Laserfiche WebLink
3. In order to help the City identify new recyclers, the Contractor will send a <br />monthly "Cart Delivered" report to the City. <br />4. All Containers delivered for recycling will have a printed education flyer <br />attached to the lid outlining the details of the Recycling Program. <br />5. The Contractor will meet with the City at least once every quarter to <br />discuss and consider outreach and educational information and materials <br />to promote recycling, target specific Recyclable Materials, and identify <br />problem materials that are not acceptable. <br />F. The Contractor will provide Containers or equivalent at the City's public works <br />facility for delivery of Recyclable Materials collected by City employees in the <br />City parks and at City events. Size of Containers and frequency of collection will <br />match the need. Public "drop -off' will not be allowed. <br />SECTION 4. TERM OF CONTRACT <br />A. The term of this Contract shall be January 1, 2011 through December 31, 2012 <br />(the "Contract Term "). <br />SECTION 5. PREPARATION FOR COLLECTION <br />A. All occupants of' Residential Properties in the City will be directed to prepare and <br />store Recyclable Materials in a manner consistent with the Contractor's collection <br />program. <br />• <br />B. City residents will be advised that containers in which Recyclable Materials have <br />been stored must be placed on the boulevard area of the street in front of their <br />residence for collection. Containers must be placed for collection by 6:30am on <br />the scheduled day of collection. <br />C All Recyclable Materials placed for collection shall be owned -by, - and_be_ the <br />__ <br />responsibility of, the occupants of each Residential Property until said materials <br />are handled by the Contractor. Upon handling of the Containers and Recyclable <br />Materials by the Contractor, the Recyclable Materials become the property and <br />responsibility of the Contractor. <br />SECTION 6. CONTRACTOR'S EQUIPMENT <br />A. All vehicles used by the Contractor in picking up the Recyclable Materials from <br />the Residential Properties shall be painted and marked uniformly and shall be <br />identified on both sides of the vehicle. Broom and shovel in good usable <br />condition shall be placed and maintained on each vehicle. <br />B. The Contractor shall make all collections of Recyclable Materials in vehicles with <br />closed tops on the load portion so that contents will not spill or leak. All of the <br />Contractor's receptacles and vehicles shall be kept clean and as free from <br />3 <br />