My WebLink
|
Help
|
About
|
Sign Out
Home
Search
10/24/2012 Env Bd Packet
LinoLakes
>
Advisory Boards & Commissions
>
Environmental Board
>
Packets
>
2012
>
10/24/2012 Env Bd Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/29/2014 2:37:16 PM
Creation date
7/7/2014 3:58:44 PM
Metadata
Fields
Template:
Environmental Board
Env Bd Document Type
Env Bd Packet
Meeting Date
10/24/2012
Env Bd Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
46
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Permit Application Number: <br />Permit Applicant Name: <br />12 -078 <br />Bill's Suprette <br />Applicant: <br />Grant Rademacher <br />Bill's Suprette and G -Will Liquors <br />14021 Road Lake Blvd <br />Andover, MN 55304 <br />Ph: 763- 536 -9600 <br />grantr @rademacherco.com <br />Project Name: <br />Purpose: <br />Site Size: <br />Location: <br />T -R -S: <br />District Rule: <br />Consultant: <br />Michael Brandt <br />MFRA <br />14800 28th Avenue N. <br />Plymouth, MN 55447 <br />Ph: 763 - 476 -6010 <br />Fx: 763- 476 -8532 <br />mbrandt @mfra.com <br />John Patterson <br />Fender Patterson Construction, Inc. <br />4839 West 124th Street <br />Savage, MN 55378 <br />Ph: 952 - 890 -4364 <br />Fx: 952 - 890 -2916 <br />jpatterson@fendlerpatterson.com <br />Bill's Suprette <br />FSD — Final Site Drainage; A commercial development of a gas station and liquor store <br />Site size and disturbed area is 4.65± acres; 0± acres existing, 3.04± acres proposed <br />impervious surface <br />Lake Drive and Main Street, Lino Lakes <br />SW 'A, Section 4, T31 N, R22W <br />C, D, RMP -3 <br />Recommendations: INCOMPLETE <br />This application does not include all items necessary to ensure the proper sizing and placement of <br />facilities: <br />(Note: bolded items are required to be a complete application, remaining items may be submitted <br />following the determination of permit completeness) <br />Rule C - Stormwater <br />1. Applicant must meet the storm water requirements for RMP -3, which requires an <br />additional 0.5 -inch (8,258 cubic feet) of volume reduction via one of the specific methods <br />listed in the table in RMP -3 Section 8(c). The applicant must address this requirement. <br />2. Applicant must resubmit the existing and proposed conditions hydrologic models (2 -year, <br />100 -year rainfall, 10 -day snowmelt) addressing comments below: <br />Per Rule C.3(a), composite Curve Numbers shall not include directly connected <br />impervious surfaces. <br />• Per Rule C.3(b), in determining Curve Numbers to model runoff in the post - <br />development condition, the Hydrologic Soil Group (HSG) of areas within <br />construction limits is to be shifted down one classification (or 1/2 classification for <br />HSG A (to CN 49)) to account for the impacts of grading on soil structure unless <br />Houston Engineering Inc. Page 1 of 5 10/9/2012 <br />
The URL can be used to link to this page
Your browser does not support the video tag.