My WebLink
|
Help
|
About
|
Sign Out
Home
Search
05/29/2013 Env Bd Packet
LinoLakes
>
Advisory Boards & Commissions
>
Environmental Board
>
Packets
>
2013
>
05/29/2013 Env Bd Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/29/2014 2:33:11 PM
Creation date
7/8/2014 10:18:51 AM
Metadata
Fields
Template:
Environmental Board
Env Bd Document Type
Env Bd Packet
Meeting Date
05/29/2013
Env Bd Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2012 Accomplishments <br />Illicit Discharge Detection and <br />Elimination <br />(MCM 3) <br />• an) discharge to a Municipal Separate <br />Storm Sewer Systems (MS4) that is <br />not composed entirely of storm - <br />water <br />Improved storm sewer map to <br />Include sub-watersheds catchment <br />areas and outtalls of al szes <br />Created an Illicit Discharge <br />Detection and E Itm natal, Plan that <br />includes ident■f.cation of non-storm <br />flows procedures report form. etc <br />- Deve loping ODE ordinance (for <br />2010) <br />2012 Accomplishments <br />Construction Site <br />Stormwater Runoff <br />Control <br />(MCM 4) <br />• 38 notices Of violation <br />No Stop Work Orders <br />2012 Accomplishments <br />Post-ConstrC: :' r <br />eo.o.n5 Pc Comtsat0 <br />Re*eveintvoe, <br />.varhin a <br />sto.^,ater cvdinani, itor <br />Rite iairt <br />Svennwater Retrofit Asuuntertt <br />• <br />• <br />• <br />4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.