Laserfiche WebLink
5.2.2 Marshan RMU Subwatershed <br />Table 10. RMU Specific Actions: Marshan RMU <br />Actions identified by Issue Category <br />wiTrER RATE & QUA x <br />Evaluate opportunities for volume reduction in key subwatersheds including MAR -0059, MAR -108 and MAR -110. <br />Ensure that development and redevelopment construct onsite volume controls to alleviate the potential flooding <br />without increasing downstream discharge of urban hydrology to Marshan Lake. <br />Address impairments for Marshan Lake as identified in the TMDL study and in the implementation plan when this <br />effort is completed. <br />Maximize load reduction on city projects. Evaluate cost effective options to improve water quality treatment BMPs <br />for both development and redevelopment projects to increase treatment efficiency beyond the minimum required. <br />Promote the use of rain gardens, native plantings, and reforestation within existing development areas as a means <br />of increasing infiltration, evapotranspiration, and filtration of runoff conveying pollutant loads to the lakes. <br />Investigate the potential for expanding storage and nutrient retention /removal from the existing loads (prior to <br />discha • in • to Marshan Lake ad'acent to the lower branch of 10 -22 -32 between I -35W and Lake Drive <br />WETLAND MANAGEMENT , <br />Conduct wetland restoration projects for banking in the upper branches of the 10 -22 -32 ditch system and in the <br />large area in northwest Lino Lakes (the area generally located north of Carl Street and west of 4th Avenue) that is <br />rimaril used for sod MAR -097 . <br />Evaluate and address floodplain impacts with new and redevelopment proposals in accordance with watershed <br />and city requirements. <br />,gg <br />Collaborate with the RCWD to design culverts in catchments MAR -059, MAR -108, and MAR- 110 to resolve <br />capacity issues in Anoka County Ditch 10- 22 -32. <br />Review RCWD Consolidation Report for 10 -22 -32 to determine how much of a management plan the District has <br />develo•ed to date. <br />GROUNDWATER MANA ENT` <br />No implementation activities identified. <br />Provide an open space connection between Columbus and Blaine as identified in the DNR Metro Greenways <br />corridor. <br />Address corridor gap caused by habitat fragmentation from existing and planned housing and roads. Address gap <br />through landscaping strategies, wildlife movement strategies, road design and minimal runoff, and homeowner <br />education. <br />EROSION AND SEDI s <br />Evaluation of current stream bank erosion sites on 10- 22 -32. <br />REGULATIONS, PERM! <br />Complete Subwatershed Management Plan. <br />Coordinate with future developers to implement cross - sections for Penoc Branch, Branch 14 Lower, and Branch <br />15 Lower into Resource Management System plan. <br />No implementation activities identified. <br />' N, I <br />No implementation activities identified. <br />No implementation activities identified. <br />City of Lino Lakes SWMP 1 February 8, 2013 Draft 1 76 <br />• <br />• <br />• <br />