what they are <br />doing. He stated they must love the city and love what you are doing. <br />Mr. Studenski stated as of today, there are no written comments. <br />DRAFT MINUTES 4 <br />• <br />• <br />
The URL can be used to link to this page
Your browser does not support the video tag.